Sie sind auf Seite 1von 32
SINDH BUILDING CONTROL AUTHORITY DiAdmn-P-HAOU/LS> Dated. dlerabsad (Buildings) ww I Director (Town Planning) Hyderabad. Nw bias, Larkina & Subkur Ne & ilding Control Authority R OLICY FOR REGULARIZATION UNDER AMNESTY SCHEME 2011 gon with the directives that constructions. if conting on the following may noy ed for r See i) The cunstructions beyond podiun level Mazar-e- ". [ . Quuideeel: ra ii) Beyond the boundary line of the property iii) Coustruction in cut-line areaor an arcade | iv) Construction uf amenities like parking floors. play | 4 a area, driver's sitting arew, funeral parlour area, | 25 a area & KESC Sub-Station ur area of public | amenities \ if v) Loft converted to mezzanine ’ a > e noe br. Please make a note that Director General, SBCA has directed, 9. ase make an Ree (ENGR. SMARZADICL WAST, DIRECTOR ADMINISTRATION) SBCA, a. ti yy to Director General. SBCA, SINDITIUILDING CONTROL AUTHORITY eetrssbcianat| hy / ADMINISTRATIVE INSTRUCTIONS. ¢ Uh following instructions are being issued to facilitate the general publie be auhered by all Directors of the SBCA belare issuiny lina! approvals Hore cout tarmalites, ivion Permission: ie existing building bye-taws, the building consticied ean only be Bid proved the completion ceriicate is oblainedIlowever, it ole ved Bh owners occupy the building without obianing eémypllion ceriene to the aecipaney changes: Natious owners subsequettly. apply. for Ur Hon perinission, whi i mally sue by dhe eaesmed om chiring fe Demoliion Permission and. they do nol veily whether the corpletcn Beate ws carlir obiained, therefore, the following insiuctions will be ed belore fsue ofthe Demolition Pennision Demolition Permission will be issued as usual of such building for-which the completion certifente has been oblaincd. Charges uf the Demolition Vermiission will be recovered, If the Oceiipaney Centifieate has not been obtained of the building for which Demolition Permission has:been applied then the owner would be eaited to submit the Completion Plan of the existing structute/building Ser mayen of Seratiny Fee: Oceupaney Charges as well as charges off Til Lally the anpravel plan will be recovered alongwith fee of Demolition: Permission’ art it will be psither neated Campletion Cerltfeate pranted nor to be issued by the conccmed. The Demolition Peimission be issued on observing these aspects tion? Bhe exiting building tyes. the Aubry is ying apyioval of 2 foots up th eatsuory of he plots af 390 aad Reaches ne Er decide to allow appl in piecemeal cael aie lgorcs of te pla, The ovners are ruin o coe a hl Da, subreuty completion /epoltati ea e ot of the 2" ior wen the pound & 1" floor is campleeal heat ro shies ening the ens, le vevaering oe Pr UR ae Deputy Directors are advised to observe thal when tle bailing opto 1" Hoor is sirvtorally completed without violations thn the 2" Moor @ be considered lor approval, In case the regularization of U ¢ ground & I" & been obtained then 2™ floor as a Proposed may alse’ be considered for Pe ubove instructions are bei issted to fuclitate the jgenvral pantie, tullsered in letter and spicit by all the Directors uf the SHCA. None iret ‘Nee eae SINDH BUILDING CONTROL AUTHORITY }CA/DD(Adinn-P-1)/201 uffoss Dated: a irectors (Technical) Building Control Authority ECT: “ADMINISTRATIV OF2° FLOOR The powers as vested to the Director / Deputy Ditector to approve | loor irrespective of the area of the plot are ceased, with immediate effect and no oF till the completion of the Ground & 1" floor. TI construction in units, However, the 2"! is to curb the tendency of floar will be allowed only with thy: ‘al of Director General SBCA after the completion of the Ground & I floor iy by the owner. All the Directors & Deputy Director of the SBCA are advised to note “olations of the instructions will be seriously viewed aulministiatively to take activn, Ne ety Bees (ARCH, MANZOOR QADIR) f — DIRECTOR GENERAE. SBCA, # wiley NDD(Adma-P NOMI R SR "pated ORDER POLICY FOR REGULARIZATION UNDE Was applicable in the areas falling within the juris f Authority, ‘The Government of Sindh has extended “Nuttely uadsr Sindh Bulking Conte Online wn fencled {9 the entire Sindh, the Gave by Selene 1 cons det the ezukirization af ths uded in the SBCA and it will be now upplivable ay under = 1. Under. the Amnesty said date will be considered. Any disere ort example for all Directors of the ‘Towns are advised to ensuite that complied by cach officer and they may be infirmed accordin ~) SINDU BUILDING CONTROL AUTHORITY DER AMNESTY SCUEME 2001 The, policy for vegularization under Amnest’, Scheme’ wits inex in Me consider regularization of those constructions, whic have been ‘ston of Nasu Builngd he jurisdiction oF Buildiig - 2 of KBCA in the entire Sindh and has also notified KACA as Sindh Building Scheme 2011 revived, existing before the issue of Notification daved 25.11.2011 will be considered for regularization and no construction raised alter the fhe constructions ey observed in the file, the eoncerned officers will bé severely dealt with, Bi 2, ‘The ‘technical sialf of cach ‘wasn responsible to detect the ~ unauthorized consituction and also to take.iitidn is also directed to note that rio tunauthorized constructioris / floors / units are allowed ised, failing which the action under the Removal From Service (Special Powers) Sindh Ordinance. 2000 shall be initiated to'sét an (ARC, MANZOOR QADIR) PARECTOR GH The policy for regularization under Amnesty Scheme was indeed in sider regularization oF those consiruetions, which have: been raised! Petre applicable in the arcas falling. within the jurisdiction of Karachi titel, thority. see my MheyGovermivent of Sindty has “estenled the jurisdiction af Huila KBCA in the entire Sindh and has also notified KIACA as Sindh Building thority under Sindh Building Conteo! Oulinan 1970, The furnlictan ne © le (0 the entire Sindh, the Government hs fiuitier beet pleased tes ive the Blicié 6 consider Hie reyutiryzstigts wl thea ssnesiis five ayatattin fealty the in the SBCA and it will be now applicable as unules- se , Tey aoa dealt with, = ng which the aetion under the Reitovil Fran Service Special Powers) Sindh Ordinance. 200% sl be initiate wosetan, fob example for all Diréctors of the Towns are advised (o ensure tit alvive iasietetions are plied by cach officer and they:may be informed aecordingly © BAe? sof SBCA SIND BUILDING CONTROL AUTHORITY ADI AdMn-P-YZO LSA Dated rectors Quarter (SBCA] smal Director Hyderabad (Buildings) al Dircetor (Town Planning) Hyderabad, elas, Larkana & Sukkur Building Control Authority POLICY FOR REGULARIZATION UNDER AMNESTY SCHEME 2011 Director General, SBCA has been pisased tw give a guideline for ation with the directives that constructions. if coming on she following may ny red for reyularizattion:= i) The constructions beyoud podium te Quaid-e-rtzam ii) Beyond the bounilaty line of the property iii) Construction int cut-line atea or on arcade. | Masar-e- ix) Construction of amenities’ like parking floors. play | eee area, driver's sitting area, funeral parlayr area, | Wa ANY entertainment area, constriction on meter room a area & KESC Sub-Station or area of public \ anenities 5 zl A hae vy) Loft converted to mezzanine or he ae s bb. Please make a nate that Director General SBCA has directed. ey i" My ‘ = ee aa pe) et! (ENGR. SERIAL ASTD) DIR] CTORIADMINISTRA TION) Rca Wie Fy 10 Direetor General. SUCA, GPP: Yahi. FICE, Fa Uigah Ze - EESINDH BUILDING CONTROL AUTHORITY * +H Directorate of Legal Affairs, HO Civie Centra Karachi D IECA/Directoritnch(L.AVHOIZ011/ [01D The Directorate of Legal Affairs. SBCA has received a titer vide BBC ADirecior (BQT)/2011/162.dated 510.2011 fram the Director of Building (Bin Town) | SBCA for fii of Prosecution Cases against the offender/oulder/owner Plot No.Survey No.47 Den Khanto, Sector 181A Contidor Shah Latif Town, Bin Town, Karachi, in respect of fling of criminal prosecution against the owner, a st-dated cheque submited by the owner or builder to the SBCA which have been 9 of dishonoured by the bank, | have carefully perused the contents of the said letter, itis regretied'to say here his is a crystal clear case of breach of trust chealing and dishonesty with the public “ty (SBCA) and this is en alarming position iis submitted that in my humble opinion this 1s the’ case of violations of the Ing Sections ie. Section-405, Seclion-é18, Section-419, Section-#20 and Section of the Pakistan Penal Code, the relevant portions of the said sections of the PPC. under for your kind perusal:- . 405. Grimiral breach of trust. Whoever. being in any manner entrusted th property or wth any dominion over property, eishonastymisepproprates oF converts to his own use that property, or dshonestiy uses 07 disposes of tha! Droperty. in violation of any dvecton of faw presenbing the miedé in sthich such 's to be disenarged, or of any legal contract. express or nolied, witch Re has mage touching the discharge of rus, or willy sufers any ather person So 49 09, commis “crninal breech of st. 419. Punishment for cheating by personation Whoever cheats by Bersonation shal be punished with imgnsonment of eiher description fora term ‘which may extond 0 [seven] years, orth tine, oF with both 420. Cheating and dishonestly inducing dellvery of property. Whoever cheats an thereby dishonestly induces tha person decewed ts delwer any property to any person, or to make, aler or destroy The whele oF ery par! of valuable securly.or anything whichis signed or sealed, and which is Capable of Ding converted into a valuable securty, shall be punshas with mprsonment of either description fora term which may exlond to eovan yeers, end shall also be fable to fine 489, Dishonestly issuing @ cheque. Whoever dishonesty issues a cheque ‘wards re-payment af a loan or fulliment ofan obligaton which is eishonouted fn presentation, shall be punishable with imprsonment which may extend to ee years, or wth fine, or with both, unless fe can establish, for whch the burden of roof shal rest on him, that he had made arrangements with his bank {o ensure thal he cheque would be honoured and thal the Denk was ai foul in not hanouring ine eheque !n view of the above-mentioned circumstances, my respiéciful submission is that «rity (SBCA), is requited'totodge FIR against the said offe/ider under the above- ned Sections of the Pakistan Penal Code, on emergent basis, further comply all structions, as referred by me in Circular No.SBCA/ Director! inc{LA)’ HQ/201 1/098 22.11.2011, on emergent basis accordingly. A Copy of the said Circular dated 201 is attached herewith, This may kindly be treated as a standing: guideline, net similar type cases of the Authonty (Fay) Submites for appropriate action accordingly WL oe al {Shahid Jamitudatn anmed Khan) a Director! incharge (LA), SBCA dated ont | [1 CIRCULAR ae ‘a if ae ON Dey 2S SINDII BUILDING CONTROL AUTHORITY, (D1 Admn-P-N2OUU UB, Dated: OF. V2 Del CIRCULAR \ i TAND| oly. Please find enclose herewith a Circular dated 30.11.2011 already issued by rector (Legal Affairs), SBCA alongwith another Circular dated: 22.11.2011 NG ing Guidelines) in all other cases of the Authority for information and compliance. (SYED MUHAMMAD ALI NAQVD DEPUTY DIRECTOR(ADMN-P-1) SBCA. Asabove All Directors of Head Quarter, SBCA. | Director (Legal Atlairs), SBCA. a All Regional Directors of SBCA. P'S, to Director General, SBCA. legorieally restrain 44° all_thoso_authoriias/agenc aaranities i clesiiisly and gas, nét to provide any nneetinn fe any naling valent HOG freny us Gonr ars of SBCA. We would also once again restrain the ssurancés from registering any laser ly wilh a caution that non-compliance of the order would Ino errand olficeridafaultes to the contempt of Court proceedings, ‘nx! send the-same to SBCA may obtain copy af thi nel also aninnily_agenei for compliance. Adjourned. ; By teil oe poy i JuDs a ORDER SHEET IN THE HIGH COURT OF SINDH, KARACHI CP. No, D-2082 of 2008 Ome coe wily sigaatie of Juco 1. FOR KATCHA PESHI 2... £OR HEARING OF MISC. NO.1296 ‘ Me, ayal-ur-Rehman, advocate for the Petitioner. + Mr, Muhammad Anwar Tariq, advocate alongwith Mr. Sajid Latif, for Respondent No.3, (ir. Shahid Jamiluddin aloxgwith Me, Khursheed Jawaid, | adhocale Tor SBCA | | Ir khurshoed Java, advocate brits a ca galked “atest eoport elainung ecslain dematiions and pointing ou vaious imogulaties Hosever, the repart teal says that ine ornor hate submited regulation pla der Amnesty Scheme, 201, hich is pending with Be Autocity "The isonet counsel submits thal since the operation of the scheme isc her been suspended by this Cour in anotier proceedings, request for | regi larization cannot be considered. We vould, therefore, order the of ie fo fix this pettion alongwith tnose otter pettons, whorein the so-calt amrosty scheme is under consideralion, ane such petition is being C.P. Not) avait At thes pK, Seiden subs ti sa, repented oidurs om this Court: penseti in various pelitons, inucing C.P5.'No.AGe/I005 nnd Ho.D b ehicugenct ite orders restraining the Registrar andor Sub-Re fous, Assuirsiness or sails therein, neither have such ayensies stopped providing amenities IN THE HIGH COURT OF SINDH AT KARACHI C.P.NO. < of 2009 Pryetes KAR FOUNDATION rousi it's vice president Mis. Faiza Niu} sli), adult fe Karachi having office it No, 3, 2% Floor, Plot No. 62-C, 11" Commercial Stree. Housing Authority Phase Ml (Ex!) rach. serves PETITIONER 4 No.2652/2009 is attached herewith for your kind perusal and compliance rdingly Subsnitted accordingly for compliance. ey (Ghahid Jamiluddin Ahmed Khan) Director/Incharge/{(LsA), SBCA a Head Quarter Karachi swith humble request to please issue direction to all concemed functionaries, as directed by the Honourable Division Bench of Sindh High Court for its strict compliance accordingly. Qo SINDH BUILDING CONTROL AUTHORITY Head Quarter Civic Centre Karachi SBCA _retor/Ine/(LA)/HQ/tR/2012/ 291580 Dated 710.2012 All Direccors, SBCA Most Urgent ‘ll Regional Directors, BCA High Court Compliance. Registrar (Properties), Sindh : Managing Director, KESC XK Managing Director, SSGC \N Managiny, Director, KW&SB “ wr Ver CIRCULAR ® + High: Court Order in_C.P.No.2652/2000 Plot No.124 Bihar Muslim CHS. Pubar Foundation Vs KBCA & others, (KBCA Respondent No.182] With reference to the above, I amt directed by: the Honourable Division rach Noull, High Court of Sindh, at Principal Seat Kafachi, to inform all wncerned «.e, Managing Director, KESC, Managing Director, SSGC, Managing rector, KWESB, Registrar (Properties) Sindh, Sub-Registrars (Properties) for surance of compliance of the following orders of the Honourable High Court of ‘Sindh in loiter and spirit > it ss submitted that the Honourable Division Bench, comprised with MrJusticc Musheer Alam & Mr.Justice Muhammad Afzal Soomro passed Moliowing crder on 132.2007, in C.P.No.160/1998 in respect of illegal 35 Buildings ‘a the vicinity of Mazar-e-Quaid-e-Azam. The stid Petition filed by Darus De ~.tr & 11 others against KBCA. The relevant portion of the said! order fs as unc. “MeShahid Jamiluddin has filed interim report on behalf of respondent No.1, KBCA. Mz.Mubammead Sarwar Rhan, learned Additional Advocate General Sitidh states that ‘pursuant’ to .the directions of this Court” dated - 07.11.2006 meeting was chaired by the learned Advocate General Sinda, which was attended by 1G Sindh, Chief Controller of Buildings to work out ‘the modality for demolition. He further states that Minutes of the meeting fare under preparation and will be submitted before next . date. Matter is being adjourned. 4 However, in order to avoid further complications and creation of third party interest, it is directed that no Sub-leases/conveyance to be cxecuted in respect of Gommercial/residential apart ment/buildings without Occupancy certificate from KBCA as required under Section (2) of the Ordinance of 1979.-To come up immediately gher three weeks. Copy of this: order may be served on Registrar of the properties with directions to convey Girections to all the Sub-Registrars for due compliance. 3, tis submitted that the Honourable Division Bench No.II was pleased to the Honourable Division eee is, which filed’ by | Regulations Proposed Amendments \ No. | ad Proposed In all building plan the provision for utilization of at least 3% Sub Section No. | for solar energy is mandatory. 25-1.9.4 | : AGHA SIRAD IKKHAN DURRANI AUTHORITY (Under SBCO 1979) Minister Local Government i. dated 4 -09/ 2012 Chief Executive, SBCA. fed for immediate necessary action to: Secretary, Sindh Secretary to Local Government Sveretary to Chief Secretary. Administrator, MC, Karachi Director General, SBCA Al Regional Director, SBCA, Superintendent Govt, Press Govt. of Sindh with th jeation, 1 request to please publish the above in th (8 KARACHI BUILDING & TOWN PLANNING REGULATIONS 2002 (AMENDMENT) 2012 Published by Authority PART-1 SINDH BUILDING CONTROL AUTHORITY NOTIFICATION No. Chief Executive/SBCA 2012/ /048 Karachi the ¥ September, 2012 in exercise of the power conferred by Sect ee, 1979 the Authority “is pleased tom ents in the existing Karachi Building er-25- ZONING REGULATIONS. ion 2]-A of Sindh Building Control nake ahd promulyate the following & Town Planning Regulations - 2002 in The fallowing Amendments made by the Authority. under SBCO, 1979 are hereby for general information:- mendments shall’ be called KARACHI BUILDING & TOWN PLANNING TIONS (AMENDMENT) 2012, | SINDH BUILDING CONTROL AUTHORITY, Xo SBeNDDKA Inn. 2018/ 9 duet of 29> Jer ~ All Directors, IHead Quarter = All Regional Directors S.B.CA. Lowen sIAfION-sOL at SYSTEM FoR HOMES CHANG o Relerence to the President's dircetives on the subject as conveyed by the Government of Sindh, Services General Administration & Coordination Department, Government of Sindh vitle No.C-lI/SGA&CD/1-268/2012E Power) dated 17.8.2012, the Sindh Building Control Authority has made provision of the directives with approval of the Chief Executive SBCA,/ Minister Local Government Sindh in the Karachi Building and’ Town Planning Regulations 2602 vide Notification NoChief Executrive/SBCA/2012/1048 dated 4.9.2012. A. copy ‘of the: Notification is being. sént for’ information and implementation, with immediate effect by the Al! Ditectors and Regional Directors of the hale SBCA in their respective areas. (SYED MUHAMMAD ALI NAQVD) DEPUTY DIRECTOR (ADMN-P-I) S.B.C.A} Section Officer(C-Ii1), Services Genera! Administration & Coordination: Department, Government of Sindh, for information, Suporintendent, Govt, Press, Govertinént of Sind: with the request to please ie Regulations Proposed Amendments ia Nos | | Proposed Inall building plan the provision for utilization of at least 5% Sub Section No. | for solar energy is mandatory. 25-194 | i AGHA SIRAYJ KHAN DURRANI AUTHORITY (Under SBCO 1979) Minister Local Government eaied Y -09/ 2012 Chief Executive, SBCA. forwarded for immediate necessary action to: Fy to Local Government, Secretary to Chief Secretary. “Adminisir , Karachi Dirvctor Gen CA All Regional Director, SBCA. Superintendent Govt. Press Govt. of Sindh with the request to please publish the above in th ation. ls KARACHI BUILDING & TOWN PLANNING REGULATIONS 2002 (AMENDMENT) 2012 Published by Authority Karachi 44 September, 2012 PART-1 SINDH BUILDING CONTROL AUTHORITY. NOTIFICATION No. Chief Exeeutive/SBCA 2012/ 048 Karachi the Yt September, 2012 sercise of the power conferred by Section 1979 the Authority is pleased to make in the existing Karachi Building 25- ZONING REGULATIONS. Control and promullgaie the following & Town Planning Regulations - 2002 in allowing Amendnienis made by the Authority under SBCO, 1 979 ate hereby general information:~ ments shall be called KARACHI BUILDING & TOWN PLANNING INS (AMENDMENT) 2012 SINDH BUILDING CONTROL AUTHORITY No.SBCA/DD(Admn-P-1)/2012 = All Directors, Head Quarter = All Regional Directors BCA. SUBJECT: Reference to the Président’s dircetives on the subject as conveyed by the Government of Sindh, Services General Administration & Coordination Department, of Sindh vide No.C-IV/SGA&CD/1-268/2012(E.Power) dated 17.8.2012, Governm the Sindh Building Control Authority has made provision of the directives with approval ofthe Chief. E: Building and Town Planning Regulations 2002 vide, Notification No.Chief cutive SBCA / Minister Local Government Sindh in the Karachi Executrive/SBCA/2012/1 048 dated 4.9.2012. A copy of the Notification ‘is- being “sent for information and implementation, with immediate effect by the Al! Directors and Regional Djrcetors of the fare (SYED MUHAMMAD ALI NAQVD DEPUTY DIRECTOR (ADMN-P-1) SBCA in their respective areas, SBCA. Encl: Asahove, Copy ta: 1. Section Ofticer(C-UI1), Services General Adminisifation & Coordination Department, Goverment of Sindh, for information, Superintendent, Govt. Press, Government of Sindh with the re ‘publish the above in the gazcite of Notification. est to please 13 Regulations Description | Proposed Rates No. i | ' = | Sehedute*s? | iv). Proof Engineer Sr. Nod Registration Fee Fee of | Category °C” Re Professional Practicing == |, Licence ¥). Proof Engineer Rs. 15,000/- 9er annum Renewal Fee and s.500/-per month shall ‘be charged as late (ee. il {Seheauie A” Seratiny Fee in respect of Rstor pat = a Sr. No.15, eases t0 be specifically | Serutinized departimentally. | Schedule "Av | Vetting Charges | Sr. No.16 ‘50% for SBEA & 50% tobe | Re.10/- psf | paid to Proof Engineers ‘ | AGHA SIRAJ KHAN DURRANI AUTHORITY (Unie SBCO 1979) Minister Local Government schi- dated Jb 08 / 2012 Chief Executive, SBCA. ony is forwarded for Immediate necessary action to: 7" chier Secretary, Sindh, Keren to Local Government Secretary to-Chiek Secretary ‘Raminisvator, EMC, Karachi Brsetor General, SBCA Rit epional Director, SBCA eyo Supeintende Gav Press Govt of inh with he request i lente pba he ators Ime nee Page 2 0f2 ee KARACHI BUILDING & TOWN PLANNING. REGULATIONS (AMENDMENT) 2012 Published by Authority Karachi August, 2012 ° PART-I SINDH BUILDING CONTROL AUTHORITY NOTIFICATION No. Chief Executive/SBCA 2012/ 925- Karachi the 16% August, 2012 In exercise of the power conferred by Section 21-A of Sindh Building Control mance, 1979 the Authority, is pleascd to make ‘and promulgaic the, following cIeents in the existing Karachi Building & Town Planning Regulations ~ 2002 in HEDULE “A” Professional Registration Fee and Serutii for approval of fing plan. ‘The following Amendments made by the Authority under SBCO, 1979 are hereby {shed for general information:- + amendments shall be called KARACHE BUILDING’ & TOWN PLANNING ULATIONS (AMENDMENT) 2012. SINDH BUILDING CONTROL AUTHORITY enpocadnn za (Byte Dated 129° F--2e7 Directors, Head Quarter Je 1 Rogional Directors neal) CAL : yp F__ PROOF Ww appr Ll” “The Notification issued vide No.Chief Exeeutive/SBCA/2012/935 dated 2012 regarding amendments in respect of enhancement of registration fee in Karachi ECT: ENHANCEMENT _IN__REGISTRATION F ENGINEERS AND STRUCTURE ENGINEERS ding & Town Planning Regulations (Amendment) 2012 of: Proof Engineérs and ure Engineers, duly approved by the Chief Executive, SBCA is forwarded for Jementation, with immediate effect, copy enclosed. f 4 fie ha ° 1} (SYED MUHAMMAD ALINAQVD) “Ses DEPUTY DIRECTOR (ADMN-P-1) 272 SB.CA. Superintendent, Govt, Press, Government of Sindh with the request (0 please publish the above in the gazette of Notification. Secretary to Director General, SBCA. /o Regulations . | Proposed Amendments h Now| ° ae! (ae T | i | Schedule “A? Scrutiny tee for industrial plot, which is situated beyond 50. | Sr. Now| km from any Municipal Limit shall be'charged 4, Ps, 10/ Sq | Serutiny Fee tor] Fh aes | approval or Jans | build AGHA SIRAJ KHAN DURRANI AUTHORITY i (Under SBCO 1979) Minister Local Government Hcinted 15-06 f 2012 Chief Executive, SBCA. is Forwarded for immediane necessary etian t0:- Chief Seereiary, Sindh, Secretary to Local Government, Secretary io Chief Seeretary.* Administrator, KMC, Karachi Director General, SBCA +All Regional Director. SBCA Superintendent Govt, Press Govt, of Sindh with the request to plense publish the above in the gazette Beation, KARACHI BUILDING & TOWN PLANNING REGULATIONS (AMENDMENT) 2012 Published by Authority Karachi /5'B June . PART =| SINDH BUILDING CONTROL ITHORITY NOTIFICATION 5 No. Chief Executive/SBCA 2012/9 St Karachi the 1S June, 2012 exercise of the power conferred by Section 21-A al Sindh Build 1979 the Authority is pleased toy and promulgaw the sting Karachi Building & “Town Planning Regul ‘A” Scrutiny Fee for approval af buildiny plan Contr! 2002 ig Amendments made by the Au general information:- Wy under SBCO, 1979 are hereby iments shail be called KARACHI. Bt TDING & TOWN PLAN HONS (AMENDMEN'T) 2012 SINDIT BUILDING CONTROL AUTHORITY cappradmn-rsnraoie’ [102-4 END: NT The Notification issued vide No.Chiet Executrive/SBCAV2012/981 dated 012 is enclosed regarding Karachi Building & ‘Town Planning Regulations iment) 2012, duly approved by the Chict Excoutive, SBCA / Minister Local “we nent, Sindh is forwarded for implementation, with. immediate effect, Issue Asabove, (SYED MUHAMMAD ALI NAQVi) DEPUTY DIRECTOR(ADMN-P-l) SBCA. © All Directors of SBCA Head Quarter. All Regional Directors of SBCA. All Sectional Heads of SBCA. P.S, to Chief Executive SBCA / Minister Local Government Sindh. P.S, to Secretary, Local Governmnent Department, Government of Sindh, ‘Seoretary to Director General, Sindh Building Control Authsrity Oftice order file SINDII BUILDING CONTROL AUTHORITY, DD(Admn-P-1V2012/ BE 7 Dated: ORDER CT: FINAL APPROVAL BEFORE SALE NOC Director General, SBCA has becn pleased to direct that Final Approval of ject be restrained unless the NOC for sale first is obtained from the Authority and ects under construction without NOC for sale of the SBCA-be sealed till such time for sale is obtained. A Lam directed to request all the Directors of the SBCA to. observe the ¢ sl directives of the Director General, SBCA and report compliance on the action ~ Ae ‘against the projects running withiout NOC of sale. & TOR(ADMINISTRATION) S.B.CA. y ERABAD (BUILDIN IERABAD (TOWN PLANNING) PURKIAS Fy 10, Director General, SBCA, SINDH BUILDING CONTROL AUTHORITY f construction of 2" floor on plot No: 1478/3, 1549/3, 1654/3, Siddiaqabad, Memon ea. The Report is confirming the existence of 2" floor on these plots. However, there a val from One Window Section. The construction of the 2” flaar is absolutely ANG %) The D.G-SBCA has seen the Report submitted by the Director Gulberg Town on the \ = The D.G.-SBCA has taken it a serious negligence on the part of field staff. It has been in future the Officer on duty at Public Counter will observe the following ore as Director General ieee ca Dae et Public Counter / One Window Operation’will not charge scrutiny foe of HG the 2 floor of the Type Design Plans which are to be approved by the : One Window at the initial stage. z 2- One Window will approve only Ground+1" fidor plans. 3- Second floor will be approved after the completion of Ground and First floors by the owner. 4- The Field Officer of the concerned Town will verify the completion granted fon Ground and first floors of the concerned plot. 5+ One Window Operation will in future also forward a copy of the approval of Ground and first floors to the concerned Town for their information. 6 One Window Counter will delete completely the 2" floor if visible on the plan instead of embossing stemp. The above instructions of the Director General-SBCA are being forwarded for compliance by all the Directors, Officer on duty at Public Counterand One Window. ( Engr. S.M:R:Zaidi ul Wasti) Director - Administration All Directors ~ SBCA = Public Counter + One Window Operation - Secretary to D.G.-SBCA, SINDU BUILDING CONTROL AUTHORITY & MIDI Admn- PAO & [AL fred: WW 2, 12 Ph goer j Lp / 4] 4 oleh: El ete ; : ee | DD Ete} fs P.NO.39482011 > AGAINST REGULARIZATION SCTEMED = UNITED HUMAN RIGITS COMMISSION VS PROVINCE OF SINDIL& OTHERS, (SBCA R PONDENY NO.3: ae The Constitution Petition as noted at subject filed fon in the High Court has been decided in favour of £i Building Control Director General, SBCA has desired thai ihe esses pending for on with Directors may be disposed’ ef of priority basis and compliance repurt fed by Monday, the 23! Api; 2012 positively: ccanite the petforimiace of #5 of the Towns, ia -UL-WASTI) R(AIMINISTRATION) Dircetor General. SBCA. Direstns (Admin PL SHON, Sine iee zs 257 a. Cpe SINDH BUILDING CONTROL AUTHORITY (Directorate of Legal Affaire, Head Quarter, Karachi ADrectonineL AyHIZO12/ 2 GV 1 Dated: 26 May 2012 Tho Director, (Administration), SBCA IMPORTANT case Regarding Director, (Saddar Town), SBCA, HIGH COURT ORDER PASSED IN C.P.NO. 0-408 of 2012, HIGH COURT ORDER PASSED IN C.P.NO. 0-408 of 2012, MIS Fidai Co-operative H.S. Ltd, & Others VIS SBCA & Others With reference to the above, itis respectfully submitted that the above-mentioned case P for hearing before Mr.Justice Maqbool Bagar & Mr.Justicé Nadeem’ Akhtar, Judges of h Court of Sindh, at Karachi, on 17.05.2012 and after hearing the Honourable Division Passed the fcllowing order, relevant portion of the said order, is as under: Order Dated 17.05.2012 “Notice to the respondents as well as Advocate General, Sindh for 17.8.12. Operation of the impugned notification/Scheme shall Temain suspended till 17.8.12." The above order dated 17.05.2012, is erystal clear and the Honourable Divistah. Benen pend the operation of the said Notification. You are humble requested to please issue ns {0 all concer of SBCA, for its perusal and strict compliance, Accordingly Report submitted for kind perusal, information and compliance of eburt order. Kal eiratr son rma aes, Ey QaiL— Ore. (Shahid Jamiluddin Ahmed Khan) jd Directorlincharge, (L.A), SBCA, BOS? lead Quarter, Karachi, . SINDH BUILDING CONTROL AUTHORITY (Directorate of Logat Affairs, Head Quarter, Karachi) Dated: 28"May 2012 AVDirectoriine/.AyHa/2012/ 1 Bs Girector, (Administration), SECA IMPORTANT CAS Regarding: Director, (Saddar Town), SBCA. HIGH COURT ORDER PASSED IN C.P.NO.0-408 of 2012. MIS Fidai Co-operative H.S. Ltd. & Others WIS SBCA & Others fed that the above-menticned case With reference to the above, it is respectfully subniit p for hearing before Wr Justice Maqbool Baqar & Mr_Justice Nacieem Akhtar, Judges of h Court of Singh, at Karachi, on°17,08.2012 and after hearing the Honourable Division passed the following order, relevant portion of the said erder. is as under Order Dated 17.05.2042 “Notice to the respondents as woll as Advocate General, Sindh for 17.8.12, Operation of the impugned notification/Scheme shall romain suspended till 17.8.12." ‘The above order dated 17.05.2012, is crystal clear and the Honourable Division Bench {Suspend the operalion of the said Notification. You are humble requested to please issue jons to all concern of SBCA, for ils perusal and strict compliance, Accordingly, Report submitted for kind perusal, information aic.compliarice of court order aad Kefek eas en aces fo fe {Here € wt i 2G052. a (Shahid Jamituddin Ahmed Khan) Directoriinchargo, (L.A), SBCA. (22 es ee eee yO AY Dyn atrs $64 hes iN a, SHEA ae Eee zie” 5647 ‘No,AO(AOMN!)2(62)/2012 ; 23 /lo/t2.:. GOVERNMENT OF SINDH LOCAL GOVERNMENT DEPARTMENT Karachi, dated the 28" September, 2012 pe dD “CIRCULAR > 1 has been Observed thal the Taluka Municipal Acministraions "9 Edefinci) have hean approving and issving No Objection Certificates, Building Plans ys) fond Sucturss Deas for Gunatiaetin of Privale Burks art Commercial Houstig | aie! Szhamor afr euablshon ol he Sia tring Cons Aon set . Ky 2 curiner infeed thatthe Sich Buldng Canl Autry has vsen | >So ‘established 1. the function of the Building Control Authority under the Singh Building Gontiol Ordiane, 1979 to whale of tna Provineo of Sindh vie this Deperimen’s «© a Notiicasion No SO{LECHHTH¢S-25 112009, dated 14.02.2011 A pele 3 Jeneaforth, no functions and powers of the Bulking Control 2s delined per Under the sich Bulling Conte! Ordinance, 1979 are’to be exercised by any person(s} ci establishment(s) failing which the disciplinary proceeding shall be Poa ‘oitated against him / them under RSO, 2000, k. Doe 4 in view of above, the Metropolitan Corporations, the’ District Councils, ee er cas roa beremrsnarsand nen tal” eo ae eae fly and sl (2 oxeeong Torco al 8 eo as — agate. 0 (FAZLUR RAHMAN] es SECRETARY TO GOVT, OF SINDH ae NO.AQ(ADI i -1)2(62)/2012 Karachi dated the 28” September A cop, 's forwarded for information to: Se. ‘The Commissioner (Al) in Sindh The Director General, Sindh Building Control Authority, Karachi ‘The Deputy Commissioner (All) in Sindh. ‘2 Svsretary, Singh Local Government Board, Karas ‘The Regional Director, Sinclh Suilding Contre! Authanty (Al) in Sindh. ‘The Municipal Commissioner, Metropolitan Gorporetion (All) in-Sindh, The Uiief Dicer, Disidet Councits (ii) in Sindh ‘The Chief Offiver, TMA (Al) in Sindh, The P 3 to Secretary, LGD, Go8, Karachi 10, The PS to Special Senretany (LG/Hgusing!Tech ), LGD. Gos, Karachi Benaik BuiEpieie. Co Be (Sat born ALL dizeots Z eM Rewianal Diz: GOVERNMENT OF SINDH. SERVICES GENERAL ADMINISTRATION » COORDINATION DEPARTEEN Kovach! dated che December 31,2008 NOTIFICATION © SGABCD) 10-219/2008; In exercise of the powers con (3) of the Sindh Bulleing Control Ordinance 1979, the Government of Sindh red by Section 1 all the Government buildings under? the purview of edinance (Ibi!) of Sindli from die operation of all the provisions of the ©} FAZALUR-REHMAN Cher Secresary Sloaty IGAMCD) 16-21 9/2008 1 Karachi-dated the December 31, 2008 A copy Is forwarded for Information to: The Additional Chiet Secretary (Dev.) PexD Deparsment/Local Gover Department, Government of Shih. i The Senlor Member, Board of Revenue, Sindh, Hyderabad. The Principal Secretary to Governor Sindh The Secretary to Chief Minister Sindh, Tho Administrative Secretaries (All) Government of Sindh (inching Meinbers Board of Revenue) The Secretary to Provincial Ombudsmian Sindh, Karachi. Tine City/District Nazimss (Al) in Sindh. The District Coordination Officers (Al) in Sind. The Chairman Chief Minkster’s Inspection Team, Karachi The Ehalrman, Enquiries e& Anti-Corruption Estabisimient, SGARCO. The Reglstrar High Cout of, Sindh, Karachi. Tine Secretary, Provinclal Assembly Secretariat, Kafachi. The Secretary, Sindh Public Service Commission, Hyderabad The Additional Secretary (Staff) to Chief Secretary. All Officers in SGAMCD/Private Secretary to Chief Secretaiy Sindh, . GURL wae SECTION OFFICER (NUDGE) De ky are

Das könnte Ihnen auch gefallen