Sie sind auf Seite 1von 4

bw

hw tirante

1.2
0.59

0.7 m2

PRDIDA DE CARGA HIDRALICA EN LA ALCANTARILLA


Q=
0.7
v2 (dren)
1 MAX
v3
0.63
v2 ^2 /2g
0.05
v3^2 /2g
0.02
A=Q/V2 =
0.7 m2
ENTRADA
k
0.5
CORRECTO
hE
0.025
SALIDA
k
1
hS
0.03
DREN
Q=
A dren=
V dren=
CARGA DE VELOCIDAD
Hv= Vdren^2/2g

0.708

0.7
0.7 m2
1 m/seg
0.05 m

CLCULO DE ELEVACION 2 E2
E1 + Y1=
100
hw+1.5hv =
0.59 +
E2 =
100.59 LONGITUD DE LA ALCANTARILLA L
z
1.5
b ancho camino
1
Ef-E2=
101.6 H cobertura =
1.675 m
x=
2.5125
Longitud del Dren
L = b+2*x=
1+

0.59
0.075
0.665

=
=
=

100.59
0.665
99.925

99.925 =

1.675

5.025 =

6.025

0.030125 =

99.894875

Pendiente mnima del dren Sf = 0.005


d = 0.005*L=
0.030125 m
CLCULO DE ELEVACION 3 E3
E3=E2-d=

99.925 -

PRDIDA DE FRICCION DEL DREN hf

Q
n
A
P
R

0.7
0.013
0.7
2.38
0.29411765

m3/s

Sf
hf=Sf*L=

0.00086402
0.00086402 *

m2
m
m

PRDIDA DE LA CARGA HIDRALICA TOTAL hT


hT= hE+hS+hF =
0.025 +
CLCULO DE ELEVACION 4 E4
Factor de seguridad de 10%
h = 1.1*hT =
1.1 *
NIVEL DE ENERGA EN 1
"1"=
COTA A + Y1+V1^2/2g
"1"=
100 +
NIVEL DE ENERGA EN 4
"1" - h
"4"=
"4"=
100.61 -

6.025 =

0.03 +

0.06020574 =

0.59 +

0.06622631 =

CARGA HIDRALICA DISPONIBLE


"1"-"4"=
100.61 100.543774 =
PRDIDA
CARGA
0.07 CORRECTO
0.07

0.00520574

0.00520574 =

0.06622631 m

0.02 =

100.543774 m

0.06622631 m

0.06020574 m

100.61

Das könnte Ihnen auch gefallen