Sie sind auf Seite 1von 1

Section A-A

min. 2.10 m

min. 2.50 m

40

Front Elevation

60
70

HRC Elevation

Details of CSM Tower

.................

Bulldog Grips

15

70

20

25

16

See Drawing No.


20D con 70

10

40

or 20D con 106

WC Elevation.
.................

12

13

Form work for


Tower
Drum is done
Foundation
with a bamboo
mat (Chitra) lined
150
150
with a plastic
300
sheet.Use binding
wire around the
Typical Cross Section of RCC Drum drum for fixing.

3 Stirrups 10
each

10

Erection Hook

11

Anchor Rods 25

Inner Drum
equal to Single
Drum

65

each cable end to be


wound once around
the drum and clamped
with second cable

Outer Drum

100

Tower
Foundation

Hard
Rock

3 Stirrups 10

RCC diameter

20

14 Bulldog Grips

of Drum

Erection
Hook
Handrail Cable
2Walkway Cables

Plan
View

Single

Double
Drum

20

Hard
Rock

Drum

2 Walkway Cables
Handrail Cable

Anchor Rods
Ribbed Tor steel 25mm
drill holes as shown in table
volume per hole = 0.002m3

Nos & spacing


of Bulldog Grips
Spacing
Cable
Nos
[cm]
mm

65

Dimension of Drums and Quantity of Anchor Rods :

100

required diameters of:

Cable
[mm]

arrangement
of anchor
rods

outer drum for inner drum for


Total Required
handrail cable walkway cable Volume Anchor
RCC
for
Rods
of
RCC
for
Drum rod holes Drum rod holes Drum 25 mm
[cm]
[cm]
[nos]
[m3]
[cm]
[cm]

Stirrups 10 mm
cutting bending weight
nos length
dia
kg/pc
[mm]
[mm]
[kg]
for inner drum

Hand Rail 26
160

Walkway 26

145

100

85

1.10

16+8

3370

5250

2.08

for outer drum

or

1480

3.24

for inner drum

Hand Rail 26
180

Walkway 32

165

125

If Hand Rail is 32,then 4 more anchor rods are required in double drum

Produced by

880

Nepal

110

1.30

20+12

1130

for outer drum

24+12

4150

2.56

5880

1680

3.63

13

10

26
32

5
6

15
20

Standard

Anchore Rods to be grouted


in cement mortar 1:1
diameter

Related Steel
Drawing is :
60D4

of rod holes

Quantities

Cement
Type of construction [m3]
[bags]
Chisel dressed
Stone Masonry 1:4

See drawing no.


20Dcon 70 or
20Dcon106

Hammer dressed
Stone Masonry 1:6

10.27

Hammer dressed
Dry Masonry

2.02

15.41

Scale 1 : 50
All Dimensions are in Centimeter

HMG / Ministry of Local Development


DoLIDAR / Short SpanTrail Bridge Standard
Bridge Name
No

Bank :

Span

Construction Drawing:

Concrete 1:2:4
*(Volume of Drums x6.40)

Concrete 1:3:6

0.93

Broken stones

16.49

4.10

RCC Double & Single Drum Anchor


in Hard Rock
Type 2HRD
Handrail Cables 26 or 32 mm
...........
4 Walkway Cables 26 or 32 mm
Date : Nov. 05, 2001

...........

Drawing No. 64D con

Swiss Association for International Cooperation, in partnership with His Majestys Government of Nepal, funded and supported by the Swiss Government (SDC Nepal).

47

Das könnte Ihnen auch gefallen