Sie sind auf Seite 1von 2

Time Study Sheet

Operation : Loop Attach (1)


Operator Name: Zain-ul-abedin

Machine Name: Loop Attach M/C


PF allowance : 14%

Operator Code : 10-TE-12


Operator Sign: Zain-ul-abedin

M.D Allowance: 5%

Elements of motion
Pick up &
Position
0.17
0.18
0.19
0.17
0.16
0.15
0.19
0.17
0.18
0.17

Cycle#
1
2
3
4
5
6
7
8
9
10

0.21
0.22
0.23
0.2
0.22
0.23
0.24
0.21
0.21
0.22

Reposition &
Seam 2
0.32
0.33
0.34
0.35
0.32
0.34
0.33
0.35
0.34
0.36

Cut Thread &


Dispose Time
0
0
0
0
0
0
0
0
0
0

Seam 1

BH Time
0.0076
0.007
0.006
0.006
0.0067
0.0057
0.006
0.0067
0.0064
0.0065

Total

1.73

2.19

3.38

0.0646

Average/10

0.17

0.22

0.34

0.01

Basic Time:

0.14

0.18

0.27

0.01

Time Study Officer Sign:

I.E Incharge Sign:


PF Time =

Total M.D Time =

Comments:

SAM =

I have Calculate This sheet From the given


formulas:HT Time= Pickup+cut & Dispose+BHT

PF time=PF*HT

NT=Seam1+Seam2/10

M.D Time=MD Allowance*NT

Basic Time=Avg/10*M/C Rating

SAM=Total M.D Time+PF time

me: Loop Attach M/C


lowance : 14%

Allowance: 5%

Total
0.7076
0.737
0.77
0.726
0.7067
0.7257
0.766
0.7367
0.7364
0.7565
7.3646
0.74
0.59

0.16

0.28
0.28

Das könnte Ihnen auch gefallen