LRT - CONTRUCTION AND COMPLETION OF FACILITIES WORKS

(PACKAGE B) FOR THE AMPANG (AMG) LINE EXTENSION PROJECT

Location:
As-Built Chainage:
As-Built Coordinate :
Base Plate:
Date

11/28/2013
12/4/2013
12/12/2013
19/12/2013
12/28/2013
1/2/2014
1/9/2014
1/23/2014
1/27/2014
2/4/2014
2/8/2014
2/12/2014
2/15/2014
2/19/2014
2/22/2014
2/27/2014
3/5/2014
3/8/2014
3/13/2014
3/17/2014
3/20/2014
3/22/2014
3/27/2014
4/2/2014
4/9/2014
4/11/2014
4/16/2014
4/19/2014
4/23/2014
4/25/2014
4/30/2014
5/2/2014
5/7/2014
5/9/2014
5/14/2014
5/16/2014
5/21/2014
5/23/2014
5/28/2014
5/30/2014
6/4/2014
6/5/2014
6/11/2014
6/13/2014
6/18/2014
6/20/2014
6/25/2014
6/27/2014
7/2/2014
7/4/2014
7/9/2014
9/11/2014
7/16/2014
7/19/2014
8/4/2014
8/8/2014
8/13/2014
8/15/2014
8/20/2014
8/23/2014
8/27/2014
8/28/2014
9/4/2014
9/6/2014
9/10/2014
9/13/2014
10/2/2014
10/4/2014
10/8/2014
10/10/2014

RL 6.042
Days

SETTLEMENT GAUGE MONITORING RECORDS (DEPOT)


SP 14 ( ROAD D )
CH 548.187 O/F 2.064
N 79558.242 E 86200.077
Date Installed :

Filling
Level
1
m RL
8.135
8.133
8.012
8.036
8.03
8.031
8.03
8.086
8.241
8.15
8.21
8.239
8.227
8.238
8.236
8.188
8.240
8.207
8.203
8.2
8.198
8.197
8.195
8.176
8.174
8.179
8.179
8.194
8.176
8.182
8.192
8.183
8.189
8.18
7.998
7.982
7.973
7.969
7.955
7.945
7.962
7.965
7.971
7.969
7.971
7.981
7.99
7.978
7.981
7.976
7.97
7.966
7.97
7.965
7.954
7.949
7.94
7.947
7.943
7.94
7.949
7.951
7.955
7.95
7.9
7.957
7.95
7.961
7.966
7.963

Top of Rod

11/28/2013

Rod
Extend
4
m

Total
Length of Rod
5
m

Base Plate
Level
6 = (2-5)
m RL

Thickness of
Fill
7 = (1-6)
m

Settlement

2
m RL

Top length
of Rod
3
m

8.584
8.582
8.554
8.549
8.542
8.535
8.534
8.349
8.335
8.324
8.310
8.299
8.302
8.297
8.297
8.290
8.235
8.234
8.232
8.232
8.232
8.230
8.228
8.228
8.228
8.228
8.227
8.153
8.153
8.152
8.150
8.149
8.146
8.146
8.146
8.146
8.146
8.146
8.146
8.146
8.146
8.146
8.146
8.146
8.146
8.146
8.146
8.146
8.140
8.140
8.140
8.140
8.140
8.140
8.133
8.133
8.130
8.130
8.130
8.130
8.130
8.130
8.130
8.130
8.130
8.130
8.130
8.130
8.130
8.130

2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542

2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542
2.542

6.042
6.040
6.012
6.007
6.000
5.993
5.992
5.807
5.793
5.782
5.768
5.757
5.760
5.755
5.755
5.748
5.693
5.692
5.690
5.690
5.690
5.688
5.686
5.686
5.686
5.686
5.685
5.611
5.611
5.610
5.608
5.607
5.604
5.604
5.604
5.604
5.604
5.604
5.604
5.604
5.604
5.604
5.604
5.604
5.604
5.604
5.604
5.604
5.598
5.598
5.598
5.598
5.598
5.598
5.591
5.591
5.588
5.588
5.588
5.588
5.588
5.588
5.588
5.588
5.588
5.588
5.588
5.588
5.588
5.588

2.093
2.093
2.000
2.029
2.030
2.038
2.038
2.279
2.448
2.368
2.442
2.482
2.467
2.483
2.481
2.440
2.547
2.515
2.513
2.510
2.508
2.509
2.509
2.490
2.488
2.493
2.494
2.583
2.565
2.572
2.584
2.576
2.585
2.576
2.394
2.378
2.369
2.365
2.351
2.341
2.358
2.361
2.367
2.365
2.367
2.377
2.386
2.374
2.383
2.378
2.372
2.368
2.372
2.367
2.363
2.358
2.352
2.359
2.355
2.352
2.361
2.363
2.367
2.362
2.312
2.369
2.362
2.373
2.378
2.375

0.002
0.028
0.005
0.007
0.007
0.001
0.185
0.014
0.011
0.014
0.011
-0.003
0.005
0.000
0.007
0.055
0.001
0.002
0.000
0.000
0.002
0.002
0.000
0.000
0.000
0.001
0.074
0.000
0.001
0.002
0.001
0.003
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.006
0.000
0.000
0.000
0.000
0.000
0.007
0.000
0.003
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

8 = (6-6)
m

Total
Settlement
9 = (9+8)
m
0.000
-0.002
-0.030
-0.035
-0.042
-0.049
-0.050
-0.235
-0.249
-0.260
-0.274
-0.285
-0.282
-0.287
-0.287
-0.294
-0.349
-0.350
-0.352
-0.352
-0.352
-0.354
-0.356
-0.356
-0.356
-0.356
-0.357
-0.431
-0.431
-0.432
-0.434
-0.435
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.438
-0.444
-0.444
-0.444
-0.444
-0.444
-0.444
-0.451
-0.451
-0.454
-0.454
-0.454
-0.454
-0.454
-0.454
-0.454
-0.454
-0.454
-0.454
-0.454
-0.454
-0.454
-0.454

Remarks

Disturbed

10/15/2014
10/17/2014
10/22/2014
10/24/2014
11/5/2014
11/7/2014

Singnature of HSSI SDN BHD

7.961
7.954
7.966
7.964
7.966
7.978

8.130
8.130
8.130
8.130
8.130
8.130

2.542
2.542
2.542
2.542
2.542
2.542

2.542
2.542
2.542
2.542
2.542
2.542

5.588
5.588
5.588
5.588
5.588
5.588

Signature of FAJARBARU BUILDER SDN BHD

2.373
2.366
2.378
2.376
2.378
2.390

0.000
0.000
0.000
0.000
0.000
0.000

-0.454
-0.454
-0.454
-0.454
-0.454
-0.454

LRT - CONTRUCTION AND COMPLETION OF FACILITIES WORKS


(PACKAGE B) FOR THE AMPANG (AMG) LINE EXTENSION PROJECT

Location:
As-Built Chainage:
As-Built Coordinate :
Base Plate:
Date

11/28/2013
12/4/2013
12/12/2013
19/12/2013
12/28/2013
1/2/2014
1/9/2014
1/23/2014
1/27/2014
2/4/2014
2/8/2014
2/12/2014
2/15/2014
2/19/2014
2/22/2014
2/27/2014
3/5/2014
3/8/2014
3/13/2014
3/17/2014
3/20/2014
3/22/2014
3/27/2014
4/2/2014
4/9/2014
4/11/2014
4/16/2014
4/19/2014
4/23/2014
4/25/2014
4/30/2014
5/2/2014
5/7/2014
5/9/2014
14/2014
5/16/2014
5/21/2014
5/23/2014
5/28/2014
5/30/2014
6/4/2014
6/5/2014
6/11/2014
6/13/2014
6/18/2014
6/20/2014
6/25/2014
6/27/2014
7/2/2014
7/4/2014
7/9/2014
7/11/2014
7/16/2014
7/19/2014
8/4/2014
8/8/2014
8/13/2014
8/15/2014
8/20/2014
8/23/2014
8/27/2014
8/29/2014
9/4/2014
9/6/2014
9/10/2014
9/13/2014
10/2/2014
10/4/2014
DISTURBED

RL 6.315m
Days

SETTLEMENT GAUGE MONITORING RECORDS (DEPOT)


SP 13 (ROAD D )
CH 596.960 O/F R 23.561
N 79518.526 E 86164.530
Date Installed :

Filling
Level
1
m RL

Top of Rod
2
m RL

8.135
8.852
8.132
8.850
8.091
8.838
8.090
8.835
8.088
8.830
8.086
8.827
8.084
8.825
8.405
8.8
8.307
8.788
8.285
8.741
8.276
8.739
8.319
8.734
8.319
8.735
8.318
8.728
8.315
8.728
8.305
8.716
8.295
8.708
8.295
8.701
8.315
8.700
8.314
8.700
8.314
8.699
8.313
8.697
8.312
8.697
8.281
8.693
8.28
8.692
8.28
8.687
8.274
8.687
8.289
8.686
8.275
8.686
8.281
8.685
8.287
8.683
8.277
8.683
8.232
8.680
8.224
8.680
8.276
8.662
8.256
8.662
8.243
8.662
8.233
8.662
8.219
8.660
8.232
8.660
8.266
8.660
8.26
8.660
8.259
8.660
8.264
8.660
8.273
8.660
8.277
8.660
8.274
8.660
8.289
8.660
8.277
8.660
8.281
8.660
8.278
8.658
8.287
8.658
8.28
8.658
8.284
8.658
8.29
8.650
8.281
8.650
8.285
8.650
8.28
8.650
8.277
8.650
8.283
8.650
8.28
8.650
8.279
8.650
8.283
8.650
8.275
8.650
8.27
8.650
8.278
8.650
8.27
8.650
8.272
8.650
DISTURBED DISTURBED

11/28/2013

Top length
of Rod
3
m

Rod
Extend
4
m

Total
Length of Rod
5
m

Base Plate
Level
6 = (2-5)
m RL

Thickness of
Fill
7 = (1-6)
m

Settlement

2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
DISTURBED

DISTURBED

2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
2.537
DISTURBED

6.315
6.313
6.301
6.298
6.293
6.290
6.288
6.263
6.251
6.204
6.202
6.197
6.198
6.191
6.191
6.179
6.171
6.164
6.163
6.163
6.162
6.160
6.160
6.156
6.155
6.150
6.150
6.149
6.149
6.148
6.146
6.146
6.143
6.143
6.125
6.125
6.125
6.125
6.123
6.123
6.123
6.123
6.123
6.123
6.123
6.123
6.123
6.123
6.123
6.123
6.121
6.121
6.121
6.121
6.113
6.113
6.113
6.113
6.113
6.113
6.113
6.113
6.113
6.113
6.113
6.113
6.113
6.113
DISTURBED

1.820
1.819
1.790
1.792
1.795
1.796
1.796
2.142
2.056
2.081
2.074
2.122
2.121
2.127
2.124
2.126
2.124
2.131
2.152
2.151
2.152
2.153
2.152
2.125
2.125
2.130
2.124
2.140
2.126
2.133
2.141
2.131
2.089
2.081
2.151
2.131
2.118
2.108
2.096
2.109
2.143
2.137
2.136
2.141
2.150
2.154
2.151
2.166
2.154
2.158
2.157
2.166
2.159
2.163
2.177
2.168
2.172
2.167
2.164
2.170
2.167
2.166
2.170
2.162
2.157
2.165
2.157
2.159
DISTURBED

0.002
0.012
0.003
0.005
0.003
0.002
0.025
0.012
0.047
0.002
0.005
-0.001
0.007
0.000
0.012
0.008
0.007
0.001
0.000
0.001
0.002
0.000
0.004
0.001
0.005
0.000
0.001
0.000
0.001
0.002
0.000
0.003
0.000
0.018
0.000
0.000
0.000
0.002
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.002
0.000
0.000
0.000
0.008
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
DISTURBED

8 = (6-6)
m

Total
Settlement
9 = (9+8)
m
0.000
-0.002
-0.014
-0.017
-0.022
-0.025
-0.027
-0.052
-0.064
-0.111
-0.113
-0.118
-0.117
-0.124
-0.124
-0.136
-0.144
-0.151
-0.152
-0.152
-0.153
-0.155
-0.155
-0.159
-0.160
-0.165
-0.165
-0.166
-0.166
-0.167
-0.169
-0.169
-0.172
-0.172
-0.190
-0.190
-0.190
-0.190
-0.192
-0.192
-0.192
-0.192
-0.192
-0.192
-0.192
-0.192
-0.192
-0.192
-0.192
-0.192
-0.194
-0.194
-0.194
-0.194
-0.202
-0.202
-0.202
-0.202
-0.202
-0.202
-0.202
-0.202
-0.202
-0.202
-0.202
-0.202
-0.202
-0.202
DISTURBED

Remarks

Singnature of HSSI SDN BHD

Signature of FAJARBARU BUILDER SDN BHD

LRT - CONTRUCTION AND COMPLETION OF FACILITIES WORKS


(PACKAGE B) FOR THE AMPANG (AMG) LINE EXTENSION PROJECT

Location:
As-Built Chainage:
As-Built Coordinate :
Base Plate:
Date

1/21/2014
1/27/2014
2/4/2014
2/8/2014
2/12/2014
2/15/2014
2/19/2014
2/22/2014
2/27/2014
3/5/2014
3/8/2014
3/13/2014
3/17/2014
3/20/2014
3/22/2014
3/27/2014
4/2/2014
4/9/2014
4/11/2014
4/16/2014
4/19/2014
4/23/2014
4/25/2014
4/30/2014
5/2/2014
5/7/2014
5/9/2014
5/14/2014
5/16/2014
5/21/2014
5/23/2014
5/28/2014
5/30/2014
6/4/2014
6/5/2014
6/11/2014
6/13/2014
6/18/2014
6/20/2014
6/25/2014
6/27/2014
7/2/2014
7/4/2014
7/9/2014
7/11/2014
7/16/2014
7/19/2014
DISTURBED

SETTLEMENT GAUGE MONITORING RECORDS (DEPOT)


SP 17 (ROAD D )
CH
Date Installed :

RL 6.315m
Days

Filling
Level
1
m RL

Top of Rod
2
m RL

8.76
9.173
8.725
9.169
8.733
9.164
8.761
9.164
8.753
9.164
8.758
9.164
8.769
9.164
8.759
9.164
8.78
8.811
8.734
9.117
8.783
9.117
8.794
8.609
8.798
8.609
8.796
8.609
8.794
8.605
8.791
8.602
8.780
8.599
8.779
8.596
8.779
8.596
8.78
8.596
8.811
8.596
8.816
8.596
8.821
8.596
8.819
8.593
8.823
8.593
8.82
8.591
8.814
8.591
8.657
8.509
8.657
8.509
8.639
8.507
8.625
8.505
8.615
8.500
8.623
8.500
8.623
8.500
8.633
8.500
8.611
8.500
8.6
8.500
8.63
8.500
8.635
8.500
8.631
8.500
8.642
8.500
8.64
8.495
8.642
8.495
8.633
8.490
8.64
8.490
8.632
8.490
8.642
8.490
DISTURBED DISTURBED

Singnature of HSSI SDN BHD

1/21/2014

Top length
of Rod
3
m

Rod
Extend
4
m

Total
Length of Rod
5
m

Base Plate
Level
6 = (2-5)
m RL

Thickness of
Fill
7 = (1-6)
m

Settlement

2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
DISTURBED

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
DISTURBED

2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
2.858
DISTURBED

6.315
6.311
6.306
6.306
6.306
6.306
6.306
6.306
5.953
6.259
6.259
5.751
5.751
5.751
5.747
5.744
5.741
5.738
5.738
5.738
5.738
5.738
5.738
5.735
5.735
5.733
5.733
5.651
5.651
5.649
5.647
5.642
5.642
5.642
5.642
5.642
5.642
5.642
5.642
5.642
5.642
5.637
5.637
5.632
5.632
5.632
5.632
DISTURBED

2.445
2.414
2.427
2.455
2.447
2.452
2.463
2.453
2.827
2.475
2.524
3.043
3.047
3.045
3.047
3.047
3.039
3.041
3.041
3.042
3.073
3.078
3.083
3.084
3.088
3.087
3.081
3.006
3.006
2.990
2.978
2.973
2.981
2.981
2.991
2.969
2.958
2.988
2.993
2.989
3.000
3.003
3.005
3.001
3.008
3.000
3.010
DISTURBED

0.000
0.004
0.005
0.000
0.000
0.000
0.000
0.000
0.353
-0.306
0.000
0.000
0.000
0.000
0.004
0.003
0.003
0.003
0.000
0.000
0.000
0.000
0.000
0.003
0.000
0.002
0.000
0.082
0.000
0.002
0.002
0.005
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.005
0.000
0.005
0.000
0.000
0.000
DISTURBED

Signature of FAJARBARU BUILDER SDN BHD

8 = (6-6)
m

Total
Settlement
9 = (9+8)
m
0.000
-0.004
-0.009
-0.009
-0.009
-0.009
-0.009
-0.009
-0.362
-0.056
-0.056
-0.056
-0.056
-0.056
-0.060
-0.063
-0.066
-0.069
-0.069
-0.069
-0.069
-0.069
-0.069
-0.072
-0.072
-0.074
-0.074
-0.156
-0.156
-0.158
-0.160
-0.165
-0.165
-0.165
-0.165
-0.165
-0.165
-0.165
-0.165
-0.165
-0.165
-0.170
-0.170
-0.175
-0.175
-0.175
-0.175
DISTURBED

Remarks

DISTURBED

DISTURBED
DISTURBED
REPAIRED

LRT - CONTRUCTION AND COMPLETION OF FACILITIES WORKS


(PACKAGE B) FOR THE AMPANG (AMG) LINE EXTENSION PROJECT

Location:
As-Built Chainage:
As-Built Coordinate :
Base Plate:
Date

7/25/2014
8/4/2014
8/8/2014
8/13/2014
8/15/2014
8/20/2014
8/23/2014
8/27/2014
8/28/2014
9/4/2014
9/6/2014
9/10/2014
9/13/2014
10/2/2014
10/4/2014
10/8/2014
10/10/2014
10/15/2014
10/17/2014
10/22/2014
10/24/2014
11/5/2014
11/7/2014

RL 7.077m
Days

SETTLEMENT GAUGE MONITORING RECORDS (DEPOT)


SP 18 (ROAD D )
CH
Date Installed :

Filling
Level
1
m RL
8.442
8.467
8.460
8.464
8.461
8.459
8.466
8.460
8.459
8.459
8.459
8.465
8.455
8.450
8.444
8.450
8.449
8.458
8.441
8.462
8.447
8.454
8.446

Top of Rod
2
m RL

Top length
of Rod
3
m

Rod
Extend
4
m

Total
Length of Rod
5
m

9.144
9.058
9.058
9.058
9.058
9.05
9.05
9.05
9.05
9.05
9.05
9.046
9.046
9.046
9.046
9.04
9.04
9.04
9.04
9.04
9.04
9.04
9.04

2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067
2.067

Singnature of HSSI SDN BHD

Signature of FAJARBARU BUILDER SDN BHD

7/25/2014

Base Plate
Level
6 = (2-5)
m RL
7.077
6.991
6.991
6.991
6.991
6.983
6.983
6.983
6.983
6.983
6.983
6.979
6.979
6.979
6.979
6.973
6.973
6.973
6.973
6.973
6.973
6.973
6.973

Thickness of Settlement
Total
Fill
Settlement
7 = (1-6)
8 = (6-6) 9 = (9+8)
m
m
m
1.365
1.476
1.469
1.473
1.470
1.476
1.483
1.477
1.476
1.476
1.476
1.486
1.476
1.471
1.465
1.477
1.476
1.485
1.468
1.489
1.474
1.481
1.473

0.000
-0.086
0.000
0.000
0.000
-0.008
0.000
0.000
0.000
0.000
0.000
-0.004
0.000
0.000
0.000
-0.006
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
-0.086
-0.086
-0.086
-0.086
-0.094
-0.094
-0.094
-0.094
-0.094
-0.094
-0.098
-0.098
-0.098
-0.098
-0.104
-0.104
-0.104
-0.104
-0.104
-0.104
-0.104
-0.104

f FAJARBARU BUILDER SDN BHD

LRT - CONTRUCTION AND COMPLETION OF FACILITIES WORKS


(PACKAGE B) FOR THE AMPANG (AMG) LINE EXTENSION PROJECT

Location:
As-Built Chainage:
As-Built Coordinate :
Base Plate:
Date

7/25/2014
8/4/2014
8/8/2014
8/13/2014
8/15/2014
8/20/2014
8/23/2014
8/27/2014
8/29/2014
9/4/2014
9/6/2014
9/10/2014
9/13/2014
10/2/2014
10/4/2014
10/8/2014
10/10/2014
10/15/2014
10/17/2014
10/22/2014
10/24/2014
11/5/2014
11/7/2014

RL 7.019m
Days

SETTLEMENT GAUGE MONITORING RECORDS (DEPOT)


SP 19 (ROAD D )
CH
Date Installed :

Filling
Level
1
m RL
8.387
8.368
8.377
8.370
8.372
8.377
8.366
8.370
8.368
8.373
8.365
8.360
8.353
8.347
8.355
8.355
8.352
8.351
8.355
8.344
8.358
8.350
8.351

Top of Rod
2
m RL

Top length
of Rod
3
m

Rod
Extend
4
m

Total
Length of Rod
5
m

9.019
9.011
9.01
9.01
9.01
9.002
9.002
9.000
9.000
9.000
9.000
8.994
8.994
8.994
8.994
8.994
8.994
8.994
8.994
8.994
8.994
8.953
8.953

2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000

Singnature of HSSI SDN BHD

Signature of FAJARBARU BUILDER SDN BHD

7/25/2014

Base Plate
Level
6 = (2-5)
m RL

Thickness of
Fill
7 = (1-6)
m

Settlement

7.019
7.011
7.010
7.010
7.010
7.002
7.002
7.000
7.000
7.000
7.000
6.994
6.994
6.994
6.994
6.994
6.994
6.994
6.994
6.994
6.994
6.953
6.953

1.368
1.357
1.367
1.360
1.362
1.375
1.364
1.370
1.368
1.373
1.365
1.366
1.359
1.353
1.361
1.361
1.358
1.357
1.361
1.350
1.364
1.397
1.398

0.000
-0.008
-0.001
0.000
0.000
-0.008
0.000
-0.002
0.000
0.000
0.000
-0.006
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-0.041
0.000

8 = (6-6)
m

Total
Settlement
9 = (9+8)
m
0.000
-0.008
-0.009
-0.009
-0.009
-0.017
-0.017
-0.019
-0.019
-0.019
-0.019
-0.025
-0.025
-0.025
-0.025
-0.025
-0.025
-0.025
-0.025
-0.025
-0.025
-0.066
-0.066

of FAJARBARU BUILDER SDN BHD

LRT - CONTRUCTION AND COMPLETION OF FACILITIES WORKS


(PACKAGE B) FOR THE AMPANG (AMG) LINE EXTENSION PROJECT

Location:
As-Built Chainage:
As-Built Coordinate :
Base Plate:
Date

7/25/2014
8/4/2014
8/8/2014
8/13/2014
8/15/2014
8/20/2014
8/23/2014
8/27/2014
8/29/2014
9/4/2014
9/6/2014
9/10/2014
9/13/2014
10/2/2014
10/4/2014
10/8/2014
10/10/2014
10/15/2014
10/17/2014
10/22/2014
10/24/2014
11/5/2014
11/7/2014

RL 7.362m
Days

SETTLEMENT GAUGE MONITORING RECORDS (DEPOT)


SP 20 (ROAD D )
CH
Date Installed :

Filling
Level
1
m RL
8.591
8.565
8.57
8.574
8.569
8.56
8.57
8.574
8.569
8.575
8.57
8.577
8.572
8.574
8.568
8.561
8.559
8.56
8.55
8.562
8.553
8.553
8.553

Top of Rod
2
m RL

Top length
of Rod
3
m

Rod
Extend
4
m

Total
Length of Rod
5
m

9.643
9.628
9.628
9.628
9.628
9.628
9.628
9.62
9.62
9.62
9.62
9.615
9.615
9.615
9.615
9.615
9.615
9.615
9.615
9.615
9.615
9.594
9.594

2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281
2.281

Singnature of HSSI SDN BHD

Signature of FAJARBARU BUILDER SDN BHD

7/25/2014

Base Plate
Level
6 = (2-5)
m RL

Thickness of
Fill
7 = (1-6)
m

Settlement

7.362
7.347
7.347
7.347
7.347
7.347
7.347
7.339
7.339
7.339
7.339
7.334
7.334
7.334
7.334
7.334
7.334
7.334
7.334
7.334
7.334
7.313
7.313

1.229
1.218
1.223
1.227
1.222
1.213
1.223
1.235
1.230
1.236
1.231
1.243
1.238
1.240
1.234
1.227
1.225
1.226
1.216
1.228
1.219
1.240
1.240

0.000
-0.015
0.000
0.000
0.000
0.000
0.000
-0.008
0.000
0.000
0.000
-0.005
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-0.021
0.000

8 = (6-6)
m

Total
Settlement
9 = (9+8)
m
0.000
-0.015
-0.015
-0.015
-0.015
-0.015
-0.015
-0.023
-0.023
-0.023
-0.023
-0.028
-0.028
-0.028
-0.028
-0.028
-0.028
-0.028
-0.028
-0.028
-0.028
-0.049
-0.049

ARU BUILDER SDN BHD

Das könnte Ihnen auch gefallen