Beruflich Dokumente
Kultur Dokumente
(BEE 31602)
ASSIGNMENT 1
NAME
MATRIC NO.
CE130027
CE130001
CE130050
CE130055
CE130083
: 2
DUE DATE :
One group = 4-5 members Report submission = typing using word document (any font) / neat
& clear handwriting
You need to have AT LEAST 1 reference from UTHM library
QUESTION
The Walters Manufacturing Company need to know the best how best to use the time available
within its three manufacturing departments in the construction and packaging of the three types of
the metal storage sheds. Each ones must be stamped, painted and packaged. Table 1 shows the
numbers of hours required for the processing of each types of shed. Using the information table,
determines how many of each type of shed can produced if the stamping department has 3200
hours available, the painting department has 1700 hours, and the packaging department has 1300
hours.
Departments
stamping
Painting
Packaging
Shed
Type 2
Type 1
2
1
1
3
2
1
Type 3
4
1
2
Table 1
Answers:
Let,
X1 = Type 1
X2 = Type 2
X3 = Type 3
---------------------------------------------- Equation 2
c) Packaging Department
X1 + X2 + 2X3 = 1300
---------------------------------------------- Equation 3
3200
1700
1300
X1
X2
X3
1300
1700
3200
(-1)R1 + R2 New R2
(-2)R1 + R3 - New R3
1300
-1
400
600
(-1)R2 + R1 New R1
(-2)R2 + R3- New R3
900
-1
400
200
(-3)R3 + R1 New R1
R3 + R2- New R2
300
600
200
X1 = 300
X2 = 600
X3 = 200
The company should make 300 shed type 1, 600 type 2, and 200 type 3 sheds.
REFERENCES
1. Applies Finite Mathematics, Fifth Edition, Howard Anton, Bernard Kolman, Bonnie
Averbach
2. Mathematical Applications for the Management, Life and Social Science, Seventh
Edition, Ronald J.Harshbarger, James J.Reynolds
3. http://www.mathwords.com/g/gauss-jordan_elimination.htm
4. https://www.youtube.com/watch?v=CsTOUbeMPUo