Section
Quantity
[mm]
[nos]
Weight
Working Drawing
Assembly Details
kg / pc total kg
6 holes 14
Angle
40/40/5
1330
Flat
100/6
-106
2125
185
665
19
3.91
925
175
3 holes 14
0.46
100
1d
0.92B
435
Walkway cable
30 23
23 30
Section A
1330
1 hole 19
7.82B
Flat
100/6
-85
1a
0.38
2
23
54
23
0.76B
2 holes 15
Flat
100/6
-85
Hex Nut
M 12
IS 1363
Plain Rod
8 -1430
2
23
54
to be welded
to part 1a
before welding
2
3
4
5
Hex Nut
M 12
IS 1363
Plain
Washer
13
Hex Bolt
M 12x70
0.38
0.76B
0.015
0.18C
1d
180
Ri=25
0.56
1.12B
nuts to be welded
centered to holes
50
Ri
Ri=21
120
0.19
14.7
225
0.015
0.04C
0.005
0.08C
1c
1d
1e
threads to be cleaned after
0.08
12.6
1.01C
of holes
B = 11.78 kg
C = 1.31 kg
Transportation Weight
B + C + 0.35 kg
For Delivery:
- The suspenders shall be folded together with the
crossbeam and to be bound with a binding wire
- Fit one hex nut and one washer to each J - hook.
All steelparts must be hot dip galvanized according to IS 2629 & 2633, min thickness = 80 m
35
145
obtain alignment
min. 40*
*Required Nos of
Crossbeams
per bridge:
= Span in [m]
Span:
Steel Drawing:
Nepal
225
A = 13.44 kg
Produced by
105
65
0.40B
70
Section B
thread M12
2.1
IS 1363
before welding
welding
this side
1a
55
1f
1b
1150
2.1
14
2 holes 17
23
12
70
Rod
(J - Hook)
12 - 209
21
14
insert to part 1b
rod to be inserted
19