Sie sind auf Seite 1von 1

Ocean Manager Changes

MONTHLY KPI
o KPI Fields (left corner) are very far from the entry fields
(right corner)
MARPOL REPORT
o Plastics garbage quantity should allow two decimal
places
Form 3.1
o For davit launched lifeboats, we must have two entries
Form 1.9
o Separate risk assessments to be done for every risk type
identified
Noon report (Sea)
o Once load port or discharge port is added, we cannot
remove the fields.
Noon report (Port)
o The drop down menu for choosing ports does not include
all ports; we need a means to add a port to the library.
o If Next port is added, no name can be selected.

Das könnte Ihnen auch gefallen