Foundation Schedule

F1: 1100 X 1100 X 350, 8 - 16 both ways (Bottom Bars)


F2: 1100 X 1100 X 350, 8 - 16 both ways (Top & Bottom Bars)
Column Schedule
C1: 200 X 400: 6 16 vertical bars; 10-mm ties: 1 @ 50, 4 @ 100, rest @ 200 o.c. to midheight
C2: 200 X 400: 8 16 vertical bars; 10-mm ties: 1 @ 50, 4 @ 100, rest @ 200 o.c. to midheight
Beam Schedule
B1: 200 X 300, 3 16 @ supports (Top & Bottom), 2 16 @ midspan (Top & Bottom); 1 @ 50, 4 @ 100, rest @ 150 o.c. to midspan
TB1: 250 X 400, 3 16 @ supports (Top & Bottom), 2 16 @ midspan (Top & Bottom); 1 @ 50, 4 @ 100, rest @ 200 o.c. to midspan
Floor Slab
100-mm slab; 10-mm bottom bars @ 150 mm o.c. both ways
C-Purlins on Roof
Cold-formed 100 x 50 x 12 x 2 @ 750 mm o.c. (sagrod is optional)
Box-Type Tubular Purlins on Garage roof
Cold-formed 100 x 50 x 5 @ 500 mm o.c.
Wall footings
WF1a & WF1b: Long Direction: 3 16; Short Direction: 10 @ 200 o.c.
WF2: 3 12 Bottom Bars; 12 @ 300 extra bottom bars

CHB

CHB

CHB

400

400

400

400

600

WF1a

WF1b

Extra bottom bars

400

400
WF2

FFL

900
Tie Beam (if any)
350
Exterior footing

Interior footing

Foundation Detail

400

C1

B1

C1

B1

C1

100 x 50 x 12 x 2 @ 750 mm o.c

B1

B1

C1

100 x 50 x 5 @ 500 mm o.c.

C2

B1

B1

B1

B1

B1

C1

C1

B1

B1

B1

C2

B1

C2

B1

B1

C2

C2
B1

Roof Plan

C2

C1 / F1

C2 / F2

C1 / F1

C1 / F1

C1 / F1

C1 / F1

C1 / F1

C2 / F1

C2 / F1

C2 / F1

TB1

C2 / F2

C2 / F1

TB1

Foundation Plan