BLASTING AND PAINTING INSPECTION cose —— idee
far ev
REPORT + [Barer 20074
tama te Report No.: BAP- Total page. 1
Item: CCM SECONDARY SUCTION SYSTEM Item
Project: VINA KYOE! STEEL PLANT IProceduce No: 5&8
Drawing No.: Ad-2437-230-002 ne eee
STRUCTURE BEAMS No: = oe
jorking place
Blesting Area = : EXTERNAL,
Surface Grace | oo e ee oe
Blasting Material : Se lean
Shot Biasting Condition [Date poe 21:00 28-Aug
Temperature (°C). | 29 i
Humisity 71%
1 Result OK
ls.sch)
Painting Condition Speccount tet 2nd ‘st (inside)
Painting Materia KCC Paint P-120 Hal Au AU-850 MP I20-Dark Grey
_, [Counting Thickness bm ol eo nose
3 [painting tethoa Airless Spray | Aiiess Spray | Airless Spray Airless Spray
Ax lime time date | 22:00 28-Aug | 13:00 30-Aug | 22:00 28-Aug
Lremperature “c 28 as 28
3 ftumisy % 75% 3% 75%
four 8
& |ievat ini eur eaage3 oe te
2 (actual DET bm 72 122 See
Visual check. SSihee cena 9 ee Cs
Result
LILAMAI8 KCC Inspector vKs
PREPARED INSPECTED REVIEWED
sign T& prise
Name. | Ni gaqen Chonk Long Aten
baie_[ 31 Aag 20 Bg ote
d{susan Saal" _j_# Ae ett
Wma] Seems
aaa a [Rasa]
(wand ~ tana ie
RMN HOR MRUSHS NON AANONDOIS HID —
4 re UCI 15 =r fom
= a
=e woo [oer
a wr
eee eae
lel ee
ke le
E
om EE wee re
z Teen
ate ema