Beruflich Dokumente
Kultur Dokumente
: SHINCA MACHAY
DISTRITO
PROVINCIA : YAULI
PACCHA
DEPARTAMENTO : JUNIN
UND
CANTIDAD
ALAMBRE NEGRO # 08
CLAVOS PARA MADERA CON CABEZA DE 2 1/2"
CLAVOS PARA MADERA CON CABEZA DE 2"
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
CEMENTO PORTLAND TIPO I (42.5 kg)
TAPA METALICA DE 0.50 X 0.50 DE E = 1/16"
YESO DE 25 Kg
PEGAMENTO PLASTICO PARA PVC CCP
MADERA NACIONAL P/ENCOFRADO MONTAA
CUARTONES 2" X 2" X 10 MADERA TORNILLO
HOJA DE SIERRA SANDFLEX
CORDEL
WINCHA DE 50 M
LIJA PARA FIERRO
ESTACA DE MADERA MONTAA
PINTURA ESMALTE SINTETICO
TUBERIA HDPE DE 110 MM SDR PN 10
TUBERIA PVC SAP UF C-7.5 10" X 5 m
TUBERIA PVC SAP UF C-7.5 8" X 5 m
TUBERIA PVC SAP UF C-7.5 4" X 5 m
CODO PVC SAP C-7.5 DE 4" X 90
CODO PVC SAP C-7.5 DE 4" X 45
CODO PVC SAP C-7.5 DE 4" X 22.5
THINER ESTNDAR
EXPLOSIVOS Y ACCESORIOS
CINTA TEFLON
KG
KG
KG
KG
BLS
UND
BLS
GLN
P2
UND
UND
ML
UND
UND
P2
GLN
ML
ML
ML
ML
UND
UND
UND
GLN
GLB
UND
52.9376
8.3878
6.9696
208.7102
152.4950
8.0000
6.0000
1.0514
126.9600
26.0681
3.1714
925.3975
11.0899
4.9380
121.9463
1.7200
150.3600
45.0000
25.0000
3,326.2400
8.0000
24.0000
32.0000
2.0036
1.0000
17.5000
UND
UND
UND
GLN
GLN
UND
UND
UND
4.3500
7.5180
8.0000
12.4000
0.7127
2.0000
5.0000
10.0000
UND
UND
UND
UND
UND
ML
ML
UND
UND
UND
UND
UND
UND
4.0000
10.0000
4.0000
10.0000
4.0000
133.0000
155.8000
4.0000
4.0000
100.0000
8.0000
20.0000
20.0000
PESO UNT.
TOTAL
1.00
52.94
1.00
8.39
1.00
6.97
1.00
208.71
42.50
6,481.04
5.00
40.00
25.00
150.00
2.00
2.10
1.50
190.44
3.50
91.24
0.02
0.06
0.00
3.70
0.30
3.33
0.04
0.75
2.00
0.20
91.46
3.44
2.80
421.01
1.70
76.50
1.30
32.50
1.10
1.00
1.00
3,658.86
8.00
24.00
1.00
32.00
2.50
5.01
100.00
100.00
0.10
1.75
0.04
1.00
1.00
3.00
0.17
7.52
8.00
37.20
2.00
1.43
0.50
0.50
1.00
2.50
0.10
1.00
0.05
0.20
0.10
1.00
0.05
0.20
0.10
0.05
1.00
0.20
1.00
0.60
0.40
1.00
133.00
93.48
1.60
4.00
0.15
15.00
0.15
1.20
0.08
1.60
0.05
1.00
HA
: SHINCA MACHAY
DISTRITO
UND
UND
45.0000
5.0000
PACCHA
0.60
27.00
1.30
6.50
UND
2.0000
0.60
1.20
TOTAL :
12,040.64
PESO UNT.
TOTAL
1.00
1.00
2.21
19.10
TOTAL :
21.31
PESO UNT.
TOTAL
1.00
0.00
1.00
0.00
TOTAL :
0.00
UND CANTIDAD
ARENA FINA
m3
2.21
HORMIGON
m3
19.10
m3
m3
* LOS AGREGADOS TRANSPORTADOS TIENEN UN COSTO PUESTO EN OBRA.
m3
B.- OTROS
MATERIAL
UND CANTIDAD
ARTICULOS DE FERRETERIA
glb
EQUIPOS Y HERRAMIENTAS
glb
0.00
0.00
2.- FLETE TERRESTRE: TODOS LOS MATERIALES Y ACCESORIOS SERAN TRANSPORTADOS DESDE LA OROYA A PACCHA - SHINCA MACHAY
FLETE POR PESO = Peso Total en kg. X Flete por kg.
FLETE POR VOLUMEN = Vol. Total X Costo por m3
UNIDAD DE TRANSPORTE
10.00
10,000.00
1,495.00
750.00
0.150
75.00
FLETE POR M3
CALCULO DEL FLETE
TIPO
POR PESO
POR VOLUMEN
OTROS
TOTAL PESO
S/./KG
12,040.64
0.150
75.00
1,800.00
0.00
0.00
0.150
0.00
TOTAL S/.
1,800.00
UND
CANTIDAD
PESO UNT.
TOTAL
KG
152.50
42.50
6,481.25
KG
208.71
1.00
208.71
KG
281.68
1.00
281.68
KG
4,188.86
1.00
4,188.86
KG
21.31
1,000.00
21,310.00
TOTAL :
32,470.50
1,200.00