Sie sind auf Seite 1von 4

INSPECTION & TEST PLAN

ITP DESCREPTION: PASSIVE FIRE PROTECTION APPLICATION


PROJECT: WHEATSTONE PROJECT LNG PLANT - MODULE FABRICATION YARD
CLIENT: BECHTEL OG&C, BECHTEL INTERNATIONAL INC.
ACTIVITY DESCRPTION
NO
1
Pre Start Activites
1.1
1.2
2

Review client repair procedure to PFP application


Develop Inspection and Test Plan
Material

2.1

Manufacturer Test certificate

2.2

Check Storage temperature of Chartek 7

2.4

Check Valid Shelf Life and Batch Nubmers

ITP NO:

CONTRACT NO:2567-140-HC3-YB00-000

APPLICABLE PROCEDURE

ACCEPTENCE CRITERIA METHOD OF VERIFICATION (See Legend)


DOCUMENT
RML
KHL
BEC

Fire Proofing Repair Procedure

RML/PFP/REP/001

RML/PFP/REP/001

Coating Specfication for


Chartek 7

PFP Manufacturer Test certificate


RML/PFP/REP/001
PFP Manufacturer Test certificate

Inspection Measurement and Test Equipments


Calibration Certificate
Calibration Certificate

3.1
4

Verifing Measuring devices such as


Hygrometer,Steel Temprature and Dft Gauge
Pre Appication Activity

4.1

Verify Damaged coats condition

Coating Specfication for

4.2

Check Steel Temperature,Dew Point & RH

Fire Proofing Repair Procedure

RML/PFP/REP/001

4.3
5

Masking and Covering of Non- PFP areas


PFP Application

Fire Proofing Repair Procedure

RML/PFP/REP/001

5.1

Check Appropirate Equipment for PFP


application and Monitor the Application

Fire Proofing Repair Procedure

RML/PFP/REP/001

Chartek 7

5.2

Ratio Checks

Fire Proofing Repair Procedure


RML/PFP/REP/001
INSPECTION & TEST PLAN
ITP DESCREPTION: PASSIVE FIRE PROTECTION APPLICATION
PROJECT: WHEATSTONE PROJECT LNG PLANT - MODULE FABRICATION YARD
CLIENT: BECHTEL OG&C, BECGTEL INTERNATIONAL INC.

ACTIVITY DESCRPTION
NO
5.3
Meshing

APPLICABLE PROCEDURE
Fire Proofing Repair Procedure

ITP NO:
CONTRACT NO:2567-140-HC3-YB00

ACCEPTENCE CRITERIA METHOD OF VERIFICATION (See Legend)


DOCUMENT
RML
KHL
BEC
RML/PFP/REP/001
H
H
W

CheckRepair are carried out in accordence


5.4
Chartek Repair Procedure
Fire Proofing Repair Procedure
RML/PFP/REP/001
H
H
W
Legend: R-Review, H-Mandatory Hold Point for Inspecction, S- Survelliance
Note: Any/chandes on the ITP due to new Revision of Specfic
limited to that particular activity. Previsouly approved metho
Other activities remain Unaffected.
RM LEOPAD QC Date & Signature

KENCANA Petroleum QC Date & Signature

BECHTEL QC Date & Signature

CHERVON QC

40-HC3-YB00-000

ON (See Legend)

VERIFYING DOC

CHERVON

R
R
R
S

VES/PFP/1ST/001

VES/PFP/1ST/001

VES/PFP/1ST/001

VES/PFP/1ST/001

VES/PFP/1ST/001

VES/PFP/1ST/001

VES/PFP/1ST/001

140-HC3-YB00-

ON (See Legend)

CHERVON
S

VERIFYING DOC
VES/PFP/1ST/001

S
VES/PFP/1ST/001
sion of Specfications, Shall Be
pproved method of Verification on

CHERVON QC Date & Signature