JAMBI MERANG DEVELOPMENT PROJECT

EPC SALES GAS PIPELINE TO GRISSIK


No P&ID. :
Service :
Case :

SP-00-PID-002
Pressure Safety Valve
Fire Case - Unwetted Area (1A)

Item :
Unit :

SP-58-PSV-154
Pig Launcher

No. of item :

VESSEL GEOMETRY
Vessel OD
Length
Type of heads
Exposed area of shell
Exposed area of heads
Exposed area A'
Total

(With margin 10%)

m
m
m2
m2
m2
sq. ft
sq. ft

Minor Barrel Oversize barrel


0.406
0.508
1.18
5.12
Flat
Flat
1.51
8.17
0.00
0.00
1.51
8.17
16.27
87.99
113.06

PSV REQUIRED AREA CALCULATION


Pn Operating Pressure

psig

1119

Pn Operating Pressure

barg

77.15

Pn Operating Pressure
Set Pressure
Set Pressure
P1 Relieving Pressure

bara
psig
barg
bara

78.17
1200
82.74
101.13

P1 Relieving Pressure
MW
k (1)
C
Kd
Tw (vessel wall temp.)
Tn Operating
T1 (upstream gas temp.)
F'
Relief Load

psia

1467
18.75
1.365
353
0.975
1 560
569.7
737
0.0245
5 833
2 646
0.072
47

PSV Required Area


PSV Required Area

PSV selected area


Inlet flange rating
Outlet flange rating
PSV orifice
Rated Flow

NOTES
1 - At relieving condition

R
R
R
sq. psia
lb/h
kg/h
sq. inch
mm

sq. inch
lbs
lbs

0.110
600
150
1" x D x 2"

kg/h
lb/h

4 017
8 856

0.0245