Sie sind auf Seite 1von 87

STV EXTENSION PLAN STV NORTH EAST

Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 1 of 61
Date: 03.10.2013

1. SUMMARY
The SVNE Topside is to be conducted the load out on 06 October 2013 at 9:00
VSP_05 cargo barge, dimensions 109.80 m in length x 32.0 m in width x 7.0m in height. Topside loaded out from stern end of the barge.
The SVNE Topside included support beam and trailer is approximate 936.98 m.ton. Jetty elevation above chart datum is 5400 mm and
seabed below datum minimum 8000 mm.
The height from water level to top of jetty is 4.10 m at 1.30 m tide prior to commence the load out. The sequence is work out based on 09
stages to complete the load out. The process of load out must be completed within the rising tide range of 1.3 m to 2.1 m and limitation of
the barge depth once the ballasting to adjust the barge in even keel may also need to wait for the tide to level barge with jetty before
process the next stage.
Total 22 numbers of self priming centrifugal pumps, 1450 RPM each 300m 3/hr, to be provided for Topside load out. The capacity of pumps
required using about 50% itselfs.
Once the load out date change but the corresponding tide & gradient of tide curve at commencing time are similar, load out ballasting is still
able to follow this procedure. However, minors adjustment of ballast at site is expected.

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

2. GENERAL DESCRIPTION
2.1 BARGE INFORMATION
VSP_01 barge which is used for transportation, has the following principal particulars:
Length (Overall)

109.80

Beam (Molded)

32.0

Draft

7.00

Lightship Weight

Page 2 of 61

3347.010MTON

The barge is an all welded construction. The main hull is divided by 08 main transverse watertight bulkheads,
03 watertight side longitudinal Bulkhead.
2.2 CARGO DATA
DESCRIPTION WEIGHTS

Weight of SVNE Topside


Weight of Trailer group + Beam

734.00 M.TON
202.99 M.TON

Total Weight

936.98 M.TON

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 3 of 61
Date: 03.10.2013

2.3 STERN LOAD OUT OF SVNE TOPSIDE AT JETTY


Trailer No.1

18 axles SPMT

Trailer No.2

18 axles SPMT

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 4 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

*******************************************************************************
*
****** AUTO F.A.B_Ver 2.0 ******
*
*
Force analysis of Trailer group
*
*******************************************************************************
* Dist
Load
Load
LCG
LMT
TCG
TMT
VCG
VMT
*
* (m)
Name
(Ton)
(m)
(Ton.m)
(m)
(Ton.m)
(m)
(Ton.m)*
*******************************************************************************
Load on Group
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-06.04 L_bri.1
0.00
-54.74 0.00
8.04
0.00
16.76 0.00
-06.04 L_bri.2
0.00
-54.74 0.00
-7.30
0.00
16.76 0.00
................................................................................
Sum
L.bridge 0.00
0.00
0.00
0.00
0.00
0.00
0.00
................................................................................
Total load on this step:
-6.04 m
Sum
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-------------------------------------------------------------------------------Load on Group
0.00
0.00
0.00
0.00
0.00
0.00
0.00
00.00 L_bri.1
55.27
-54.74 -3025.48
8.04
444.35
16.76 926.27
00.00 L_bri.2
50.97
-54.74 -2790.20
-7.30
-372.07 16.76 854.24
................................................................................
Load on L_bridge 106.24
-54.74 -5815.68
0.68
72.27
16.76 1780.52
................................................................................
Total load on this step:
0.00 m
Sum
106.24
-54.74 -5815.68
0.68
72.27
16.76 1780.52
-------------------------------------------------------------------------------06.04 Trailer1
115.34 -51.13 -5896.96
8.04
927.37
16.76 1933.17
06.04 Trailer2
106.37 -51.13 -5438.39
-7.30
-776.53 16.76 1782.84
................................................................................
Load on Group
221.72
-51.13 -11335.35 0.68
150.83
16.76 3716.00
06.04

L_bri.1

Page 5 of 61

55.27

-54.74

-3025.48

8.04

444.35

16.76

926.27

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

06.04 L_bri.2
50.97
-54.74 -2790.20
-7.30
-372.07 16.76 854.24
................................................................................
Load on L_bridge 106.24
-54.74 -5815.68
0.68
72.27
16.76 1780.52
................................................................................
Total load on this step:
6.04 m
Sum
327.95
-52.30 -17151.03 0.68
223.10
16.76 5496.52
-------------------------------------------------------------------------------12.08 Trailer1
230.69 -48.11 -11097.25 8.04
1854.73 16.76 3866.33
12.08 Trailer2
212.75 -48.11 -10234.28 -7.30
-1553.07 16.76 3565.67
................................................................................
Load on Group
443.44
-48.11 -21331.53 0.68
301.67
16.76 7432.00
12.08 L_bri.1
55.27
-54.74 -3025.48
8.04
444.35
16.76 926.27
12.08 L_bri.2
50.97
-54.74 -2790.21
-7.30
-372.07 16.76 854.24
................................................................................
Load on L_bridge 106.24
-54.74 -5815.68
0.68
72.27
16.76 1780.52
................................................................................
Total load on this step:
12.08 m
Sum
549.67
-49.39 -27147.21 0.68
373.94
16.76 9212.52
-------------------------------------------------------------------------------18.12 Trailer1
341.44 -44.97 -15355.70 8.04
2745.18 16.76 5722.54
18.12 Trailer2
315.04 -44.98 -14169.43 -7.30
-2299.76 16.76 5280.00
................................................................................
Load on Group
656.48
-44.98 -29525.13 0.68
445.42
16.76 11002.54
18.12 L_bri.1
46.47
-54.74 -2543.71
8.04
373.59
16.76 778.78
18.12 L_bri.2
43.13
-54.74 -2361.33
-7.30
-314.88 16.76 722.94
................................................................................
Load on L_bridge 89.60
-54.74 -4905.04
0.66
58.70
16.76 1501.72
................................................................................
Total load on this step:
18.12 m

Page 6 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Sum
746.08
-46.15 -34430.17 0.68
504.12
16.76 12504.25
-------------------------------------------------------------------------------24.16 Trailer1
438.42 -41.63 -18251.34 8.04
3524.87 16.76 7347.87
24.16 Trailer2
405.06 -41.65 -16869.10 -7.30
-2956.94 16.76 6788.80
................................................................................
Load on Group
843.48
-41.64 -35120.44 0.67
567.94
16.76 14136.67
24.16 L_bri.1
38.91
-54.74 -2129.96
8.04
312.82
16.76 652.10
24.16 L_bri.2
36.12
-54.74 -1977.25
-7.30
-263.67 16.76 605.35
................................................................................
Load on L_bridge 75.03
-54.74 -4107.22
0.66
49.16
16.76 1257.46
................................................................................
Total load on this step:
24.16 m
Sum
918.50
-42.71 -39227.65 0.67
617.09
16.76 15394.13
-------------------------------------------------------------------------------30.20 Trailer1
486.91 -36.99 -18009.05 8.04
3914.72 16.76 8160.54
30.20 Trailer2
450.07 -37.01 -16655.81 -7.30
-3285.52 16.76 7543.20
................................................................................
Load on Group
936.98
-37.00 -34664.86 0.67
629.20
16.76 15703.74
30.20 L_bri.1
0.00
-54.74 0.00
8.04
0.00
16.76 0.00
30.20 L_bri.2
0.00
-54.74 0.00
-7.30
0.00
16.76 0.00
................................................................................
Sum
L.bridge 0.00
0.00
0.00
0.00
0.00
0.00
0.00
................................................................................
Total load on this step:
30.20 m
Sum
936.98
-37.00 -34664.86 0.67
629.20
16.76 15703.74
-------------------------------------------------------------------------------36.24 Trailer1
486.91 -30.95 -15068.14 8.04
3914.72 16.76 8160.54
36.24 Trailer2
450.07 -30.97 -13937.38 -7.30
-3285.52 16.76 7543.20
................................................................................

Page 7 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Load on Group

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 8 of 61
Date: 03.10.2013

936.98

-30.96

-29005.52

0.67

629.20

16.76

15703.74

36.24 L_bri.1
0.00
-54.74 0.00
8.04
0.00
16.76 0.00
36.24 L_bri.2
0.00
-54.74 0.00
-7.30
0.00
16.76 0.00
................................................................................
Sum
L.bridge 0.00
0.00
0.00
0.00
0.00
0.00
0.00
................................................................................
Total load on this step:
36.24 m
Sum
936.98
-30.96 -29005.52 0.67
629.20
16.76 15703.74
-------------------------------------------------------------------------------49.83 Trailer1
486.91 -17.36 -8451.11
8.04
3914.72 16.76 8160.54
49.83 Trailer2
450.07 -17.38 -7820.91
-7.30
-3285.52 16.76 7543.20
................................................................................
Load on Group
936.98
-17.37 -16272.02 0.67
629.20
16.76 15703.74
49.83 L_bri.1
0.00
-54.74 0.00
8.04
0.00
16.76 0.00
49.83 L_bri.2
0.00
-54.74 0.00
-7.30
0.00
16.76 0.00
................................................................................
Sum
L.bridge 0.00
0.00
0.00
0.00
0.00
0.00
0.00
................................................................................
Total load on this step:
49.83 m
Sum
936.98
-17.37 -16272.02 0.67
629.20
16.76 15703.74
-------------------------------------------------------------------------------60.26 Trailer1
486.91 -6.93
-3372.68
8.04
3914.72 16.76 8160.54
60.26 Trailer2
450.07 -6.95
-3126.66
-7.30
-3285.52 16.76 7543.20
................................................................................
Load on Group
936.98
-6.94
-6499.34
0.67
629.20
16.76 15703.74
60.26 L_bri.1
0.00
-54.74 0.00
8.04
0.00
16.76 0.00
60.26 L_bri.2
0.00
-54.74 0.00
-7.30
0.00
16.76 0.00
................................................................................

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Sum
L.bridge 0.00
0.00
0.00
0.00
0.00
0.00
0.00
................................................................................
Total load on this step:
60.26 m
Sum
936.98
-6.94
-6499.34
0.67
629.20
16.76 15703.74
-------------------------------------------------------------------------------Calculated on 10/2/2013 at 2:55:43 PM
***********************************************************************End*****

Page 9 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

2.4 TIDE DATA AND TIDE CURVE

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 10 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 11 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 12 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

2.5 LOAD OUT SEQUENCEL


109800

14400

14400

14400

14400

14400

14400

5400

7200

8000

8000

10800

8000

8000

CL

BOW
BARGE

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 13 of 61
Date: 03.10.2013

3. BALLAST CALCULATION AND TIDE COMPENSATION, BARGE STABILITY CHECK:


Hydromax 13.01, build: 2091
Model file: D:\VTT\ SVNE \Untitled (Medium precision, 52 sections). Analysis tolerance - ideal(worst case): Disp.%: 0.01000(0.100); Trim%(LCG-TCG): 0.01000(0.100);
Heel%(LCG-TCG): 0.01000(0.100)

3.1 Loadcase : Pre_Loadout


Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)
Void space 1 (P)
Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)

Quantity

1
1
1
65.04%
0%
0%
65.04%
0%
0%
0%
0%
62.18%
0%
0%
62.18%
0%
98.76%
98.76%
0%
0%
98.76%
98.76%

Sounding
m

4.679
0.000
0.000
4.679
0.000
0.000
0.000
0.000
4.371
0.000
0.000
4.371
0.000
6.913
6.913
0.000
0.000
6.913
6.913

Unit Mass
tonne

3347.010
200.000
0.000
538.095
542.198
542.198
538.095
804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029

Total Mass
tonne

3347.010
200.000
0.000
350.000
0.000
0.000
350.000
0.000
0.000
0.000
0.000
500.000
0.000
0.000
500.000
0.000
800.000
800.000
0.000
0.000
800.000
800.000

Long.Arm
m

0.378
0.000
0.000
-49.203
-49.308
-49.308
-49.203
-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300

Trans.Arm
m

0.001
0.000
0.000
-11.957
-4.000
4.000
11.957
-11.973
-4.000
4.000
11.973
-11.957
-4.000
4.000
11.957
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000

Vert.Arm
m

3.574
7.500
0.000
2.483
3.633
3.633
2.483
3.523
3.500
3.500
3.523
2.208
3.500
3.500
2.208
3.523
3.457
3.457
3.523
3.523
3.457
3.457

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298
0.000
0.000
0.000
0.000
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 4 (S)


Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)
Void space 5 (S)
Void space 6 (P)
Void space 6 (CP)
Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)
Total Loadcase
FS correction
VCG fluid

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 14 of 61
Date: 03.10.2013

Quantity

0%
0%
0%
0%
0%
15.54%
0%
0%
15.54%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

0.000
0.000
0.000
0.000
0.000
1.131
0.000
0.000
1.131
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

804.171
804.171
810.029
810.029
804.171
804.146
810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

0.000
0.000
0.000
0.000
0.000
125.000
0.000
0.000
125.000
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000
9057.010

Long.Arm
m

6.300
20.700
20.700
20.700
20.700
35.099
35.100
35.100
35.099
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842
-3.717

Trans.Arm
m

11.973
-11.973
-4.000
4.000
11.973
-11.827
-4.000
4.000
11.827
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943
0.000

Vert.Arm
m

3.523
3.523
3.500
3.500
3.523
0.578
3.500
3.500
0.578
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089
3.278
0.435
3.712

Unit FSM
tonne.m

Total FSM
tonne.m

0.000
0.000
0.000
0.000
0.000
629.760
0.000
0.000
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000
3935.957

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 15 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

14
3.1.2.4: Initial GMt GM at 0.0 deg = 30.043 m

12
10

Max GZ = 7.958 m at 24.4 deg.

GZ m

8
6
4
2
0
-2

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2
Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m
VCB from DWL m

30

0.0

9057
2.788
2.788
104.838
2.788
32.000
3831.659
3352.205
0.953
0.945
-3.712
-1.359

40
50
Heel to Starboard deg.

10.0

9057
2.740
2.740
109.800
5.320
31.646
3809.698
3295.259
0.922
0.478
-3.152
-1.782

20.0

9057
2.154
2.154
109.800
7.189
20.467
3355.567
2153.245
0.939
0.547
-2.494
-2.471

60

70

30.0

9057
1.313
1.313
109.800
8.687
14.000
3378.027
1472.907
0.946
0.662
-2.221
-3.239

80

40.0

9057
0.282
0.282
109.800
9.922
10.890
3389.978
1145.718
0.950
0.745
-2.076
-3.998

90

50.0

9057
-1.108
-1.108
109.800
10.966
9.138
3397.778
961.371
0.952
0.803
-1.981
-4.677

60.0

9057
-3.237
-3.237
109.800
11.788
8.083
3403.567
850.383
0.954
0.845
-1.911
-5.237

70.0

9057
-7.239
-7.239
109.800
12.251
7.449
3408.287
783.717
0.955
0.882
-1.854
-5.654

80.0

9057
-18.761
-18.761
109.800
12.343
7.108
3412.438
747.814
0.957
0.917
-1.803
-5.912

90.0

9057
N/A
N/A
109.800
12.059
7.000
3416.319
736.453
0.958
0.953
-1.756
-6.000

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 16 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

GZ m
LCF from zero pt. (+ve fwd) m
TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

0.000
-2.521
0.000
0.0
0.0

10.0

5.204
-2.200
1.306
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

7.801
-1.745
4.930
20.0
0.0

30.0

7.829
-1.745
5.207
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)

40.0

7.106
-1.745
5.325
40.0
0.0

50.0

6.015
-1.745
5.282
50.0
0.0
Value

60.0

70.0

4.681
-1.745
5.078
60.0
0.0
Units

3.176
-1.745
4.720
70.0
0.0
Actual

80.0

1.560
-1.745
4.218
80.0
0.0
Status

90.0

-0.109
-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
89.4
deg
0.0550 m.rad 3.0437

Pass

+5433.91

Pass
0.0

deg

0.0

40.0
n/a
89.4
0.0900

deg
40.0
deg
deg
m.rad 4.3521

Pass

+4735.64

Pass
30.0

deg

30.0

40.0
n/a
89.4
0.0300

deg
40.0
deg
deg
m.rad 1.3084

Pass

+4261.42

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 17 of 61
Date: 03.10.2013

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

Criteria

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs

Value

Units

Actual

Status

Margin
%

Pass
30.0

deg

30.0

90.0
24.5
0.200

deg
deg
m

90.0

deg

30.0

7.829

Pass

+3814.57

3.1.2.4: Initial GMt


spec. heel angle
shall not be less than (>=)

0.0
0.150

deg
m

Pass
30.043

Pass

+19928.93

3.1.2.3: Angle of maximum GZ


shall not be less than (>=)

15.0

deg

24.5

Pass
Pass

+63.64

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.2 Loadcase Stage 1_ 0m from stern barge


Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)
Void space 1 (P)
Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)
Void space 4 (S)
Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)
Void space 5 (S)

Page 18 of 61

Quantity

1
1
1
62.69%
0%
0%
61.33%
0%
0%
0%
0%
62.18%
0%
0%
62.18%
0%
98.76%
98.76%
0%
0%
98.76%
98.76%
0%
0%
0%
0%
0%

Sounding
m

4.523
0.000
0.000
4.432
0.000
0.000
0.000
0.000
4.371
0.000
0.000
4.371
0.000
6.913
6.913
0.000
0.000
6.913
6.913
0.000
0.000
0.000
0.000
0.000

Unit Mass
tonne

3347.010
200.000
106.240
538.095
542.198
542.198
538.095
804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171

Total Mass
tonne

3347.010
200.000
106.240
337.350
0.000
0.000
330.020
0.000
0.000
0.000
0.000
500.000
0.000
0.000
500.000
0.000
800.000
800.000
0.000
0.000
800.000
800.000
0.000
0.000
0.000
0.000
0.000

Long.Arm
m

0.378
0.000
-54.740
-49.192
-49.308
-49.308
-49.185
-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300
6.300
20.700
20.700
20.700
20.700

Trans.Arm
m

0.001
0.000
0.680
-11.955
-4.000
4.000
11.954
-11.973
-4.000
4.000
11.973
-11.957
-4.000
4.000
11.957
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973

Vert.Arm
m

3.574
7.500
16.760
2.404
3.633
3.633
2.358
3.523
3.500
3.500
3.523
2.208
3.500
3.500
2.208
3.523
3.457
3.457
3.523
3.523
3.457
3.457
3.523
3.523
3.500
3.500
3.523

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298
0.000
0.000
0.000
0.000
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 6 (P)


Void space 6 (CP)
Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)
Total Loadcase
FS correction
VCG fluid

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 19 of 61
Date: 03.10.2013

Quantity

20.51%
2.47%
2.47%
20.51%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

1.476
0.173
0.173
1.476
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

804.146
810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

164.950
19.980
19.980
164.950
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000
9250.480

Long.Arm
m

35.099
35.092
35.092
35.099
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842
-3.638

Trans.Arm
m

-11.869
-4.000
4.000
11.869
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943
-0.001

Vert.Arm
m

0.754
0.087
0.087
0.754
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089
3.397
0.562
3.959

Unit FSM
tonne.m

Total FSM
tonne.m

629.760
629.760
629.760
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000
5195.477

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
12

Page 20 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.1.2.4: Initial GMt GM at 0.0 deg = 29.194 m

10
Max GZ = 7.769 m at 24.4 deg.

GZ m

8
6
4
2
0
-2

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2
Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m

30

0.0

9250
2.845
2.845
104.984
2.845
32.000
3849.777
3356.882
0.953
0.944
-3.687

40
50
Heel to Starboard deg.

10.0

9250
2.798
2.798
109.800
5.377
31.696
3829.140
3304.993
0.923
0.482
-3.131

20.0

9250
2.247
2.247
109.800
7.276
20.467
3413.777
2153.245
0.939
0.552
-2.478

60

70

30.0

9250
1.461
1.461
109.800
8.816
14.000
3436.237
1472.907
0.946
0.666
-2.211

80

40.0

9250
0.497
0.497
109.800
10.087
10.890
3448.188
1145.718
0.950
0.748
-2.069

90

50.0

9250
-0.802
-0.802
109.800
11.162
9.138
3455.988
961.371
0.952
0.806
-1.976

60.0

9250
-2.793
-2.793
109.800
12.010
8.083
3461.778
850.383
0.954
0.847
-1.908

70.0

9250
-6.535
-6.535
109.800
12.492
7.449
3466.497
783.717
0.955
0.883
-1.852

80.0

9250
-17.307
-17.307
109.800
12.595
7.108
3470.648
747.814
0.957
0.918
-1.802

90.0

9250
N/A
N/A
109.800
12.316
7.000
3474.530
736.453
0.958
0.953
-1.756

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 21 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

VCB from DWL m


GZ m
LCF from zero pt. (+ve fwd) m
TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

-1.386
0.001
-2.448
0.000
0.0
0.0

10.0

-1.802
5.068
-2.159
1.286
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

-2.506
7.629
-1.745
4.690
20.0
0.0

30.0

-3.298
7.611
-1.745
4.985
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability

40.0

-4.078
6.860
-1.745
5.129
40.0
0.0

50.0

-4.774
5.751
-1.745
5.117
50.0
0.0
Value

60.0

70.0

-5.347
4.408
-1.745
4.950
60.0
0.0
Units

-5.774
2.903
-1.745
4.632
70.0
0.0
Actual

80.0

-6.038
1.296
-1.745
4.174
80.0
0.0
Status

90.0

-6.129
-0.355
-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
87.9
deg
0.0550 m.rad 2.9692

Pass

+5298.61

Pass
0.0

deg

0.0

40.0
n/a
87.9
0.0900

deg
40.0
deg
deg
m.rad 4.2368

Pass
Pass

30.0

deg

30.0

40.0
n/a
87.9

deg
deg
deg

40.0

+4607.59

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 22 of 61
Date: 03.10.2013

Code

Criteria

shall not be less than (>=)


A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs

Value

Units

Actual

0.0300 m.rad 1.2676

Status

Pass

Margin
%

+4125.33

Pass
30.0

deg

30.0

90.0
24.5
0.200

deg
deg
m

90.0

deg

30.0

7.611

Pass

+3705.69

3.1.2.4: Initial GMt


spec. heel angle
shall not be less than (>=)

0.0
0.150

deg
m

Pass
29.194

Pass

+19362.73

3.1.2.3: Angle of maximum GZ


shall not be less than (>=)

15.0

deg

24.5

Pass
Pass

+63.64

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.3 Loadcase Stage 2_ 6.04m from stern barge


Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)
Void space 1 (P)
Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)
Void space 4 (S)
Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)
Void space 5 (S)

Page 23 of 61

Quantity

1
1
1
58.11%
0%
0%
54.09%
0%
0%
0%
0%
62.18%
0%
0%
62.18%
0%
98.76%
98.76%
0%
0%
98.76%
98.76%
0%
0%
0%
0%
0%

Sounding
m

4.218
0.000
0.000
3.951
0.000
0.000
0.000
0.000
4.371
0.000
0.000
4.371
0.000
6.913
6.913
0.000
0.000
6.913
6.913
0.000
0.000
0.000
0.000
0.000

Unit Mass
tonne

3347.010
200.000
327.950
538.095
542.198
542.198
538.095
804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171

Total Mass
tonne

3347.010
200.000
327.950
312.670
0.000
0.000
291.060
0.000
0.000
0.000
0.000
500.000
0.000
0.000
500.000
0.000
800.000
800.000
0.000
0.000
800.000
800.000
0.000
0.000
0.000
0.000
0.000

Long.Arm
m

0.378
0.000
-52.300
-49.168
-49.308
-49.308
-49.143
-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300
6.300
20.700
20.700
20.700
20.700

Trans.Arm
m

0.001
0.000
0.680
-11.951
-4.000
4.000
11.948
-11.973
-4.000
4.000
11.973
-11.957
-4.000
4.000
11.957
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973

Vert.Arm
m

3.574
7.500
16.760
2.249
3.633
3.633
2.112
3.523
3.500
3.500
3.523
2.208
3.500
3.500
2.208
3.523
3.457
3.457
3.523
3.523
3.457
3.457
3.523
3.523
3.500
3.500
3.523

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298
0.000
0.000
0.000
0.000
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 6 (P)


Void space 6 (CP)
Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)
Total Loadcase
FS correction
VCG fluid

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 24 of 61
Date: 03.10.2013

Quantity

30.2%
7.28%
7.28%
30.2%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

2.150
0.510
0.510
2.150
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

804.146
810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

242.870
58.940
58.940
242.870
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000
9642.310

Long.Arm
m

35.099
35.097
35.097
35.099
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842
-3.488

Trans.Arm
m

-11.911
-4.000
4.000
11.911
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943
-0.003

Vert.Arm
m

1.094
0.255
0.255
1.094
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089
3.648
0.539
4.187

Unit FSM
tonne.m

Total FSM
tonne.m

629.760
629.760
629.760
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000
5195.477

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
12

Page 25 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.1.2.4: Initial GMt GM at 0.0 deg = 27.822 m

10

GZ m

Max GZ = 7.493 m at 23.5 deg.

6
4
2
0
-2

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2
Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m

30

0.0

9642
2.958
2.958
105.279
2.958
32.000
3886.457
3366.339
0.952
0.944
-3.633

40
50
Heel to Starboard deg.

10.0

9642
2.915
2.915
109.800
5.493
31.797
3868.447
3324.588
0.924
0.491
-3.090

20.0

9642
2.436
2.436
109.800
7.454
20.467
3531.668
2153.245
0.940
0.562
-2.448

60

70

30.0

9642
1.761
1.761
109.800
9.075
14.000
3554.128
1472.907
0.947
0.674
-2.192

80

40.0

9642
0.932
0.932
109.800
10.420
10.890
3566.079
1145.718
0.950
0.755
-2.056

90

50.0

9642
-0.184
-0.184
109.800
11.560
9.138
3573.880
961.371
0.952
0.811
-1.967

60.0

9642
-1.894
-1.894
109.800
12.459
8.083
3579.669
850.383
0.954
0.851
-1.901

70.0

9642
-5.108
-5.108
109.800
12.980
7.449
3584.389
783.717
0.956
0.886
-1.847

80.0

9642
-14.363
-14.363
109.800
13.106
7.108
3588.539
747.814
0.957
0.920
-1.800

90.0

9642
N/A
N/A
109.800
12.835
7.000
3592.421
736.453
0.958
0.954
-1.755

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 26 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

VCB from DWL m


GZ m
LCF from zero pt. (+ve fwd) m
TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

-1.441
0.003
-2.300
0.000
0.0
0.0

10.0

-1.841
4.848
-2.079
1.245
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

-2.578
7.368
-1.745
4.202
20.0
0.0

30.0

-3.418
7.303
-1.745
4.536
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability

40.0

-4.239
6.533
-1.745
4.732
40.0
0.0

50.0

-4.969
5.422
-1.745
4.784
50.0
0.0
Value

60.0

70.0

-5.571
4.089
-1.745
4.690
60.0
0.0
Units

-6.018
2.605
-1.745
4.455
70.0
0.0
Actual

80.0

-6.293
1.029
-1.745
4.084
80.0
0.0
Status

90.0

-6.388
-0.584
-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
86.4
deg
0.0550 m.rad 2.8553

Pass

+5091.47

Pass
0.0

deg

0.0

40.0
n/a
86.4
0.0900

deg
40.0
deg
deg
m.rad 4.0669

Pass
Pass

30.0

deg

30.0

40.0
n/a
86.4

deg
deg
deg

40.0

+4418.79

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 27 of 61
Date: 03.10.2013

Code

Criteria

shall not be less than (>=)


A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs
3.1.2.4: Initial GMt
spec. heel angle
shall not be less than (>=)
3.1.2.3: Angle of maximum GZ
shall not be less than (>=)

Value

Units

Actual

0.0300 m.rad 1.2116

Status

Pass

Margin
%

+3938.67

Pass
30.0

deg

30.0

90.0
23.6
0.200

deg
deg
m

90.0

deg

30.0

7.303

Pass

+3551.36

Pass
0.0
0.150

15.0

deg
m

deg

27.822

Pass

+18447.92

23.6

Pass
Pass

+57.58

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.4 Loadcase Stage 3_ 12.08m from stern barge


Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)
Void space 1 (P)
Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)
Void space 4 (S)
Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)
Void space 5 (S)

Page 28 of 61

Quantity

1
1
1
54.06%
0%
0%
47.71%
0%
0%
0%
0%
62.18%
0%
0%
62.18%
0%
98.76%
98.76%
0%
0%
98.76%
98.76%
0%
0%
0%
0%
0%

Sounding
m

3.950
0.000
0.000
3.527
0.000
0.000
0.000
0.000
4.371
0.000
0.000
4.371
0.000
6.913
6.913
0.000
0.000
6.913
6.913
0.000
0.000
0.000
0.000
0.000

Unit Mass
tonne

3347.010
200.000
549.670
538.095
542.198
542.198
538.095
804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171

Total Mass
tonne

3347.010
200.000
549.670
290.920
0.000
0.000
256.710
0.000
0.000
0.000
0.000
500.000
0.000
0.000
500.000
0.000
800.000
800.000
0.000
0.000
800.000
800.000
0.000
0.000
0.000
0.000
0.000

Long.Arm
m

0.378
0.000
-49.390
-49.143
-49.308
-49.308
-49.096
-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300
6.300
20.700
20.700
20.700
20.700

Trans.Arm
m

0.001
0.000
0.680
-11.948
-4.000
4.000
11.941
-11.973
-4.000
4.000
11.973
-11.957
-4.000
4.000
11.957
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973

Vert.Arm
m

3.574
7.500
16.760
2.111
3.633
3.633
1.895
3.523
3.500
3.500
3.523
2.208
3.500
3.500
2.208
3.523
3.457
3.457
3.523
3.523
3.457
3.457
3.523
3.523
3.500
3.500
3.523

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298
0.000
0.000
0.000
0.000
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 6 (P)


Void space 6 (CP)
Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)
Total Loadcase
FS correction
VCG fluid

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 29 of 61
Date: 03.10.2013

Quantity

38.75%
11.52%
11.52%
38.75%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

2.743
0.806
0.806
2.743
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

804.146
810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

311.580
93.290
93.290
311.580
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000
10014.050

Long.Arm
m

35.099
35.098
35.098
35.099
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842
-3.357

Trans.Arm
m

-11.930
-4.000
4.000
11.930
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943
-0.003

Vert.Arm
m

1.392
0.403
0.403
1.392
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089
3.900
0.519
4.419

Unit FSM
tonne.m

Total FSM
tonne.m

629.760
629.760
629.760
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000
5195.477

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
12

Page 30 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.1.2.4: Initial GMt GM at 0.0 deg = 26.591 m

10

GZ m

Max GZ = 7.221 m at 23.5 deg.

6
4
2
0
-2

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2
Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m
VCB from DWL m

30

0.0

10014
3.066
3.066
105.558
3.066
32.000
3921.196
3375.252
0.951
0.943
-3.581
-1.493

40
50
Heel to Starboard deg.

10.0

10014
3.025
3.025
109.800
5.601
31.893
3905.667
3343.069
0.925
0.498
-3.051
-1.880

20.0

10014
2.616
2.616
109.800
7.622
20.467
3643.515
2153.245
0.941
0.570
-2.422
-2.648

60

70

30.0

10014
2.045
2.045
109.800
9.321
14.000
3665.975
1472.907
0.947
0.682
-2.176
-3.533

80

40.0

10014
1.346
1.346
109.800
10.737
10.890
3677.926
1145.718
0.950
0.761
-2.044
-4.392

90

50.0

10014
0.403
0.403
109.800
11.937
9.138
3685.727
961.371
0.953
0.816
-1.959
-5.155

60.0

10014
-1.041
-1.041
109.800
12.886
8.083
3691.516
850.383
0.954
0.854
-1.895
-5.782

70.0

10014
-3.755
-3.755
109.800
13.443
7.449
3696.236
783.717
0.956
0.889
-1.843
-6.248

80.0

10014
-11.571
-11.571
109.800
13.591
7.108
3700.386
747.814
0.957
0.921
-1.798
-6.536

90.0

10014
N/A
N/A
109.800
13.327
7.000
3704.268
736.453
0.958
0.954
-1.755
-6.634

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 31 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

GZ m
LCF from zero pt. (+ve fwd) m
TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

0.003
-2.161
0.000
0.0
0.0

10.0

4.646
-2.004
1.205
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

7.110
-1.745
3.739
20.0
0.0

30.0

6.998
-1.745
4.109
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)

40.0

6.210
-1.745
4.354
40.0
0.0

50.0

5.095
-1.745
4.467
50.0
0.0
Value

60.0

70.0

3.771
-1.745
4.444
60.0
0.0
Units

2.306
-1.745
4.286
70.0
0.0
Actual

80.0

0.759
-1.745
3.998
80.0
0.0
Status

90.0

-0.817
-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
84.8
deg
0.0550 m.rad 2.7455

Pass

+4891.77

Pass
0.0

deg

0.0

40.0
n/a
84.8
0.0900

deg
40.0
deg
deg
m.rad 3.9019

Pass

+4235.46

Pass
30.0

deg

30.0

40.0
n/a
84.8
0.0300

deg
40.0
deg
deg
m.rad 1.1564

Pass

+3754.8

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 32 of 61
Date: 03.10.2013

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

Criteria

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs

Value

Units

Actual

Status

Margin
%

Pass
30.0

deg

30.0

90.0
23.6
0.200

deg
deg
m

90.0

deg

30.0

6.998

Pass

+3399.19

3.1.2.4: Initial GMt


spec. heel angle
shall not be less than (>=)

0.0
0.150

deg
m

Pass
26.591

Pass

+17627.26

3.1.2.3: Angle of maximum GZ


shall not be less than (>=)

15.0

deg

23.6

Pass
Pass

+57.58

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.5 Loadcase Stage 4_ 18.12m from stern barge


Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)
Void space 1 (P)
Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)
Void space 4 (S)
Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)

Page 33 of 61

Quantity

1
1
1
51.12%
0%
0%
43.06%
0%
0%
0%
0%
62.18%
0%
0%
62.18%
0%
98.76%
98.76%
0%
0%
98.76%
98.76%
0%
0%
0%
0%

Sounding
m

3.754
0.000
0.000
3.218
0.000
0.000
0.000
0.000
4.371
0.000
0.000
4.371
0.000
6.913
6.913
0.000
0.000
6.913
6.913
0.000
0.000
0.000
0.000

Unit Mass
tonne

3347.010
200.000
746.080
538.095
542.198
542.198
538.095
804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029

Total Mass
tonne

3347.010
200.000
746.080
275.060
0.000
0.000
231.680
0.000
0.000
0.000
0.000
500.000
0.000
0.000
500.000
0.000
800.000
800.000
0.000
0.000
800.000
800.000
0.000
0.000
0.000
0.000

Long.Arm
m

0.378
0.000
-46.150
-49.123
-49.308
-49.308
-49.052
-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300
6.300
20.700
20.700
20.700

Trans.Arm
m

0.001
0.000
0.680
-11.945
-4.000
4.000
11.934
-11.973
-4.000
4.000
11.973
-11.957
-4.000
4.000
11.957
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000

Vert.Arm
m

3.574
7.500
16.760
2.011
3.633
3.633
1.735
3.523
3.500
3.500
3.523
2.208
3.500
3.500
2.208
3.523
3.457
3.457
3.523
3.523
3.457
3.457
3.523
3.523
3.500
3.500

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298
0.000
0.000
0.000
0.000
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 5 (S)


Void space 6 (P)
Void space 6 (CP)
Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)
Total Loadcase
FS correction
VCG fluid

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 34 of 61
Date: 03.10.2013

Quantity

0%
44.97%
14.61%
14.61%
44.97%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

0.000
3.176
1.023
1.023
3.176
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

804.171
804.146
810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

0.000
361.650
118.320
118.320
361.650
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000
10319.770

Long.Arm
m

20.700
35.100
35.099
35.099
35.100
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842
-3.257

Trans.Arm
m

11.973
-11.940
-4.000
4.000
11.940
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943
-0.001

Vert.Arm
m

3.523
1.609
0.511
0.511
1.609
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089
4.123
0.503
4.626

Unit FSM
tonne.m

Total FSM
tonne.m

0.000
629.760
629.760
629.760
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000
5195.477

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 35 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

12
3.1.2.4: Initial GMt GM at 0.0 deg = 25.616 m
10

GZ m

Max GZ = 6.985 m at 23.5 deg.

6
4
2
0
-2

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2
Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m
VCB from DWL m
GZ m

30

0.0

10320
3.154
3.154
105.788
3.154
32.000
3949.699
3382.456
0.951
0.943
-3.537
-1.536
0.001

40
50
Heel to Starboard deg.

10.0

10320
3.116
3.116
109.800
5.690
31.971
3936.226
3358.191
0.926
0.504
-3.019
-1.912
4.482

20.0

10320
2.763
2.763
109.800
7.761
20.467
3735.499
2153.245
0.941
0.577
-2.402
-2.706
6.886

60

70

30.0

10320
2.279
2.279
109.800
9.524
14.000
3757.959
1472.907
0.947
0.688
-2.163
-3.627
6.737

80

40.0

10320
1.685
1.685
109.800
10.997
10.890
3769.910
1145.718
0.951
0.766
-2.036
-4.519
5.931

90

50.0

10320
0.886
0.886
109.800
12.248
9.138
3777.710
961.371
0.953
0.819
-1.952
-5.308
4.813

60.0

10320
-0.340
-0.340
109.800
13.237
8.083
3783.499
850.383
0.954
0.857
-1.891
-5.957
3.494

70.0

10320
-2.643
-2.643
109.800
13.823
7.449
3788.219
783.717
0.956
0.890
-1.840
-6.438
2.044

80.0

10320
-9.274
-9.274
109.800
13.990
7.108
3792.370
747.814
0.957
0.922
-1.796
-6.735
0.520

90.0

10320
N/A
N/A
109.800
13.732
7.000
3796.251
736.453
0.958
0.954
-1.755
-6.837
-1.024

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 36 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

LCF from zero pt. (+ve fwd) m


TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

-2.048
0.000
0.0
0.0

10.0

-1.943
1.171
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

-1.745
3.359
20.0
0.0

30.0

-1.745
3.758
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)

40.0

-1.745
4.044
40.0
0.0

50.0

-1.745
4.207
50.0
0.0
Value

60.0

70.0

-1.745
4.242
60.0
0.0
Units

-1.745
4.148
70.0
0.0
Actual

80.0

-1.745
3.928
80.0
0.0
Status

90.0

-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
83.4
deg
0.0550 m.rad 2.6527

Pass

+4723.04

Pass
0.0

deg

0.0

40.0
n/a
83.4
0.0900

deg
40.0
deg
deg
m.rad 3.7617

Pass

+4079.61

Pass
30.0

deg

30.0

40.0
n/a
83.4
0.0300

deg
40.0
deg
deg
m.rad 1.1090

Pass

+3596.6

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 37 of 61
Date: 03.10.2013

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

Criteria

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs

Value

Units

Actual

Status

Margin
%

Pass
30.0

deg

30.0

90.0
23.6
0.200

deg
deg
m

90.0

deg

30.0

6.737

Pass

+3268.3

3.1.2.4: Initial GMt


spec. heel angle
shall not be less than (>=)

0.0
0.150

deg
m

Pass
25.616

Pass

+16977.33

3.1.2.3: Angle of maximum GZ


shall not be less than (>=)

15.0

deg

23.6

Pass
Pass

+57.58

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.6 Loadcase Stage 5_ 24.16m from stern barge


Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)
Void space 1 (P)
Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)
Void space 4 (S)
Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)
Void space 5 (S)

Page 38 of 61

Quantity

1
1
1
49.18%
0%
0%
39.99%
0%
0%
0%
0%
62.18%
0%
0%
62.18%
0%
98.76%
98.76%
0%
0%
98.76%
98.76%
0%
0%
0%
0%
0%

Sounding
m

3.625
0.000
0.000
3.015
0.000
0.000
0.000
0.000
4.371
0.000
0.000
4.371
0.000
6.913
6.913
0.000
0.000
6.913
6.913
0.000
0.000
0.000
0.000
0.000

Unit Mass
tonne

3347.010
200.000
918.500
538.095
542.198
542.198
538.095
804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171

Total Mass
tonne

3347.010
200.000
918.500
264.620
0.000
0.000
215.190
0.000
0.000
0.000
0.000
500.000
0.000
0.000
500.000
0.000
800.000
800.000
0.000
0.000
800.000
800.000
0.000
0.000
0.000
0.000
0.000

Long.Arm
m

0.378
0.000
-42.710
-49.108
-49.308
-49.308
-49.018
-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300
6.300
20.700
20.700
20.700
20.700

Trans.Arm
m

0.001
0.000
0.670
-11.943
-4.000
4.000
11.929
-11.973
-4.000
4.000
11.973
-11.957
-4.000
4.000
11.957
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973

Vert.Arm
m

3.574
7.500
16.760
1.945
3.633
3.633
1.629
3.523
3.500
3.500
3.523
2.208
3.500
3.500
2.208
3.523
3.457
3.457
3.523
3.523
3.457
3.457
3.523
3.523
3.500
3.500
3.523

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298
0.000
0.000
0.000
0.000
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 6 (P)


Void space 6 (CP)
Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)
Total Loadcase
FS correction
VCG fluid

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 39 of 61
Date: 03.10.2013

Quantity

49.07%
16.64%
16.64%
49.07%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

3.461
1.165
1.165
3.461
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

804.146
810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

394.620
134.810
134.810
394.620
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000
10564.180

Long.Arm
m

35.100
35.099
35.099
35.100
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842
-3.181

Trans.Arm
m

-11.945
-4.000
4.000
11.945
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943
0.002

Vert.Arm
m

1.752
0.583
0.583
1.752
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089
4.317
0.492
4.808

Unit FSM
tonne.m

Total FSM
tonne.m

629.760
629.760
629.760
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000
5195.477

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 40 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

12
3.1.2.4: Initial GMt GM at 0.0 deg = 24.863 m
10
8

GZ m

Max GZ = 6.787 m at 22.6 deg.


6
4
2
0
-2

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2
Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m
VCB from DWL m
GZ m

30

0.0

10564
3.225
3.225
105.970
3.225
32.000
3972.609
3388.561
0.950
0.943
-3.501
-1.570
-0.002

40
50
Heel to Starboard deg.

10.0

10564
3.188
3.188
109.800
5.761
32.033
3960.405
3369.992
0.926
0.509
-2.994
-1.938
4.352

20.0

10564
2.881
2.881
109.800
7.872
20.467
3809.035
2153.245
0.942
0.583
-2.387
-2.752
6.699

60

70

30.0

10564
2.466
2.466
109.800
9.686
14.000
3831.495
1472.907
0.948
0.692
-2.153
-3.704
6.517

80

40.0

10564
1.957
1.957
109.800
11.205
10.890
3843.446
1145.718
0.951
0.769
-2.029
-4.620
5.696

90

50.0

10564
1.272
1.272
109.800
12.496
9.138
3851.246
961.371
0.953
0.822
-1.948
-5.430
4.572

60.0

10564
0.221
0.221
109.800
13.517
8.083
3857.036
850.383
0.954
0.859
-1.887
-6.096
3.257

70.0

10564
-1.753
-1.753
109.800
14.128
7.449
3861.756
783.717
0.956
0.892
-1.838
-6.590
1.819

80.0

10564
-7.437
-7.437
109.800
14.309
7.108
3865.906
747.814
0.957
0.923
-1.795
-6.894
0.313

90.0

10564
N/A
N/A
109.800
14.056
7.000
3869.788
736.453
0.958
0.954
-1.754
-6.999
-1.207

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 41 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

LCF from zero pt. (+ve fwd) m


TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

-1.953
0.000
0.0
0.0

10.0

-1.892
1.144
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

-1.745
3.054
20.0
0.0

30.0

-1.745
3.478
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)

40.0

-1.745
3.796
40.0
0.0

50.0

-1.745
3.999
50.0
0.0
Value

60.0

70.0

-1.745
4.080
60.0
0.0
Units

-1.745
4.037
70.0
0.0
Actual

80.0

-1.745
3.872
80.0
0.0
Status

90.0

-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
82.1
deg
0.0550 m.rad 2.5760

Pass

+4583.7

Pass
0.0

deg

0.0

40.0
n/a
82.1
0.0900

deg
40.0
deg
deg
m.rad 3.6451

Pass

+3950.14

Pass
30.0

deg

30.0

40.0
n/a
82.1
0.0300

deg
40.0
deg
deg
m.rad 1.0691

Pass

+3463.64

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 42 of 61
Date: 03.10.2013

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

Criteria

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs

Value

Units

Actual

Status

Margin
%

Pass
30.0

deg

30.0

90.0
23.6
0.200

deg
deg
m

90.0

deg

30.0

6.517

Pass

+3158.48

3.1.2.4: Initial GMt


spec. heel angle
shall not be less than (>=)

0.0
0.150

deg
m

Pass
24.863

Pass

+16475.49

3.1.2.3: Angle of maximum GZ


shall not be less than (>=)

15.0

deg

23.6

Pass
Pass

+57.58

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.7 Loadcase Stage 6_ 30.2m from stern barge


Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)
Void space 1 (P)
Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)
Void space 4 (S)
Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)
Void space 5 (S)

Page 43 of 61

Quantity

1
1
1
51.61%
0%
0%
42.42%
3.25%
0%
0%
3.25%
62.18%
0%
0%
62.18%
3.25%
98.76%
98.76%
3.25%
0%
98.76%
98.76%
0%
0%
0%
0%
0%

Sounding
m

3.787
0.000
0.000
3.176
0.250
0.000
0.000
0.250
4.371
0.000
0.000
4.371
0.250
6.913
6.913
0.250
0.000
6.913
6.913
0.000
0.000
0.000
0.000
0.000

Unit Mass
tonne

3347.010
200.000
936.980
538.095
542.198
542.198
538.095
804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171

Total Mass
tonne

3347.010
200.000
936.980
277.710
0.000
0.000
228.280
26.180
0.000
0.000
26.180
500.000
0.000
0.000
500.000
26.180
800.000
800.000
26.180
0.000
800.000
800.000
0.000
0.000
0.000
0.000
0.000

Long.Arm
m

0.378
0.000
-37.000
-49.126
-49.308
-49.308
-49.045
-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300
6.300
20.700
20.700
20.700
20.700

Trans.Arm
m

0.001
0.000
0.670
-11.945
-4.000
4.000
11.934
-11.613
-4.000
4.000
11.613
-11.957
-4.000
4.000
11.957
-11.613
-4.000
4.000
11.613
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973

Vert.Arm
m

3.574
7.500
16.760
2.028
3.633
3.633
1.713
0.126
3.500
3.500
0.126
2.208
3.500
3.500
2.208
0.126
3.457
3.457
0.126
3.523
3.457
3.457
3.523
3.523
3.500
3.500
3.523

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298
629.760
0.000
0.000
629.760
629.760
0.000
0.000
629.760
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 6 (P)


Void space 6 (CP)
Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)
Total Loadcase
FS correction
VCG fluid

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 44 of 61
Date: 03.10.2013

Quantity

47.45%
16.64%
16.64%
47.45%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

3.348
1.165
1.165
3.348
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

804.146
810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

381.530
134.810
134.810
381.530
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000
10687.380

Long.Arm
m

35.100
35.099
35.099
35.100
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842
-3.145

Trans.Arm
m

-11.943
-4.000
4.000
11.943
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943
0.004

Vert.Arm
m

1.695
0.583
0.583
1.695
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089
4.297
0.722
5.019

Unit FSM
tonne.m

Total FSM
tonne.m

629.760
629.760
629.760
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000
7714.516

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 45 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

12
3.1.2.4: Initial GMt GM at 0.0 deg = 24.372 m

10
8

GZ m

Max GZ = 6.642 m at 22.6 deg.


6
4
2
0
-2

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2
Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m
VCB from DWL m

30

0.0

10687
3.260
3.260
106.062
3.260
32.000
3984.094
3391.481
0.950
0.942
-3.483
-1.587

40
50
Heel to Starboard deg.

10.0

10687
3.224
3.224
109.800
5.797
32.064
3972.522
3375.857
0.927
0.511
-2.981
-1.951

20.0

10687
2.940
2.940
109.800
7.927
20.467
3846.103
2153.245
0.942
0.585
-2.380
-2.776

60

70

30.0

10687
2.560
2.560
109.800
9.767
14.000
3868.563
1472.907
0.948
0.694
-2.149
-3.742

80

40.0

10687
2.094
2.094
109.800
11.310
10.890
3880.514
1145.718
0.951
0.771
-2.026
-4.671

90

50.0

10687
1.466
1.466
109.800
12.621
9.138
3888.314
961.371
0.953
0.823
-1.945
-5.492

60.0

10687
0.504
0.504
109.800
13.658
8.083
3894.104
850.383
0.955
0.860
-1.886
-6.166

70.0

10687
-1.305
-1.305
109.800
14.281
7.449
3898.824
783.717
0.956
0.893
-1.837
-6.666

80.0

10687
-6.512
-6.512
109.800
14.470
7.108
3902.974
747.814
0.957
0.923
-1.794
-6.975

90.0

10687
N/A
N/A
109.800
14.219
7.000
3906.856
736.453
0.958
0.954
-1.754
-7.080

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 46 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

GZ m
LCF from zero pt. (+ve fwd) m
TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

-0.004
-1.907
0.000
0.0
0.0

10.0

4.268
-1.865
1.131
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

6.564
-1.745
2.901
20.0
0.0

30.0

6.347
-1.745
3.337
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)

40.0

5.502
-1.745
3.671
40.0
0.0

50.0

4.361
-1.745
3.894
50.0
0.0
Value

60.0

70.0

3.035
-1.745
3.998
60.0
0.0
Units

1.594
-1.745
3.981
70.0
0.0
Actual

80.0

0.092
-1.745
3.843
80.0
0.0
Status

90.0

-1.418
-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
80.6
deg
0.0550 m.rad 2.5220

Pass

+4485.38

Pass
0.0

deg

0.0

40.0
n/a
80.6
0.0900

deg
40.0
deg
deg
m.rad 3.5591

Pass

+3854.59

Pass
30.0

deg

30.0

40.0
n/a
80.6
0.0300

deg
40.0
deg
deg
m.rad 1.0372

Pass

+3357.25

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 47 of 61
Date: 03.10.2013

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

Criteria

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs

Value

Units

Actual

Status

Margin
%

Pass
30.0

deg

30.0

90.0
23.6
0.200

deg
deg
m

90.0

deg

30.0

6.347

Pass

+3073.58

3.1.2.4: Initial GMt


spec. heel angle
shall not be less than (>=)

0.0
0.150

deg
m

Pass
24.372

Pass

+16147.73

3.1.2.3: Angle of maximum GZ


shall not be less than (>=)

15.0

deg

23.6

Pass
Pass

+57.58

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.8 Loadcase Stage 7_ 36.24m from stern barge


Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)
Void space 1 (P)
Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)
Void space 4 (S)
Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)

Page 48 of 61

Quantity

1
1
1
54.63%
0%
0%
45.44%
7.29%
0%
0%
7.29%
62.18%
0%
0%
62.18%
7.29%
98.76%
98.76%
7.29%
0%
98.76%
98.76%
0%
0%
0%
0%

Sounding
m

3.987
0.000
0.000
3.377
0.550
0.000
0.000
0.550
4.371
0.000
0.000
4.371
0.550
6.913
6.913
0.550
0.000
6.913
6.913
0.000
0.000
0.000
0.000

Unit Mass
tonne

3347.010
200.000
936.980
538.095
542.198
542.198
538.095
804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029

Total Mass
tonne

3347.010
200.000
936.980
293.940
0.000
0.000
244.510
58.650
0.000
0.000
58.650
500.000
0.000
0.000
500.000
58.650
800.000
800.000
58.650
0.000
800.000
800.000
0.000
0.000
0.000
0.000

Long.Arm
m

0.378
0.000
-30.960
-49.147
-49.308
-49.308
-49.075
-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300
6.300
20.700
20.700
20.700

Trans.Arm
m

0.001
0.000
0.670
-11.948
-4.000
4.000
11.938
-11.689
-4.000
4.000
11.689
-11.957
-4.000
4.000
11.957
-11.689
-4.000
4.000
11.689
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000

Vert.Arm
m

3.574
7.500
16.760
2.131
3.633
3.633
1.817
0.278
3.500
3.500
0.278
2.208
3.500
3.500
2.208
0.278
3.457
3.457
0.278
3.523
3.457
3.457
3.523
3.523
3.500
3.500

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298
629.760
0.000
0.000
629.760
629.760
0.000
0.000
629.760
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 5 (S)


Void space 6 (P)
Void space 6 (CP)
Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)
Total Loadcase
FS correction
VCG fluid

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 49 of 61
Date: 03.10.2013

Quantity

0%
45.43%
16.64%
16.64%
45.43%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

0.000
3.208
1.165
1.165
3.208
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

804.171
804.146
810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

0.000
365.300
134.810
134.810
365.300
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000
10817.260

Long.Arm
m

20.700
35.100
35.099
35.099
35.100
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842
-3.108

Trans.Arm
m

11.973
-11.941
-4.000
4.000
11.941
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943
0.004

Vert.Arm
m

3.523
1.625
0.583
0.583
1.625
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089
4.251
0.713
4.964

Unit FSM
tonne.m

Total FSM
tonne.m

0.000
629.760
629.760
629.760
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000
7714.516

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
10

Page 50 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.1.2.4: Initial GMt GM at 0.0 deg = 24.137 m

8
Max GZ = 6.597 m at 22.6 deg.

GZ m

-2

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2
Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m
VCB from DWL m
GZ m

30

0.0

10817
3.298
3.298
106.159
3.298
32.000
3996.211
3394.565
0.949
0.942
-3.464
-1.605
-0.004

40
50
Heel to Starboard deg.

10.0

10817
3.262
3.262
109.800
5.834
32.097
3985.289
3382.029
0.927
0.513
-2.967
-1.965
4.229

20.0

10817
3.003
3.003
109.800
7.986
20.467
3885.181
2153.245
0.942
0.588
-2.372
-2.801
6.517

60

70

30.0

10817
2.660
2.660
109.800
9.853
14.000
3907.641
1472.907
0.948
0.697
-2.144
-3.783
6.307

80

40.0

10817
2.238
2.238
109.800
11.421
10.890
3919.591
1145.718
0.951
0.773
-2.022
-4.725
5.476

90

50.0

10817
1.671
1.671
109.800
12.752
9.138
3927.392
961.371
0.953
0.825
-1.943
-5.557
4.350

60.0

10817
0.802
0.802
109.800
13.807
8.083
3933.181
850.383
0.955
0.861
-1.884
-6.240
3.042

70.0

10817
-0.832
-0.832
109.800
14.443
7.449
3937.901
783.717
0.956
0.893
-1.836
-6.747
1.617

80.0

10817
-5.536
-5.536
109.800
14.639
7.108
3942.052
747.814
0.957
0.924
-1.794
-7.059
0.131

90.0

10817
N/A
N/A
109.800
14.391
7.000
3945.933
736.453
0.958
0.954
-1.754
-7.166
-1.363

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 51 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

LCF from zero pt. (+ve fwd) m


TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

-1.859
0.000
0.0
0.0

10.0

-1.837
1.117
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

-1.745
2.739
20.0
0.0

30.0

-1.745
3.188
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)

40.0

-1.745
3.539
40.0
0.0

50.0

-1.745
3.783
50.0
0.0
Value

60.0

70.0

-1.745
3.912
60.0
0.0
Units

-1.745
3.922
70.0
0.0
Actual

80.0

-1.745
3.813
80.0
0.0
Status

90.0

-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
80.9
deg
0.0550 m.rad 2.5027

Pass

+4450.38

Pass
0.0

deg

0.0

40.0
n/a
80.9
0.0900

deg
40.0
deg
deg
m.rad 3.5340

Pass

+3826.7

Pass
30.0

deg

30.0

40.0
n/a
80.9
0.0300

deg
40.0
deg
deg
m.rad 1.0313

Pass

+3337.75

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 52 of 61
Date: 03.10.2013

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

Criteria

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs

Value

Units

Actual

Status

Margin
%

Pass
30.0

deg

30.0

90.0
23.6
0.200

deg
deg
m

90.0

deg

30.0

6.307

Pass

+3053.63

3.1.2.4: Initial GMt


spec. heel angle
shall not be less than (>=)

0.0
0.150

deg
m

Pass
24.137

Pass

+15991.28

3.1.2.3: Angle of maximum GZ


shall not be less than (>=)

15.0

deg

23.6

Pass
Pass

+57.58

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.9 Loadcase Stage 8_ 49.83m from stern barge


Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)
Void space 1 (P)
Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)
Void space 4 (S)
Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)

Page 53 of 61

Quantity

1
1
1
61.41%
0%
0%
52.23%
16.38%
0%
0%
16.38%
62.18%
0%
0%
62.18%
16.38%
98.76%
98.76%
16.38%
0%
98.76%
98.76%
0%
0%
0%
0%

Sounding
m

4.438
0.000
0.000
3.828
1.189
0.000
0.000
1.189
4.371
0.000
0.000
4.371
1.189
6.913
6.913
1.189
0.000
6.913
6.913
0.000
0.000
0.000
0.000

Unit Mass
tonne

3347.010
200.000
936.980
538.095
542.198
542.198
538.095
804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029

Total Mass
tonne

3347.010
200.000
936.980
330.470
0.000
0.000
281.040
131.700
0.000
0.000
131.700
500.000
0.000
0.000
500.000
131.700
800.000
800.000
131.700
0.000
800.000
800.000
0.000
0.000
0.000
0.000

Long.Arm
m

0.378
0.000
-17.370
-49.186
-49.308
-49.308
-49.131
-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300
6.300
20.700
20.700
20.700

Trans.Arm
m

0.001
0.000
0.670
-11.954
-4.000
4.000
11.946
-11.835
-4.000
4.000
11.835
-11.957
-4.000
4.000
11.957
-11.835
-4.000
4.000
11.835
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000

Vert.Arm
m

3.574
7.500
16.760
2.361
3.633
3.633
2.049
0.607
3.500
3.500
0.607
2.208
3.500
3.500
2.208
0.607
3.457
3.457
0.607
3.523
3.457
3.457
3.523
3.523
3.500
3.500

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298
629.760
0.000
0.000
629.760
629.760
0.000
0.000
629.760
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 5 (S)


Void space 6 (P)
Void space 6 (CP)
Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)
Total Loadcase
FS correction
VCG fluid

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 54 of 61
Date: 03.10.2013

Quantity

0%
40.88%
16.64%
16.64%
40.88%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

0.000
2.892
1.165
1.165
2.892
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

804.171
804.146
810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

0.000
328.770
134.810
134.810
328.770
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000
11109.460

Long.Arm
m

20.700
35.099
35.099
35.099
35.099
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842
-3.028

Trans.Arm
m

11.973
-11.934
-4.000
4.000
11.934
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943
0.003

Vert.Arm
m

3.523
1.467
0.583
0.583
1.467
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089
4.168
0.694
4.862

Unit FSM
tonne.m

Total FSM
tonne.m

0.000
629.760
629.760
629.760
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000
7714.516

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
10

Page 55 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

3.1.2.4: Initial GMt GM at 0.0 deg = 23.615 m

8
Max GZ = 6.485 m at 22.6 deg.

GZ m

-2

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2
Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m
VCB from DWL m

30

0.0

11110
3.381
3.381
106.377
3.381
32.000
4023.436
3401.498
0.949
0.942
-3.420
-1.646

40
50
Heel to Starboard deg.

10.0

11109
3.347
3.347
109.800
5.918
32.171
4013.768
3395.633
0.928
0.518
-2.937
-1.996

20.0

11109
3.144
3.144
109.800
8.119
20.467
3973.096
2153.245
0.942
0.594
-2.356
-2.858

60

70

30.0

11109
2.883
2.883
109.800
10.047
14.000
3995.556
1472.907
0.948
0.702
-2.133
-3.874

80

40.0

11109
2.563
2.563
109.800
11.670
10.890
4007.507
1145.718
0.951
0.777
-2.015
-4.846

90

50.0

11109
2.132
2.132
109.800
13.049
9.138
4015.307
961.371
0.953
0.828
-1.938
-5.704

60.0

11109
1.472
1.472
109.800
14.143
8.083
4021.097
850.383
0.955
0.864
-1.880
-6.407

70.0

11109
0.232
0.232
109.800
14.806
7.449
4025.817
783.717
0.956
0.895
-1.834
-6.929

80.0

11109
-3.341
-3.341
109.800
15.021
7.108
4029.967
747.814
0.957
0.925
-1.793
-7.250

90.0

11109
N/A
N/A
109.800
14.778
7.000
4033.849
736.453
0.958
0.954
-1.754
-7.360

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 56 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

GZ m
LCF from zero pt. (+ve fwd) m
TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

-0.003
-1.751
0.000
0.0
0.0

10.0

4.142
-1.777
1.086
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

6.403
-1.745
2.375
20.0
0.0

30.0

6.207
-1.745
2.852
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)

40.0

5.402
-1.745
3.243
40.0
0.0

50.0

4.310
-1.745
3.534
50.0
0.0
Value

60.0

70.0

3.037
-1.745
3.719
60.0
0.0
Units

1.649
-1.745
3.790
70.0
0.0
Actual

80.0

0.199
-1.745
3.746
80.0
0.0
Status

90.0

-1.261
-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
81.4
deg
0.0550 m.rad 2.4570

Pass

+4367.33

Pass
0.0

deg

0.0

40.0
n/a
81.4
0.0900

deg
40.0
deg
deg
m.rad 3.4731

Pass

+3758.96

Pass
30.0

deg

30.0

40.0
n/a
81.4
0.0300

deg
40.0
deg
deg
m.rad 1.0160

Pass

+3286.77

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 57 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013
Code

Criteria

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

Value

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs

Units

Actual

Status

Margin
%

Pass
30.0

deg

30.0

90.0
23.6
0.200

deg
deg
m

90.0

deg

30.0

6.207

Pass

+3003.26

3.1.2.4: Initial GMt


spec. heel angle
shall not be less than (>=)

0.0
0.150

deg
m

Pass
23.615

Pass

+15643.62

3.1.2.3: Angle of maximum GZ


shall not be less than (>=)

15.0

deg

23.6

Pass
Pass

+57.58

3.10 Loadcase Stage 9_ 60.26m from stern barge


Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)

Quantity

1
1
1
66.62%
0%
0%
57.44%

Sounding
m

4.784
0.000
0.000
4.174

Unit Mass
tonne

3347.010
200.000
936.980
538.095
542.198
542.198
538.095

Total Mass
tonne

3347.010
200.000
936.980
358.500
0.000
0.000
309.070

Long.Arm
m

0.378
0.000
-6.940
-49.210
-49.308
-49.308
-49.164

Trans.Arm
m

0.001
0.000
0.670
-11.958
-4.000
4.000
11.951

Vert.Arm
m

3.574
7.500
16.760
2.537
3.633
3.633
2.226

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 1 (P)


Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)
Void space 4 (S)
Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)
Void space 5 (S)
Void space 6 (P)
Void space 6 (CP)
Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 58 of 61
Date: 03.10.2013

Quantity

23.35%
0%
0%
23.35%
62.18%
0%
0%
62.18%
23.35%
98.76%
98.76%
23.35%
0%
98.76%
98.76%
0%
0%
0%
0%
0%
37.4%
16.64%
16.64%
37.4%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

1.673
0.000
0.000
1.673
4.371
0.000
0.000
4.371
1.673
6.913
6.913
1.673
0.000
6.913
6.913
0.000
0.000
0.000
0.000
0.000
2.650
1.165
1.165
2.650
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.146
810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

187.770
0.000
0.000
187.770
500.000
0.000
0.000
500.000
187.770
800.000
800.000
187.770
0.000
800.000
800.000
0.000
0.000
0.000
0.000
0.000
300.740
134.810
134.810
300.740
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000

Long.Arm
m

-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300
6.300
20.700
20.700
20.700
20.700
35.099
35.099
35.099
35.099
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842

Trans.Arm
m

-11.885
-4.000
4.000
11.885
-11.957
-4.000
4.000
11.957
-11.885
-4.000
4.000
11.885
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973
-11.928
-4.000
4.000
11.928
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943

Vert.Arm
m

0.853
3.500
3.500
0.853
2.208
3.500
3.500
2.208
0.853
3.457
3.457
0.853
3.523
3.457
3.457
3.523
3.523
3.500
3.500
3.523
1.345
0.583
0.583
1.345
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089

Unit FSM
tonne.m

Total FSM
tonne.m

629.760
0.000
0.000
629.760
629.760
0.000
0.000
629.760
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
629.760
629.760
629.760
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Date: 03.10.2013
Quantity

Sounding
m

Unit Mass
tonne

Total Loadcase
FS correction
VCG fluid
10

Page 59 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE


Total Mass
tonne

Long.Arm
m

11333.740 -2.970

Trans.Arm
m

0.003

Vert.Arm
m

Unit FSM
tonne.m

4.121
0.681
4.802

Total FSM
tonne.m

FSM Type

7714.516

3.1.2.4: Initial GMt GM at 0.0 deg = 23.220 m

8
Max GZ = 6.391 m at 22.6 deg.

GZ m

-2

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2

30

0.0

11334
3.446
3.446
106.544
3.446
32.000
4044.322
3406.814

40
50
Heel to Starboard deg.

10.0

11334
3.413
3.413
109.800
5.983
32.227
4035.180
3405.568

20.0

11334
3.252
3.252
109.800
8.220
20.467
4040.576
2153.245

60

70

30.0

11334
3.055
3.055
109.800
10.195
14.000
4063.036
1472.907

80

40.0

11334
2.813
2.813
109.800
11.861
10.890
4074.987
1145.718

90

50.0

11334
2.486
2.486
109.800
13.276
9.138
4082.787
961.371

60.0

11334
1.987
1.987
109.800
14.400
8.083
4088.577
850.383

70.0

11334
1.048
1.048
109.800
15.086
7.449
4093.297
783.717

80.0

11334
-1.656
-1.656
109.800
15.313
7.108
4097.447
747.814

90.0

11334
N/A
N/A
109.800
15.075
7.000
4101.329
736.453

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 60 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m
VCB from DWL m
GZ m
LCF from zero pt. (+ve fwd) m
TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

0.948
0.941
-3.386
-1.677
-0.003
-1.668
0.000
0.0
0.0

10.0

0.929
0.522
-2.913
-2.020
4.075
-1.738
1.064
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

0.943
0.599
-2.343
-2.902
6.309
-1.745
2.096
20.0
0.0

30.0

0.948
0.706
-2.125
-3.945
6.120
-1.745
2.595
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of

40.0

0.951
0.780
-2.010
-4.939
5.334
-1.745
3.015
40.0
0.0

50.0

0.953
0.830
-1.934
-5.816
4.265
-1.745
3.343
50.0
0.0
Value

60.0

70.0

0.955
0.865
-1.878
-6.535
3.018
-1.745
3.570
60.0
0.0
Units

0.956
0.896
-1.832
-7.068
1.656
-1.745
3.688
70.0
0.0
Actual

80.0

0.957
0.925
-1.792
-7.396
0.233
-1.745
3.695
80.0
0.0
Status

90.0

0.958
0.954
-1.754
-7.508
-1.201
-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
81.6
deg
0.0550 m.rad 2.4199

Pass

+4299.86

Pass
0.0

deg

0.0

40.0
n/a
81.6
0.0900

deg
40.0
deg
deg
m.rad 3.4224

Pass
Pass

30.0

deg

30.0

+3702.62

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 61 of 61
Date: 03.10.2013

Code

Criteria

spec. heel angle


first downflooding angle
angle of vanishing stability
shall not be less than (>=)
A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs

Value

40.0
n/a
81.6
0.0300

Units

Actual

deg
40.0
deg
deg
m.rad 1.0024

Status

Pass

Margin
%

+3241.45

Pass
30.0

deg

30.0

90.0
23.6
0.200

deg
deg
m

90.0

deg

30.0

6.120

Pass

+2959.82

3.1.2.4: Initial GMt


spec. heel angle
shall not be less than (>=)

0.0
0.150

deg
m

Pass
23.220

Pass

+15380.3

3.1.2.3: Angle of maximum GZ


shall not be less than (>=)

15.0

deg

23.6

Pass
Pass

+57.58

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 62 of 61
Date: 03.10.2013

3.11 Loadcase : Contigency plan


These calculations are for bad condition (for example: stage 3_ 12.08 m) trailer system fail or something make it can not move; In this case we
manage to pump in as following calculation and fix the system. Time maximum for remaining is before 13:38 (so we have 240 mins for fixing) to
continue trailer load out to barge.
If the system is repaired after 13:38 am, the trailer will be pulled back and wait suitable tidal on the next day.

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Damage Case - Intact

Fixed Trim = 0 m (+ve by stern)


Relative Density (specific gravity) = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name

Lightship
Miscellaneous
Load on barge
Aft. Tank(P)
Aft. Tank(CP)
Aft.Tank(SP)
Aft.Tank(S)
Void space 1 (P)
Void space 1 (CP)
Void space 1 (SP)
Void space 1 (S)
Void space 2 (P)
Void space 2 (CP)
Void space 2 (SP)
Void space 2 (S)
Void space 3 (P)
Void space 3 (CP)
Void space 3 (SP)
Void space 3 (S)
Void space 4 (P)
Void space 4 (CP)
Void space 4 (SP)
Void space 4 (S)
Void space 5 (P)
Void space 5 (CP)
Void space 5 (SP)
Void space 5 (S)
Void space 6 (P)

Page 63 of 61

Quantity

1
1
1
83.63%
0%
0%
83.63%
87.05%
0%
0%
87.05%
99.48%
0%
0%
99.48%
99.48%
98.76%
98.76%
99.48%
99.48%
98.76%
98.76%
99.48%
22.38%
0%
0%
22.38%
74.61%

Sounding
m

5.913
0.000
0.000
5.913
6.100
0.000
0.000
6.100
6.964
0.000
0.000
6.964
6.964
6.913
6.913
6.964
6.964
6.913
6.913
6.964
1.606
0.000
0.000
1.606
5.236

Unit Mass
tonne

3347.010
200.000
549.670
538.095
542.198
542.198
538.095
804.170
810.029
810.029
804.170
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.171
810.029
810.029
804.171
804.146

Total Mass
tonne

3347.010
200.000
549.670
450.000
0.000
0.000
450.000
700.000
0.000
0.000
700.000
800.000
0.000
0.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
800.000
180.000
0.000
0.000
180.000
600.000

Long.Arm
m

0.378
0.000
-49.390
-49.269
-49.308
-49.308
-49.269
-36.900
-36.900
-36.900
-36.900
-22.500
-22.500
-22.500
-22.500
-8.100
-8.100
-8.100
-8.100
6.300
6.300
6.300
6.300
20.700
20.700
20.700
20.700
35.100

Trans.Arm
m

0.001
0.000
0.680
-11.966
-4.000
4.000
11.966
-11.969
-4.000
4.000
11.969
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973
-11.973
-4.000
4.000
11.973
-11.880
-4.000
4.000
11.880
-11.964

Vert.Arm
m

3.574
7.500
16.760
3.108
3.633
3.633
3.108
3.073
3.500
3.500
3.073
3.505
3.500
3.500
3.505
3.505
3.457
3.457
3.505
3.505
3.457
3.457
3.505
0.819
3.500
3.500
0.819
2.641

Unit FSM
tonne.m

0.000
0.000
0.000

Total FSM
tonne.m

0.000
0.000
0.000
472.298
0.000
0.000
472.298
629.760
0.000
0.000
629.760
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
629.760
0.000
0.000
629.760
629.760

FSM Type

User Specified
User Specified
User Specified
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0
Item Name

Void space 6 (CP)


Void space 6 (SP)
Void space 6 (S)
Void space 7 (P)
Void space 7 (CP)
Void space 7 (SP)
Void space 7 (S)
F.P. Tank(P)
F.P. Tank(CP)
F.P. Tank(SP)
F.P. Tank(S)
Total Loadcase
FS correction
VCG fluid

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 64 of 61
Date: 03.10.2013

Quantity

98.76%
98.76%
74.61%
68.53%
0%
0%
68.53%
0%
0%
0%
0%

Sounding
m

6.914
6.914
5.236
5.095
0.006
0.006
5.095
1.926
1.926
1.926
1.926

Unit Mass
tonne

810.005
810.005
804.146
262.648
265.006
265.006
262.648
210.069
213.307
213.307
210.069

Total Mass
tonne

800.000
800.000
600.000
180.000
0.000
0.000
180.000
0.000
0.000
0.000
0.000
17916.680

Long.Arm
m

35.100
35.100
35.100
44.778
44.850
44.850
44.778
50.842
50.848
50.848
50.842
-2.333

Trans.Arm
m

-4.000
4.000
11.964
-11.952
-4.000
4.000
11.952
-11.943
-4.000
4.000
11.943
0.021

Vert.Arm
m

3.457
3.457
2.641
2.974
3.917
3.917
2.974
5.089
5.067
5.067
5.089
3.780
0.290
4.070

Unit FSM
tonne.m

Total FSM
tonne.m

0.000
0.000
629.760
236.160
0.000
0.000
236.160
0.000
0.000
0.000
0.000
5195.476

FSM Type

Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum
Maximum

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 65 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

4.5 3.1.2.4: Initial GMt GM at 0.0 deg = 15.804 m


4
3.5
Max GZ = 2.964 m at 17.5 deg.

GZ m

3
2.5
2
1.5
1
0.5
0
-0.5

10

20

Heel to Starboard degrees

Displacement tonne
Draft at FP m
Draft at AP m
WL Length m
Immersed Depth m
WL Beam m
Wetted Area m^2
Waterpl. Area m^2
Prismatic Coeff.
Block Coeff.
LCB from zero pt. (+ve fwd) m
VCB from DWL m

30

0.0

17917
5.293
5.293
109.800
5.293
32.000
4625.036
3513.245
0.944
0.940
-2.355
-2.567

40
50
Heel to Starboard deg.

10.0

17917
5.423
5.423
109.800
7.963
25.328
5279.846
2746.642
0.946
0.789
-2.276
-2.908

20.0

17916
6.471
6.471
109.800
11.245
18.377
5888.691
1952.221
0.949
0.770
-2.111
-4.311

60

70

30.0

17917
8.090
8.090
109.800
14.556
15.534
6043.674
1472.907
0.952
0.781
-1.986
-6.055

80

40.0

17917
10.130
10.130
109.800
17.466
13.619
6055.624
1145.718
0.954
0.837
-1.912
-7.700

90

50.0

17917
12.879
12.879
109.800
19.957
12.156
6063.425
961.371
0.955
0.873
-1.864
-9.132

60.0

17917
17.092
17.092
109.800
21.952
10.823
6069.214
850.383
0.956
0.897
-1.829
-10.299

70.0

17917
25.008
25.008
109.800
23.280
9.503
6073.934
783.717
0.957
0.918
-1.800
-11.160

80.0

17917
47.802
47.802
109.800
23.901
8.160
6078.084
747.814
0.957
0.937
-1.774
-11.689

90.0

17917
N/A
N/A
109.800
23.796
7.000
6081.966
736.453
0.958
0.956
-1.750
-11.868

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

Page 66 of 61

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Date: 03.10.2013

Heel to Starboard degrees

GZ m
LCF from zero pt. (+ve fwd) m
TCF to zero pt. m
Max deck inclination deg
Trim angle (+ve by stern) deg

0.0

-0.021
-0.006
0.000
0.0
0.0

10.0

2.370
-0.662
-2.532
10.0
0.0

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

20.0

2.932
-1.503
-5.243
20.0
0.0

30.0

2.905
-1.745
-4.957
30.0
0.0
Criteria

3.1.2.1: Area 0 to 30
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 0 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)
3.1.2.1: Area 30 to 40
from the greater of
spec. heel angle
to the lesser of
spec. heel angle
first downflooding angle
angle of vanishing stability
shall not be less than (>=)

40.0

2.577
-1.745
-3.665
40.0
0.0

50.0

2.094
-1.745
-2.262
50.0
0.0
Value

60.0

70.0

1.516
-1.745
-0.790
60.0
0.0
Units

0.878
-1.745
0.706
70.0
0.0
Actual

80.0

0.207
-1.745
2.180
80.0
0.0
Status

90.0

-0.474
-1.745
3.589
90.0
N/A
Margin
%

Pass
0.0

deg

0.0

30.0
deg
30.0
83.0
deg
0.0550 m.rad 1.2207

Pass

+2119.51

Pass
0.0

deg

0.0

40.0
n/a
83.0
0.0900

deg
40.0
deg
deg
m.rad 1.7027

Pass

+1791.91

Pass
30.0

deg

30.0

40.0
n/a
83.0
0.0300

deg
40.0
deg
deg
m.rad 0.4820

Pass

+1506.63

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Page 67 of 61
Date: 03.10.2013

Code

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

A.749(18) Ch3 - Design criteria applicable to all ships

Criteria

3.1.2.2: Max GZ at 30 or greater


in the range from the greater of
spec. heel angle
to the lesser of
spec. heel angle
angle of max. GZ
shall not be less than (>=)
Intermediate values
angle at which this GZ occurs

Value

Units

Actual

Status

Margin
%

Pass
30.0

deg

30.0

90.0
24.5
0.200

deg
deg
m

90.0

deg

30.0

2.905

Pass

+1352.31

3.1.2.4: Initial GMt


spec. heel angle
shall not be less than (>=)

0.0
0.150

deg
m

Pass
15.804

Pass

+10435.91

3.1.2.3: Angle of maximum GZ


shall not be less than (>=)

15.0

deg

24.5

Pass
Pass

+63.64

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

4. SUMMARY FOR LOAD OUT :

*************************************************************************
*
****** AUTO F.A.B_Ver 2.0 ******
*
*
Summary table for load out
*
*************************************************************************
SUMMARY FOR LOAD OUT ON 06-10-2013
-----------------------------------------------------------------------TIME TANK NAME
BALLAST
PUMPING
PUMP ULLAGE
TON
IN/OUT
m3/h
m
-----------------------------------------------------------------------Pre-ballast condition
Aft. Tank(P)
350.00
2.608
Aft. Tank(CP)
0.00
7.000
Aft.Tank(SP)
0.00
7.000
Aft.Tank(S)
350.00
2.608
Void space 1 (P)
0.00
7.000
Void space 1 (CP)
0.00
7.000
Void space 1 (SP)
0.00
7.000
Void space 1 (S)
0.00
7.000
Void space 2 (P)
500.00
2.629
Void space 2 (CP)
0.00
7.000
Void space 2 (SP)
0.00
7.000
Void space 2 (S)
500.00
2.629
Void space 3 (P)
0.00
7.000
Void space 3 (CP)
800.00
0.087
Void space 3 (SP)
800.00
0.087
Void space 3 (S)
0.00
7.000
Void space 4 (P)
0.00
7.000
Void space 4 (CP)
800.00
0.087
Void space 4 (SP)
800.00
0.087
Void space 4 (S)
0.00
7.000
Void space 5 (P)
0.00
7.000
Void space 5 (CP)
0.00
7.000
Void space 5 (SP)
0.00
7.000
Void space 5 (S)
0.00
7.000
Void space 6 (P)
125.00
5.868

Page 68 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Void space 6 (CP)


0.00
7.000
Void space 6 (SP)
0.00
7.000
Void space 6 (S)
125.00
5.868
Void space 7 (P)
180.00
1.905
Void space 7 (CP)
0.00
7.000
Void space 7 (SP)
0.00
7.000
Void space 7 (S)
180.00
1.905
F.P. Tank(P)
0.00
7.000
F.P. Tank(CP)
0.00
7.000
F.P. Tank(SP)
0.00
7.000
F.P. Tank(S)
0.00
7.000
-----------------------------------------------------------------------Draft
2.789 m

Page 69 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Stage 1:0 m from barge's egde


-----------------------------------------------------------------------TIME TANK NAME
BALLAST
PUMPING
PUMP ULLAGE
8
TON
IN/OUT
m3/h
m
-----------------------------------------------------------------------Aft. Tank(P)
337.35
-12.65
95
2.754
Aft. Tank(CP)
0.00
Aft.Tank(SP)
0.00
Aft.Tank(S)
330.02
-19.98
150
2.838
Void space 1 (P)
0.00
Void space 1 (CP)
0.00
Void space 1 (SP)
0.00
Void space 1 (S)
0.00
Void space 2 (P)
500.00
Void space 2 (CP)
0.00
Void space 2 (SP)
0.00
Void space 2 (S)
500.00
Void space 3 (P)
0.00
Void space 3 (CP)
800.00
Void space 3 (SP)
800.00
Void space 3 (S)
0.00
Void space 4 (P)
0.00
Void space 4 (CP)
800.00
Void space 4 (SP)
800.00
Void space 4 (S)
0.00
Void space 5 (P)
0.00
Void space 5 (CP)
0.00
Void space 5 (SP)
0.00
Void space 5 (S)
0.00
Void space 6 (P)
164.95
39.95
300
5.523
Void space 6 (CP)
19.98
19.98
150
6.827
Void space 6 (SP)
19.98
19.98
150
6.827
Void space 6 (S)
164.95
39.95
300
5.523
Void space 7 (P)
180.00
-

Page 70 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Void space 7 (CP)


0.00
Void space 7 (SP)
0.00
Void space 7 (S)
180.00
F.P. Tank(P)
0.00
F.P. Tank(CP)
0.00
F.P. Tank(SP)
0.00
F.P. Tank(S)
0.00
.............................................................
Draft
2.845 m

Page 71 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Stage 2:6.04 m from barge's egde


-----------------------------------------------------------------------TIME TANK NAME
BALLAST
PUMPING
PUMP ULLAGE
16
TON
IN/OUT
m3/h
m
-----------------------------------------------------------------------Aft. Tank(P)
312.67
-24.67
93
3.038
Aft. Tank(CP)
0.00
Aft.Tank(SP)
0.00
Aft.Tank(S)
291.06
-38.96
146
3.287
Void space 1 (P)
0.00
Void space 1 (CP)
0.00
Void space 1 (SP)
0.00
Void space 1 (S)
0.00
Void space 2 (P)
500.00
Void space 2 (CP)
0.00
Void space 2 (SP)
0.00
Void space 2 (S)
500.00
Void space 3 (P)
0.00
Void space 3 (CP)
800.00
Void space 3 (SP)
800.00
Void space 3 (S)
0.00
Void space 4 (P)
0.00
Void space 4 (CP)
800.00
Void space 4 (SP)
800.00
Void space 4 (S)
0.00
Void space 5 (P)
0.00
Void space 5 (CP)
0.00
Void space 5 (SP)
0.00
Void space 5 (S)
0.00
Void space 6 (P)
242.87
77.92
292
4.850
Void space 6 (CP)
58.94
38.96
146
6.490
Void space 6 (SP)
58.94
38.96
146
6.490
Void space 6 (S)
242.87
77.92
292
4.850
Void space 7 (P)
180.00
-

Page 72 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Void space 7 (CP)


0.00
Void space 7 (SP)
0.00
Void space 7 (S)
180.00
F.P. Tank(P)
0.00
F.P. Tank(CP)
0.00
F.P. Tank(SP)
0.00
F.P. Tank(S)
0.00
.............................................................
Draft
2.959 m

Page 73 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Stage 3:12.08 m from barge's egde


-----------------------------------------------------------------------TIME TANK NAME
BALLAST
PUMPING
PUMP ULLAGE
14
TON
IN/OUT
m3/h
m
-----------------------------------------------------------------------Aft. Tank(P)
290.92
-21.76
93
3.289
Aft. Tank(CP)
0.00
Aft.Tank(SP)
0.00
Aft.Tank(S)
256.71
-34.36
147
3.683
Void space 1 (P)
0.00
Void space 1 (CP)
0.00
Void space 1 (SP)
0.00
Void space 1 (S)
0.00
Void space 2 (P)
500.00
Void space 2 (CP)
0.00
Void space 2 (SP)
0.00
Void space 2 (S)
500.00
Void space 3 (P)
0.00
Void space 3 (CP)
800.00
Void space 3 (SP)
800.00
Void space 3 (S)
0.00
Void space 4 (P)
0.00
Void space 4 (CP)
800.00
Void space 4 (SP)
800.00
Void space 4 (S)
0.00
Void space 5 (P)
0.00
Void space 5 (CP)
0.00
Void space 5 (SP)
0.00
Void space 5 (S)
0.00
Void space 6 (P)
311.58
68.71
294
4.257
Void space 6 (CP)
93.29
34.36
147
6.194
Void space 6 (SP)
93.29
34.36
147
6.194
Void space 6 (S)
311.58
68.71
294
4.257
Void space 7 (P)
180.00
-

Page 74 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Void space 7 (CP)


0.00
Void space 7 (SP)
0.00
Void space 7 (S)
180.00
F.P. Tank(P)
0.00
F.P. Tank(CP)
0.00
F.P. Tank(SP)
0.00
F.P. Tank(S)
0.00
.............................................................
Draft
3.066 m

Page 75 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Stage 4:18.12 m from barge's egde


-----------------------------------------------------------------------TIME TANK NAME
BALLAST
PUMPING
PUMP ULLAGE
11
TON
IN/OUT
m3/h
m
-----------------------------------------------------------------------Aft. Tank(P)
275.06
-15.85
86
3.471
Aft. Tank(CP)
0.00
Aft.Tank(SP)
0.00
Aft.Tank(S)
231.68
-25.03
137
3.971
Void space 1 (P)
0.00
Void space 1 (CP)
0.00
Void space 1 (SP)
0.00
Void space 1 (S)
0.00
Void space 2 (P)
500.00
Void space 2 (CP)
0.00
Void space 2 (SP)
0.00
Void space 2 (S)
500.00
Void space 3 (P)
0.00
Void space 3 (CP)
800.00
Void space 3 (SP)
800.00
Void space 3 (S)
0.00
Void space 4 (P)
0.00
Void space 4 (CP)
800.00
Void space 4 (SP)
800.00
Void space 4 (S)
0.00
Void space 5 (P)
0.00
Void space 5 (CP)
0.00
Void space 5 (SP)
0.00
Void space 5 (S)
0.00
Void space 6 (P)
361.65
50.06
273
3.824
Void space 6 (CP)
118.32
25.03
137
5.977
Void space 6 (SP)
118.32
25.03
137
5.977
Void space 6 (S)
361.65
50.06
273
3.824
Void space 7 (P)
180.00
-

Page 76 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Void space 7 (CP)


0.00
Void space 7 (SP)
0.00
Void space 7 (S)
180.00
F.P. Tank(P)
0.00
F.P. Tank(CP)
0.00
F.P. Tank(SP)
0.00
F.P. Tank(S)
0.00
.............................................................
Draft
3.154 m

Page 77 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Stage 5:24.16 m from barge's egde


-----------------------------------------------------------------------TIME TANK NAME
BALLAST
PUMPING
PUMP ULLAGE
7
TON
IN/OUT
m3/h
m
-----------------------------------------------------------------------Aft. Tank(P)
264.62
-10.44
90
3.592
Aft. Tank(CP)
0.00
Aft.Tank(SP)
0.00
Aft.Tank(S)
215.19
-16.49
141
4.161
Void space 1 (P)
0.00
Void space 1 (CP)
0.00
Void space 1 (SP)
0.00
Void space 1 (S)
0.00
Void space 2 (P)
500.00
Void space 2 (CP)
0.00
Void space 2 (SP)
0.00
Void space 2 (S)
500.00
Void space 3 (P)
0.00
Void space 3 (CP)
800.00
Void space 3 (SP)
800.00
Void space 3 (S)
0.00
Void space 4 (P)
0.00
Void space 4 (CP)
800.00
Void space 4 (SP)
800.00
Void space 4 (S)
0.00
Void space 5 (P)
0.00
Void space 5 (CP)
0.00
Void space 5 (SP)
0.00
Void space 5 (S)
0.00
Void space 6 (P)
394.62
32.98
283
3.539
Void space 6 (CP)
134.81
16.49
141
5.835
Void space 6 (SP)
134.81
16.49
141
5.835
Void space 6 (S)
394.62
32.98
283
3.539
Void space 7 (P)
180.00
-

Page 78 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Void space 7 (CP)


0.00
Void space 7 (SP)
0.00
Void space 7 (S)
180.00
F.P. Tank(P)
0.00
F.P. Tank(CP)
0.00
F.P. Tank(SP)
0.00
F.P. Tank(S)
0.00
.............................................................
Draft
3.225 m

Page 79 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Change longitudinal moment here--------------------Stage 6:30.2 m from barge's egde


-----------------------------------------------------------------------TIME TANK NAME
BALLAST
PUMPING
PUMP ULLAGE
6
TON
IN/OUT
m3/h
m
-----------------------------------------------------------------------Aft. Tank(P)
277.71
13.09
131
3.441
Aft. Tank(CP)
0.00
Aft.Tank(SP)
0.00
Aft.Tank(S)
228.28
13.09
131
4.010
Void space 1 (P)
26.18
26.18
262
6.750
Void space 1 (CP)
0.00
Void space 1 (SP)
0.00
Void space 1 (S)
26.18
26.18
262
6.750
Void space 2 (P)
500.00
Void space 2 (CP)
0.00
Void space 2 (SP)
0.00
Void space 2 (S)
500.00
Void space 3 (P)
26.18
26.18
262
6.750
Void space 3 (CP)
800.00
Void space 3 (SP)
800.00
Void space 3 (S)
26.18
26.18
262
6.750
Void space 4 (P)
0.00
Void space 4 (CP)
800.00
Void space 4 (SP)
800.00
Void space 4 (S)
0.00
Void space 5 (P)
0.00
Void space 5 (CP)
0.00
Void space 5 (SP)
0.00
Void space 5 (S)
0.00
Void space 6 (P)
381.53
-13.09
131
3.652
Void space 6 (CP)
134.81
Void space 6 (SP)
134.81
Void space 6 (S)
381.53
-13.09
131
3.652

Page 80 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Void space 7 (P)


180.00
Void space 7 (CP)
0.00
Void space 7 (SP)
0.00
Void space 7 (S)
180.00
F.P. Tank(P)
0.00
F.P. Tank(CP)
0.00
F.P. Tank(SP)
0.00
F.P. Tank(S)
0.00
.............................................................
Draft
3.260 m

Page 81 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Stage 7:36.24 m from barge's egde


-----------------------------------------------------------------------TIME TANK NAME
BALLAST
PUMPING
PUMP ULLAGE
7
TON
IN/OUT
m3/h
m
-----------------------------------------------------------------------Aft. Tank(P)
293.94
16.23
139
3.254
Aft. Tank(CP)
0.00
Aft.Tank(SP)
0.00
Aft.Tank(S)
244.51
16.23
139
3.823
Void space 1 (P)
58.65
32.47
278
6.450
Void space 1 (CP)
0.00
Void space 1 (SP)
0.00
Void space 1 (S)
58.65
32.47
278
6.450
Void space 2 (P)
500.00
Void space 2 (CP)
0.00
Void space 2 (SP)
0.00
Void space 2 (S)
500.00
Void space 3 (P)
58.65
32.47
278
6.450
Void space 3 (CP)
800.00
Void space 3 (SP)
800.00
Void space 3 (S)
58.65
32.47
278
6.450
Void space 4 (P)
0.00
Void space 4 (CP)
800.00
Void space 4 (SP)
800.00
Void space 4 (S)
0.00
Void space 5 (P)
0.00
Void space 5 (CP)
0.00
Void space 5 (SP)
0.00
Void space 5 (S)
0.00
Void space 6 (P)
365.30
-16.23
139
3.792
Void space 6 (CP)
134.81
Void space 6 (SP)
134.81
Void space 6 (S)
365.30
-16.23
139
3.792
Void space 7 (P)
180.00
-

Page 82 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Void space 7 (CP)


0.00
Void space 7 (SP)
0.00
Void space 7 (S)
180.00
F.P. Tank(P)
0.00
F.P. Tank(CP)
0.00
F.P. Tank(SP)
0.00
F.P. Tank(S)
0.00
.............................................................
Draft
3.298 m

Page 83 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Stage 8:49.83 m from barge's egde


-----------------------------------------------------------------------TIME TANK NAME
BALLAST
PUMPING
PUMP ULLAGE
15
TON
IN/OUT
m3/h
m
-----------------------------------------------------------------------Aft. Tank(P)
330.47
36.53
146
2.833
Aft. Tank(CP)
0.00
Aft.Tank(SP)
0.00
Aft.Tank(S)
281.04
36.53
146
3.402
Void space 1 (P)
131.70
73.06
292
5.810
Void space 1 (CP)
0.00
Void space 1 (SP)
0.00
Void space 1 (S)
131.70
73.06
292
5.810
Void space 2 (P)
500.00
Void space 2 (CP)
0.00
Void space 2 (SP)
0.00
Void space 2 (S)
500.00
Void space 3 (P)
131.70
73.06
292
5.810
Void space 3 (CP)
800.00
Void space 3 (SP)
800.00
Void space 3 (S)
131.70
73.06
292
5.810
Void space 4 (P)
0.00
Void space 4 (CP)
800.00
Void space 4 (SP)
800.00
Void space 4 (S)
0.00
Void space 5 (P)
0.00
Void space 5 (CP)
0.00
Void space 5 (SP)
0.00
Void space 5 (S)
0.00
Void space 6 (P)
328.77
-36.53
146
4.108
Void space 6 (CP)
134.81
Void space 6 (SP)
134.81
Void space 6 (S)
328.77
-36.53
146
4.108
Void space 7 (P)
180.00
-

Page 84 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Void space 7 (CP)


0.00
Void space 7 (SP)
0.00
Void space 7 (S)
180.00
F.P. Tank(P)
0.00
F.P. Tank(CP)
0.00
F.P. Tank(SP)
0.00
F.P. Tank(S)
0.00
.............................................................
Draft
3.382 m

Page 85 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Stage 9:60.26 m from barge's egde


-----------------------------------------------------------------------TIME TANK NAME
BALLAST
PUMPING
PUMP ULLAGE
12
TON
IN/OUT
m3/h
m
-----------------------------------------------------------------------Aft. Tank(P)
358.50
28.03
140
2.510
Aft. Tank(CP)
0.00
Aft.Tank(SP)
0.00
Aft.Tank(S)
309.07
28.03
140
3.079
Void space 1 (P)
187.77
56.07
280
5.327
Void space 1 (CP)
0.00
Void space 1 (SP)
0.00
Void space 1 (S)
187.77
56.07
280
5.327
Void space 2 (P)
500.00
Void space 2 (CP)
0.00
Void space 2 (SP)
0.00
Void space 2 (S)
500.00
Void space 3 (P)
187.77
56.07
280
5.327
Void space 3 (CP)
800.00
Void space 3 (SP)
800.00
Void space 3 (S)
187.77
56.07
280
5.327
Void space 4 (P)
0.00
Void space 4 (CP)
800.00
Void space 4 (SP)
800.00
Void space 4 (S)
0.00
Void space 5 (P)
0.00
Void space 5 (CP)
0.00
Void space 5 (SP)
0.00
Void space 5 (S)
0.00
Void space 6 (P)
300.74
-28.03
140
4.350
Void space 6 (CP)
134.81
Void space 6 (SP)
134.81
Void space 6 (S)
300.74
-28.03
140
4.350
Void space 7 (P)
180.00
-

Page 86 of 61
Date: 03.10.2013

STV EXTENSION PLAN STV NORTH EAST


Document No.:
2012-1491-6R-0008
Revision No.: 0

BALLAST CALCULATION FOR LOAD OUT TOPSIDE SVNE

Void space 7 (CP)


0.00
Void space 7 (SP)
0.00
Void space 7 (S)
180.00
F.P. Tank(P)
0.00
F.P. Tank(CP)
0.00
F.P. Tank(SP)
0.00
F.P. Tank(S)
0.00
.............................................................
Draft
3.446 m
Total time for loading:96 minutes.

Page 87 of 61
Date: 03.10.2013

Das könnte Ihnen auch gefallen