Sie sind auf Seite 1von 113
HOW TO LSE KNITTING MACHNE Pt egy ate ae 8 i eh ete ee fl ‘el, SETTING UP KNITTING MACHINE . 1-2. REPLACING KNITTING MACHINE IN CARRYING CASE ,. PREPARATION OF YARN... THREADING THE YARN TENSION UNIT. NEEDLE POSITION . = NAME OF PARTS.,...K CARRIAGE ....., SH. PLAIN KNITTING 2.0... ccccceeee 32, HOW TO REMOVE THE KNITTING FROM THE MACHINE ... 33, HOW TO CAST ON WITH A FINISHED EDGE... .......00.. 334. Hand method... 0.2... 332. Latchtool....-. ove 9.3.9. Using the Weaving pattern lever and 1/1 Needle pusher... .. 4-1, WHEN YOU CANNOT CAST ON 41-4, When the needles do not catch the yarn . - is oak 28 4:2. WHEN THE K CARRIAGE IS HARD TO PUSH ......2..0.22005- - 28 43. IF THE K GARRIAGE SHOULD JAM ooo. oc c.cecccee ec ceeeeeeseeeeeee eee 2D “LESSON, 2 5-1. PUNCH CARD 52. RELATION BETWEEN THE PUNCH CARD AND THE NEEDLES ..... HOWTO CHANGE THE SELECTION GUIDE FOR END NEEDLE.......0...... 5.3. PREPARATION FOR PATTERN KNITTING . Setting the Punch card 2.2... so vev vets 53-2. Preparation for patter knitting... ++ 5.4, TUCK STITCH PATTERNS, SKIP STITCH PATTERNS... 55. TWO COLOR TUCK STITCH PATTERNS ‘TWO COLOR SKIP STITCH PATTERNS ... 56. FAIR-ISLE PATTERNS .. 6-7. FAIR-ISLE MOTIF . 57-1, How to connect the Motif knitting earn 57-2. Preparation for Feir-isle Motif and How to knit. 57.3. Double Fair.isle mot 88. DOUBLE LENGTH PATTERNS ........ 56-1. Preparation for Double length patterns -...-....0. ese 58:2. When knitting Normal and Double length patterns mixed .... 58, WEAVING PATTERNS 0.000.000. ccceeceeeeseeeneeetes 5-10. PLATING YARN KNITTING ..... ce 5-11, INTARSIA KNITTING ........ 5:12, HOW TO DESIGN OWN CARDS eaEEaRS } IEYOU MAKE MISTAKES IN PATTERN KNITTING USING THE PUNCH CARDS HOW TO CORRECT THEM ...,,...... G11. Ifthe K carriage should jam vise ssecessevevensees 62. |F YOU MAKE MISTAKES ON KNITTING DOUBLE LENGTH PATTERNS HOW TO CORRECT THEM -...... aes TA. LAGE PATTERN KNITTING 50.0.0. 7-2, HOW TO SET THE L CARRIAGE 78. 7.3. LACE PATTERN KNITTING. FINE-LACE PATTERN KNITTING . 278 7-4, WHEN KNITTING LACE AND FINE-LACE PATTERN MIXED 77 7-5. HOW TO USE THE L-POINT CAM oo. 00000000 ccceseeeeees 78 B41, IF THE L CARRIAGE SHOULD JAM 8.2. UNRAVELLING THE KNITTING ..... “LESSON 3 [simanna a ganment as 9-1. HOW TO USE THE TRANSFER TOOL AND THE LATCH TOOL ... B1-1, Transfer tool... 91-2. Latch tool 226... 02. INCREASING AND DECREASING STITCHES PICKING UP DROPPED STITCHES 8-2-4, Increasing stitches 2.6. cec ec cee ec ceee eee cess 9241-1 Ineeaing or stitch at either edge of the kiti Simple method =... ..-- + ee-- 0:2:1-2, Inereasing one stitch at either edge ofthe kn Full fashioned method 57-5 leaning several tiches at ether ie ofthe elt. -.-. R BB 288 BRB 92-2. Decreasing stitches . se Haaw (12-2: Dra si cle air ge Kg ‘Simple method 9222: Dncreasing one sich at either edge of the kitting, Full fashioned mathod =... =... 022, Darang ver ches at thereof he kiting 92.3. Picking up dropped stitches . 8:21. Repairing dropped stitch zi 2:52, Repairing siteh that the dropped several rows. - 93. HOW TO MAKE A HEM 83-1. Plainhem ...e..c cee 93-2. Picothem .... 93-3. 1x1 Elastic hem 04. BINDING OFF AND BUTTON HOLE . 8.44. Binding ff using the taptary reece 4-1-1, When the yor lan the ites 8-4:1.2, When the yar isan the right sido 94-2. Castoff using the latch tool . 94-3. Vertical seeming of plain stitch 9.4.4. How tomakea button hole ........ 9.5. HOW TO SHAPE A ROUND NECK LINE . 85-1, Using the holding cam lever 251-1, Phin kiting «+5 945-12, Pattern Knitting ,« 95-2. Using the easton thread (Lace Pattern knitting) 96, SEWING PROCEDURE .. ebaceiientioes 9-8-1. Baste the knitting with binding wire and/or basting thread 962. Sewing procedure 288 07. CLEANING AND MAINTENANCE eiesuewe 87-1. Replacing a need aCe 2 i 9.7.2. Cleaning and maintenance . ee : er) 10-1. PARTIAL KNITTING (PLAIN KNITTING & PATTERN KNITTING) . 10-1-1, Decreasing stitches . . severe 109 101.2, Increasing stitches ana shee 110 "1 102, PARTIAL KNITTING (LACE PATTERN KNITTING). 10-2-1, Decreasing stitches . 10-2-2. Increasing stitches . 103, TUBE KNITTING ........ 4 see: wld 112 “LESSON 1 41, SETTING UP KNITTING MACHINE tent | | Facs the machine on a firm tabi, with the CARRYING Unlock the CATCHES on either side of handle CASE HANDLE away from you ft the UPPER CASE slightly, and pull toward you to ‘lew the lid ay Take the two TABLE CLAMPS ut of the accessory box ro TABLE CLAMPS. Fasten the machina to the table by tightening the TABLE CLAMP SCREW, C- < Ramove the RON COUNTER from the carrying case, 1) Push the ROW COUNTER toward you. 2) Lift it up to remove, < ea MTT ~ ‘Set-the ROW COUNTER up on the two STUDS at the emer of the machina 1) Set the ROW COUNTER onto the swo STUDS i 2) Push it away trom you Pull the CARRIAGE HANDLE up towards you Prose down the SPRING and remove it from the HOOK. Remove the SINKER PLATE ASSEMBLY from the carrying cove Setting up the SINKER PLATE ASSEMBLY on the K 2) Be gure to tighten the knobs s0 the SINKER PLATE CARRIAGE, ASSEMBLY will fit sacurely, 1) Lossen the KNOBS and insert the SINKER PLATE ASSEMBLY under the knots Flemove the YARN TENSION UNIT from the carrying case “Takei out of the carrying casein the order of A, Band C. YARN TENSION UNIT. Setting the VARIN TENSION UNIT. 1 Turning FRONT GUIDE ARM foward in the de: Hor of the arrow, 2) Turn back the TAKE-UP SPRINGS as far as they wit ‘ou AR REARYARN OUIDE 23) Fae the REAR APN GUIDE until itis perpen dicular to the rod 4) Insert the end of the FIOD into the hola for this put pose at the center of the machin. ‘The REAR YARN GUIDE should lean hackwards Remove the EXTENSIGN FAILS from the carrying case’ 1), Insert EXTENSION FIAILS into the hotes (A and 8) -and set them up an both sides af the machine av the both sides of the machine, 1 2 a a . 7 @ Paton orn feeds 17 208) Yate wa po8) Srace I pox! “Tapestry neat 1 9.) ‘Spare ose =) point cam or #-rasaie © = boi eam for needs (6 ea) ane brah 1 ee! Ott oe) Cate threat 11 eee Punch ear note in AT ed (crochet nau 1 poe) Lt ton (1 0) 152 Tranter tool (Fee6 19.3 Tater tal (peed 243 Tanatr Wal bo8) —10- 17 neat ster (1p “Tableclongs 2 bes! 38 Claw weights Bea! BD Mali Aniting corn M (2p) 1. Gnepoint cx (poe 2 Mori aniving cam LF (8 enc 112. REPLACING KNITTING MACHINE IN CARRYING CASE Femove the EXTENSION RAILS (ift up and pul). Roplace the L CARRIAGE in theeatrying ese Replace the EXTENSION RAILS in the carrying coe, FRonrauiog Toning ae an sa, Pull up the YARN TENSION UNIT — 1) FRONT GUIDE ARM, 2) TAKE-UP SPRING to ramove Fold up the YARN TENSION UNIT in order as shown in thi figures, “Ais mean vann out 3) REAR YARN GUIDE. YARN TENSION UNIT. 1) Pca the hea of YARN TENSION UNIT tthe 2) Sethe YARN ROD onB postion, ook @ asthawn sore, & 3) Set the VARN AOD and TAKE-UP SPRINGS on ——Loosan the KNOBS and remove the SINKER PLATE position ASSEMBLY fees the F caer ioge =12- 1) Fiaplece it on the corresponding drawing in the:carry= ing ease Remow the ROW COUNTER fram the mactine and replace tin the carrying cose 1) The figures on your ROW COUNTER can be moved © zero by luming the dials cording 10 the arrows Etacting with the dial st the leit Stew cower 2 i 2) Pull the ROW COUNTER toward you and left itup 2) Set the SPRING 104 position 3) Set the ROW COUNTER oma the nwa studs in the catrying cate and push it away From you, Foid down the CARRIAGE HANDLE Insort the CARRIAGE LOCK in the hole at te let expe (of the machine and lock the CARRIAGE. == Feplace the other secessorias in the aocessory box and laze it, Push ll neodles back to position A iz i Pr gs 7 ¢ eat oS [a a Lock the twa CATCHES on elther side of the handle sti-

Das könnte Ihnen auch gefallen