CALCULO DEL FLETE (LA OROYA - PACCHA)


PROYECTO: CONSTRUCCION DE RESERVORIO PARA AGUA POTABLE SHINCA MACHAY, DISTRITO DE PACCHA, PROVINCIA YAULI,
REGION JUNIN
LUGAR

: SHINCA MACHAY

DISTRITO

PROVINCIA : YAULI

PACCHA

DEPARTAMENTO : JUNIN

1.- DATOS GENERALES


A.- POR PESO (KG)
MATERIAL

UND

CANTIDAD

ALAMBRE NEGRO # 08
CLAVOS PARA MADERA CON CABEZA DE 2 1/2"
CLAVOS PARA MADERA CON CABEZA DE 2"
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
CEMENTO PORTLAND TIPO I (42.5 kg)
TAPA METALICA DE 0.50 X 0.50 DE E = 1/16"
YESO DE 25 Kg
PEGAMENTO PLASTICO PARA PVC CCP
MADERA NACIONAL P/ENCOFRADO MONTAA
CUARTONES 2" X 2" X 10 MADERA TORNILLO
HOJA DE SIERRA SANDFLEX
CORDEL
WINCHA DE 50 M
LIJA PARA FIERRO
ESTACA DE MADERA MONTAA
PINTURA ESMALTE SINTETICO
TUBERIA HDPE DE 110 MM SDR PN 10
TUBERIA PVC SAP UF C-7.5 10" X 5 m
TUBERIA PVC SAP UF C-7.5 8" X 5 m
TUBERIA PVC SAP UF C-7.5 4" X 5 m
CODO PVC SAP C-7.5 DE 4" X 90
CODO PVC SAP C-7.5 DE 4" X 45
CODO PVC SAP C-7.5 DE 4" X 22.5
THINER ESTNDAR
EXPLOSIVOS Y ACCESORIOS
CINTA TEFLON

KG
KG
KG
KG
BLS
UND
BLS
GLN
P2
UND
UND
ML
UND
UND
P2
GLN
ML
ML
ML
ML
UND
UND
UND
GLN
GLB
UND

52.9376
8.3878
6.9696
208.7102
152.4950
8.0000
6.0000
1.0514
126.9600
26.0681
3.1714
925.3975
11.0899
4.9380
121.9463
1.7200
150.3600
45.0000
25.0000
3,326.2400
8.0000
24.0000
32.0000
2.0036
1.0000
17.5000

LIJA PARA MADERA


UNION MIXTA HDPE DE 110 MM A PVC SAP DE 4"
UNION HDPE DE 110 MM
LUBRICANTE PARA TUBERIAS
SELLADOR DE METALES
TEE PVC SAP C-7.5 DE 4" CON REDUCCION A 2"
TEE PVC SAP C-7.5 DE 4"
UNION UNIVERSAL F G DE 4"

UND
UND
UND
GLN
GLN
UND
UND
UND

4.3500
7.5180
8.0000
12.4000
0.7127
2.0000
5.0000
10.0000

UNION UNIVERSAL F G DE 2"


ADAPTADOR PVC SAP DE 4"
ADAPTADOR PVC SAP DE 2"
NIPLE DE F G DE 4 X 10 CM
NIPLE DE F G DE 2 X 7.5 CM
CABLE DE ACERO CON ALMA DE FIBRA DE 1/2"
CABLE CON ALMA DE FIBRA DE 3/8" TIPO BOA
CARRO DE DILATACION C/PLANCHA 1/16" Y PERNOS DE SUJECION
VARILLA DE ANCLAJE DE 1/2" x 2.5 M
GRILLETES DE F G DE 3/8"
GRILLETES DE SEGURIDAD DE 15 x 7 CM
ARGOLLA DE 2" C/PLANCHA MET.
PERNO, TUERCA Y ARANDELA DE 3/8" x 2"

UND
UND
UND
UND
UND
ML
ML
UND
UND
UND
UND
UND
UND

4.0000
10.0000
4.0000
10.0000
4.0000
133.0000
155.8000
4.0000
4.0000
100.0000
8.0000
20.0000
20.0000

PESO UNT.

TOTAL

1.00

52.94

1.00

8.39

1.00

6.97

1.00

208.71

42.50

6,481.04

5.00

40.00

25.00

150.00

2.00

2.10

1.50

190.44

3.50

91.24

0.02

0.06

0.00

3.70

0.30

3.33

0.04
0.75
2.00

0.20
91.46
3.44

2.80

421.01

1.70

76.50

1.30

32.50

1.10
1.00
1.00

3,658.86
8.00
24.00

1.00

32.00

2.50

5.01

100.00

100.00

0.10

1.75

0.04
1.00
1.00
3.00

0.17
7.52
8.00
37.20

2.00

1.43

0.50
0.50

1.00
2.50

0.10

1.00

0.05

0.20

0.10

1.00

0.05

0.20

0.10
0.05

1.00
0.20

1.00
0.60
0.40
1.00

133.00
93.48
1.60
4.00

0.15

15.00

0.15

1.20

0.08

1.60

0.05

1.00

HA

CALCULO DEL FLETE (LA OROYA - PACCHA)


PROYECTO: CONSTRUCCION DE RESERVORIO PARA AGUA POTABLE SHINCA MACHAY, DISTRITO DE PACCHA, PROVINCIA YAULI,
REGION JUNIN
LUGAR

: SHINCA MACHAY

GANCHO DE SUJECION CON FIERRO CORRUGADO DE 1/2"


VALVULA DE BRONCE DE COMPUERTA DE 4" ITALY
VALVULA DE BRONCE DE COMPUERTA DE 2" ITALY

DISTRITO

UND
UND

45.0000
5.0000

PACCHA

0.60

27.00

1.30

6.50

UND

2.0000

0.60

1.20

TOTAL :

12,040.64

PESO UNT.

TOTAL

1.00
1.00

2.21
19.10

TOTAL :

21.31

PESO UNT.

TOTAL

1.00

0.00

1.00

0.00

TOTAL :

0.00

B.- POR VOLUMEN (M3)


MATERIALES

UND CANTIDAD

ARENA FINA

m3

2.21

HORMIGON

m3

19.10

m3
m3
* LOS AGREGADOS TRANSPORTADOS TIENEN UN COSTO PUESTO EN OBRA.

m3

B.- OTROS
MATERIAL

UND CANTIDAD

ARTICULOS DE FERRETERIA

glb

EQUIPOS Y HERRAMIENTAS

glb

0.00
0.00

2.- FLETE TERRESTRE: TODOS LOS MATERIALES Y ACCESORIOS SERAN TRANSPORTADOS DESDE LA OROYA A PACCHA - SHINCA MACHAY
FLETE POR PESO = Peso Total en kg. X Flete por kg.
FLETE POR VOLUMEN = Vol. Total X Costo por m3
UNIDAD DE TRANSPORTE
10.00
10,000.00
1,495.00
750.00
0.150

CAPACIDAD DE CAMION (M3)


CAPACIDAD DE CAMION (KG)
COSTO VIAJE POR PESO SIN I.G.V.
COSTO VIAJE VOLUMEN
FLETE POR KG

75.00

FLETE POR M3
CALCULO DEL FLETE
TIPO
POR PESO
POR VOLUMEN
OTROS

TOTAL PESO

S/./KG

12,040.64

0.150
75.00

1,800.00
0.00

0.00

0.150

0.00

COSTO DE FLETE TOTAL S/.

TOTAL S/.

1,800.00

CALCULO DEL FLETE RURAL - PACCHA


2.- DATOS GENERALES
TRASLADO DE MATERIALES DEL ALMACEN A PIE DE OBRA (DISTANCIA APROXIMADA = 0.60 KM).
MATERIAL

UND

CANTIDAD

PESO UNT.

TOTAL

CEMENTO PORTLAND TIPO I (42.5KG)

KG

152.50

42.50

6,481.25

FIERRO CORRUGADO PROMEDIO

KG

208.71

1.00

208.71

MADERA PARA ENCOFRADO

KG

281.68

1.00

281.68

TUBERIAS DE 10", 8", 4"

KG

4,188.86

1.00

4,188.86

AGREGADOS: ARENA FINA, HORMIGON, ARENA GRUESA, GRAVA

KG

21.31

1,000.00

21,310.00

TOTAL :

32,470.50

COSTO POR KG: S/. 0.0369567/KG

COSTO DE FLETE TOTAL S/.