TOLERANCE FOR PIPING FABRICATION

DOC NO : SC-PF-001

APPLICABLE SPECIFICATION : 5578-E3-SP-PU-00019

MISMATCH OF PIPE

DATE : 16th MAR 2011

MAX. ROOT GAP

TOLERANCES FOR PIPE


FABRICATION
DOC NO. : SC-PF-0002

APPLICABLE SPEC : 5578-E3-SP-PU-00019

DATE : 16th-MAR-2011

FIT-UP METHOD FOR LONGITUDINAL SEAM PIPE

D =Min 30

TOLERANCES FOR PIPE


FABRICATION
DOC NO. : SC-PF-0003

APPLICABLE SPEC : 5578-E3-SP-PU-00019

LINEAR TOLERANCES
LENGTH

DATE : 16th-MAR-2011

TOLERANCES FOR PIPE


FABRICATION
DOC NO. : SC-PF-0004

APPLICABLE SPEC : 5578-E3-SP-PU-00019

DATE : 16th-MAR-2011

REDUCED WALL THICKNESS BY GRINDING

MAX 10%
Origin
Thickness
MIN 90%

STANDARDS FOR PIPE


FABRICATION
DOC NO. : SC-SPF-0001 APPLICABLE SPEC : 5578-E3-SP-PU-00015

DATE : 23th-MAR-2011

STANDARD FOR PIPE FIT-UP


25mm

BEVEL
FACE

- Any Contamination Shall Be


Avoided such as Paint, Rust,
Scale and Oil which Effect to
Weld Metals

MIN.
30mm

-Appearance isnt
Consideration
-Used Temporary Taps
Shall be same
Material as Base Metal

- For Restriction
Prevention the Deformation
Melting the sound metal
The Arc stability

STANDARDS FOR PIPE


FABRICATION
DOC NO. : SC-PW-0001

APPLICABLE SPEC : 5578-E3-SP-PU-00015

DATE : 19th-MAR-2011

INSPECTION ACCEPTANCE CRITERIA FOR WELDS


ANY LOCATION

ANY TYPES

RESULT IS

ZERO
ZERO
REJECT

1. LACK OF SIDE WALL FUSION


2. LACK OF INTER-RUN FUSION
3. LACK OF ROOT FUSION

1
2

3
4

4. INCOMPLETE PENETRATION
IMPROPER WEAVING WITH
CONTAMINATION OF BEVEL FACE
RESULT IS

REJECT

STANDARDS FOR PIPE


FABRICATION
DOC NO. : SC-PW-0002

APPLICABLE SPEC : 5578-E3-SP-PU-00015

DATE : 19th-MAR-2011

INSPECTION ACCEPTANCE CRITERIA FOR WELDS


DEFECTS IS

UNDERCUT

EXCESSIVE TRAVAL SPEED


Amp & Volt
Too Large Arc Length

ACCEPTABLE VALUE LIMITS


Undercut 1mm or T/4
DEFECTS IS SURFACE POROSITY

LOSS OF SHIELDING GAS


CONTAMINATION OF SURFACE
TOO LARGE ARC LENGTH
DAMP OF ELECTRODES or CONSUMABLE
WET PARENT MATERIAL
RESULT IS

REJECT if welds is less than 5mm

STANDARDS FOR PIPE


FABRICATION
DOC NO. : SC-PW-0003

APPLICABLE SPEC : 5578-E3-SP-PU-00015

DATE : 19th-MAR-2011

INSPECTION ACCEPTANCE CRITERIA FOR WELDS

DEFECTS IS

UNDERFILL

INSUFFICIENT WELD METAL


IRREGULAR WELD BEAD SURFACE
ACCEPTABLE VALUE LIMITS

DEFECTS IS

ROOT CONCAVITY

ROOT FACE TOO LARGE ROOT GAP TOO SMALL


IMCOMPLETE ROOT MELTING
EXCESSIVE ROOT BLENDING
EXCESSIVE BACK PURGE PRESSURE DURING GTAW
WELDING PROCESS

Weld Metal Shall be Above as thickness of Joint

STANDARDS FOR PIPE


FABRICATION
DOC NO. : SC-PW-0004

APPLICABLE SPEC : 5578-E3-SP-PU-00015

DATE : 19th-MAR-2011

INSPECTION ACCEPTANCE CRITERIA FOR WELDS


Caused by
Prevention
Damp Fluxes/Corroded Electrode for SMAW
Use dried electrodes in good condition
Grease/Hydrocarbon/Water contamination of Bevel
Face or Melting Face
Clean prepared surface
Air Entrapment in Gas Shield
(GMAW, FACW and GTAW)
Check hose connection
Too High an Arc voltage or Arc Length
Check The WPS and Increase Voltage and Arc length
Gas Evolution from Priming paints/Surface Treatment
Identify risk of reaction before surface treatment is
applied
Too High of a Shielding Gas Flow Rate which results in
turbulence (GMAW, FACW and GTAW)
Reduce gas flow rate

STANDARDS FOR PIPE


FABRICATION
DOC NO. : SC-PW-0005

APPLICABLE SPEC : 5578-E3-SP-PU-00015

DATE : 22th-MAR-2011

INSPECTION ACCEPTANCE CRITERIA FOR WELDS


Caused by
Prevention
Excessively thick root face, insufficient root gap or
failure to cut back to sound metal in a
back gouging operation
Improve Back gouging technique and ensure the
edge preparation is as per approved WPS
Low heat input
Increase welding current and/or arc voltage;
Decrease travel speed
Excessive inductance in GMAW dip transfer welding,
pool flooding ahead of arc
Improve electrical settings and possibly switch to
spray arc transfer
SMAW electrode too large (Low current density)
Reduce electrode size
Use of vertical down hill welding
Switch to vertical up hill procedure

STANDARDS FOR PIPE


FABRICATION
DOC NO. : SC-PW-0005

APPLICABLE SPEC : 5578-E3-SP-PU-00015

DATE : 22th-MAR-2011

TERMS AND DEFINITION


WELDING
TOE

WELD
METAL
HAZ

CONCAVITY
WELD TOE
CONVEXITY
`

FUSION LINE

BEVEL FACE

ROOT FACE

SIZE AND
LEG

ROOT TOE

ROOT OPENING

FOR GROOVE WELD

ROOT OPENING

SIZE AND LEG

FOR FILLET WELD

STANDARDS FOR PIPE


FABRICATION
DOC NO. : SC-PW-0005

APPLICABLE SPEC : 5578-E3-SP-PU-00015

DATE : 22th-MAR-2011

For GTAW+FCAW PROCESS


1. CHECK!! WPS
2. Shall Perform!! as per WPS

Root & Hot Pass


shall be made
by GTAW

Normal Carbon Only!

HOT
ROOT

FCAW

STANDARDS FOR PIPE


FABRICATION
DOC NO. : SC-PW-0005

APPLICABLE SPEC : 5578-E3-SP-PU-00015

For GMAW+FCAW PROCESS

DATE : 22th-MAR-2011