Sie sind auf Seite 1von 2
BLASTING AND PAINTING INSPECTION cose —— idee far ev REPORT + [Barer 20074 tama te Report No.: BAP- Total page. 1 Item: CCM SECONDARY SUCTION SYSTEM Item Project: VINA KYOE! STEEL PLANT IProceduce No: 5&8 Drawing No.: Ad-2437-230-002 ne eee STRUCTURE BEAMS No: = oe jorking place Blesting Area = : EXTERNAL, Surface Grace | oo e ee oe Blasting Material : Se lean Shot Biasting Condition [Date poe 21:00 28-Aug Temperature (°C). | 29 i Humisity 71% 1 Result OK ls.sch) Painting Condition Speccount tet 2nd ‘st (inside) Painting Materia KCC Paint P-120 Hal Au AU-850 MP I20-Dark Grey _, [Counting Thickness bm ol eo nose 3 [painting tethoa Airless Spray | Aiiess Spray | Airless Spray Airless Spray Ax lime time date | 22:00 28-Aug | 13:00 30-Aug | 22:00 28-Aug Lremperature “c 28 as 28 3 ftumisy % 75% 3% 75% four 8 & |ievat ini eur eaage3 oe te 2 (actual DET bm 72 122 See Visual check. SSihee cena 9 ee Cs Result LILAMAI8 KCC Inspector vKs PREPARED INSPECTED REVIEWED sign T& prise Name. | Ni gaqen Chonk Long Aten baie_[ 31 Aag 20 Bg ote d {susan Saal" _j_# Ae ett Wma] Seems aaa a [Rasa] (wand ~ tana ie RMN HOR MRUSHS NON AANONDOIS HID — 4 re UCI 15 =r fom = a =e woo [oer a wr eee eae lel ee ke le E om EE wee re z Teen ate ema

Das könnte Ihnen auch gefallen