SIMHADRI
LIST OF CONTENTS
1. PLANT DETAILS
2. TESTING OBJECTIVES
3. TESTING PROPOSALS
4. SERVICES REQUIRED
5. SAFETY PRECAUTIONS
6. EMERGENCY PROCEDURES
7. STATE OF THE PLANT
8. COMMISSIONING PROCEDURE
9. COMPLETION CRITERIA
10. APPENDICES
SHEET 1 OF 19
STATION: NTPC
SIMHADRI
SHEET 2 OF 19
1. PLANT DETAILS:
THIS SYSTEM CONSISTS OF OLCS,CLCS AND OTHER INTERFACE SYSTEM PANELS.
Each panel consists of Power supply module, Processor, Local Bus modules, Input and output modules (Analog and
Digital),Intra plant modules ,diagnostic modules and Interface modules either all or except one or two.
Sl. No.
modules
Cross reference
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Binary Input
Analog Input
Binary output
Analog output
Drive control
Processor for text output
Intra plant bus Access
Intra plant Bus coupler
IPB Coupler with address input
IPB Cable Power Supply
IPB cable input
IPB Traffic Director
Bus access
Bus circuit board
Bus coupler serial Interface
Bus isolation
Bus end
Cable for local bus extension
IPB Bus coupling
Bus traffic Director for extended Add range
Power supply
DC/DC convertor
Processor
IS between IPB & PC-AT
Diagnostic/SOE
70EBXX
70EAXX
70ABXX
70AAXX
70AS04/06
70KS01
70FA01
70FK01
XV7713
XV7715
XV7717/8
70FV01
70BA02
70BL01
70BK03
70BT01
70BA02
70BL03
70BK02
70BV05
XT37Y
KH370
70 PR 05
PC421
70SK3Z
MAKE:ELECTRONICS DIVISION,BHEL,BANGALORE
STATION: NTPC
SIMHADRI
SHEET 3 OF 19
SYSTEM DESCRIPTION:
a) OLCS(CRB)Panels
These panels are used for operating single Drive in
open loop control system mode. In this outputs are not
controlled but monitored. Feedbacks, commands and other
parameters for drive are monitored through MMI. There are
22 such modules for NTPC Simhadri; CRB 01 to 22.
b) CLCS(CRA) Panels
These panels are used for operating Single drive in
CLCS mode i.e. the output is controlled by taking a
fraction of output as a controlling input to the system.
There are 15 such closed loop control system panels in NTPC
simhadri site. They are labeled as CRA 01 to 15.
c) IS Panels
These panels are used for interfacing IPB with PC-AT.
There are such 6 modules in NTPC simhadri site; labeled as
CRC 01 to 06.
STATION: NTPC
SIMHADRI
SHEET 4 OF 19
2.TESTING OBJECTIVE:
TO TEST THE DDCMIS PANELS AND TO MAKE THEM READY FOR SERVICE.
STATION: NTPC
SIMHADRI
SHEET 5 OF 19
3.TESTING PROPOSAL:
i)
STATION: NTPC
SIMHADRI
4.SERVICES REQUIRED:
500 V DC MEGGER
230 V 1 PHASE 50 Hz AC SUPPLY
24V DC SUPPLY
DIGITAL MULTIMETER
SHEET 6 OF 19
STATION: NTPC
SIMHADRI
SHEET 7 OF 19
PERSONNEL :
5.3.1
5.3.2
5.3.3
5.2
PLANT :
5.2.1
WHILE
INSERTING
MODULES
IN
DDCMIS,
ENSURE
THAT
ENSURE
THAT
WHILE
MEASUREMENTS/OBSERVATIONS
CARRYING
OF
THE
POWER
OUT
SUPPLIES,
THE
NO
STATION: NTPC
SIMHADRI
SHEET 8 OF 19
5.2.3
5.2.4
THIS PURPOSE.
5.2.5
VARIOUS
ELECTRONIC
MODULES
NEED
CERTAIN
JUMPERS
TO
CASES,
TESTING.
FEW
THIS
RESISTORS
INFORMATION
ARE
IS
TO
BE
GIVEN
IN
MOUNTED
BE
IN
BEFORE
RELEVANT
TEST
THAT
RESISTORS
ALL
SUCH
LINKS
AND
ARE
MOUNTED
BEFORE
CONDUCTING TESTS.
5.2.6
ZERO
POTENTIAL
AND
EARTH
POTENTIAL
SHOULD
HAVE
BEEN
5.2.8
BEFORE
CONDUCTING
TESTS
ON
ELECTRONIC
MODULE,
CHECK
ALTERNATIVELY IT WOULD BE
STATION: NTPC
SIMHADRI
SHEET 9 OF 19
6. EMERGENCY PROCEDURE:
6.1
6.2
6.3
6.4
STATION: NTPC
SIMHADRI
SHEET 10 OF 19
STATION: NTPC
SIMHADRI
SHEET 11 OF 19
8.COMMISSIONING PROCEDURE:
i)
ii)
STATION: NTPC
SIMHADRI
SHEET 12 OF 19
iv)
INPUT MODULES
v)OUTPUT MODULES
a) ALARM SIGNAL SHOULD NOT APPEAR IN HEALTHY STATE
b)
a)
STATION: NTPC
SIMHADRI
SHEET 13 OF 19
b)
c)
d)
e)
f)
g)
h)
i)
j)
IS PROPERLY TERMINATED
STATION: NTPC
SIMHADRI
SHEET 14 OF 19
b)
c)
d)
e)
f)
g)
h)
vi)
COMMUNICATION MODULE
a)
b)
c)
STATION: NTPC
SIMHADRI
SHEET 15 OF 19
d)
e)
f)
g)
h)
i)
j)
STATION: NTPC
SIMHADRI
SHEET 16 OF 19
b)
c)
d)
e)
f)
g)
h)
STATION: NTPC
SIMHADRI
SHEET 17 OF 19
i)
j)
k)
l)
x)FIELD CONNECTIONS
a)
b)
xi)FLAME SCANNER
a) ENSURE THAT PROPER JUMPER SELECTIONS ARE MADE IN THE
POWER SUPPLY MODULE BEFORE PUTTING INTO SERVICE.
b) DO NOT REMOVE OR INSERT ANY MODULE UNDER POWER-ON
CONDITION
STATION: NTPC
SIMHADRI
SHEET 18 OF 19
9.COMPLETION CRITERIA:
DDCMIS IS COMMISSIONED. ALL PARAMETERS AS PER SCHEME ARE
MONITORED & CONTROLLED FROM OPERATING STATIONS. SEQUENCE OF EVENTS IN
CASE OF TRIP ON FAULT, CHANGEOVER, PROCESS CHANGES AND
STARTING/STOPPING OF MAIN EQUIPMENTS ARE FOUND AVAILABLE IN THE
WORKSTATION MONITORS. CHANGEOVER OF PROCESSORS, IP BUS LINES ARE
FOUND OK WHEN FAULT OCCURS
STATION: NTPC
SIMHADRI
SHEET 19 OF 19
10. APPENDICES:
DRAWINGS:
EARTHING PRACTICE
- ED 046 28 02/REV 01
( 19 SHEETS)