Beruflich Dokumente
Kultur Dokumente
600 beds
Date :
Index Level :
M&E Index Level:
290 MIPS(FP)
290
ELEMENT
COST OF RATE
ELEMENT
/m2
8705
54.41
130
66.96
0.81
2A Frame
2B Upper Floors
2C Roof
2D Stairs
2E External Walls
2F Windows & Externl.Doors
2G Internal Walls & Partns.
2H Internal Doors
3440
6841
13434
21.5
42.76
83.96
160
86
130
21.5
79.55
103.34
1
0.54
0.81
10934
9174
1828
1538
68.34
57.34
11.43
9.61
109
16
70
3
100.31
573.36
26.11
512.55
0.68
0.1
0.44
0.02
SUPERSTRUCTURE
47189
294.94
3A Wall Finishes
3B Floor Finishes
3C Ceiling Finishes
766
4089
408
4.79
25.56
2.55
141
158
158
5.43
25.88
2.58
0.88
0.99
0.99
INTERNAL FINISHES
5263
32.9
721.7778
4.51
3276.603
0
353
177
20.48
0
2.21
1.11
0
0
0
0
3807
23.8
0
0
0
0
SUBSTRUCTURE
5A Sanitary Appliances
5C Disposal Installations
5N B.W.I.C.
5O Profit & Attendances
BUILDING SERVICES
5B Services Equipment
5D Water Installations
0
3280.346
0
2828.615
0
0
0
960.3462
0
0
20.5
0
17.68
0
0
0
6
0
M. & E. SERVICES
7069.308
44.18
72755
454.74
9094
1455
56.84
9.09
83304
520.65
75210
8094.357
470.06
50.59
TOTAL COST
Building
Engineering
30-Sep-02
160 m2
ELEMENTAL
PERCENTAGE
%
11.96
4.73
9.4
18.46
15.03
12.61
2.51
2.11
64.85
1.05
5.62
0.56
7.23
0.99
4.5
0
0.49
0.24
5.23
0
0
0
4.51
0
3.89
0
0
0
1.32
0
9.72
100
12.5
2
90.28
9.72