Sie sind auf Seite 1von 15

PRODUCTIVITY RATES

Ite
m

Description

No.

Trade

Unit

MECHANICAL WORKS
1

Exhaust fans

Split Units

Blower

Kitchen Hood

Ducting

Fire Fighting System

Conveying System (Elevator)

Escalator

Others.. Please insert

Mech'l

Helper

Mech'l

Helper

Mech'l

Helper

Mech'l

Helper

Mech'l

Helper

Mech'l

Helper

Mech'l

Helper

Mech'l

Helper

no.
no.
no.
lm.
lm.
lm.
no.
no.

ELECTRICAL WORKS
1

Electrical Conduits and Boxes

Electrical Wiring and Cables

Telephone System

Electrical panel Board

Fire Alarm System

Electrical Devices (Sockets & Switches)

Lighting Fixture

Others.. Please insert

1
1
1
1
1
1
1
1
1
1
1
1
1
1

Electrician
Helper
Electrician
Helper
Electrician
Helper
Electrician
Helper
Electrician
Helper
Electrician
Helper
Electrician
Helper

lm.
lm.
lm.
no.
lm.
no.
no.

9
10
11
12
13
14
15
16
17
18
19
20

PLUMBING WORKS
1

Sewer Piping

Water Closet

Urinal

P. Fitter

Fit. Helper

1
1
1

P. Fitter
Fit. Helper
P. Fitter

mt
no.
no.

8?

Output

Productivity

unit / day

man-days per unit

Urinal

Water Pipe and Fitting

Sanitary Fitting

Mixer

Drains

Toilet Accessories

Water Tank

10

Bath Tub

11

Others.. Please insert

Fit. Helper

1
1

P. Fitter
Fit. Helper

P. Fitter

Fit. Helper

P. Fitter

Fit. Helper

P. Fitter

Fit. Helper

P. Fitter

no.
mt
no.
no.
no.
no.

12

P. Fitter

Fit. Helper

1
1

P. Fitter
Fit. Helper

P. Fitter

1
1

P. Fitter

Fit. Helper

no.
no.
no.
no.

PRODUCTIVITY RATES
Ite
m

Description

No.

Trade

Unit

CONCRETE TROWEL FINISH


1

Screed and concrete finishes with trowel (smooth finish)

Smooth trowel finish to concrete

Leveling the cement-sand screed and finished smoothly


for roofslab waterproofing with material shifting

Mason

Helper

Mason

Helper

sqm
sqm

CEMENT-SAND SCREED
1

Mason

Helper

sqm

TERRAZO TILES
1

Terrazzo tiling with cement mortar and grouting

Terrazzo steps tread with riser

Mason

Helper

Mason

Helper

sqm
LM

CERAMIC TILES
1

Ceramic tile steps treads & risers

Ceramic tile flooring (Grouting Included)

Ceramic wall tile without plaster (Grouting included)

Marble / Granite flooring without design with cutting on


edges

Marble / Granite flooring with design with cutting on edges

Marble granite fixed to walls

Marble / Granite fixed to walls

Marble granite steps / tread & riser

Marble granite skirting to the staircase

Marble thresholds

Black Granite kerb

Marble/Granite wall cladding with fixtures &

Mason

Helper

Mason

Helper

Mason

Helper

LM

sqm
sqm

MARBLE FLOORS / WALLS


1

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

sqm
sqm
sqm
sqm
LM
LM
LM
LM
sqm

PVC VINYL FLOORS / THREADS


1

PVC vinyl flooring sheet fixed with adhesive & welding

Mason

sqm

Output
Qty/day

Productivity
Man-Days per unit

PVC vinyl flooring sheet fixed with adhesive & welding

PVC vinyle floor sheet fixed to wall

PVC vinyle tread & riser fixed with adhesive

Helper

Mason

Helper

Mason

Helper

sqm
LM
LM

PLASTERING
1

Rush coat for plaster work

Fixing level dots for plaster

Plaster internal wall single coat with smooth

Plaster internal walls two coats with smooth

Fixing corner beads to walls & columns

Fixing plaster mesh to walls

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

sqm
sqm
sqm
sqm
LM
sqm

PRODUCTIVITY RATES
Ite
m

Description

No.

Trade

Unit

PLASTERING
7

Plaster to ceiling 16mm thick

External plaster to walls & columns

10

Plaster to circular areas & arches

11

Extra over for plaster above 4m height

Mason

Helper

Mason

Helper

Mason

Helper

sqm
sqm
sqm

Add 15% to above rates for above 4m

EXTERNAL FINISHES
1

Tyrolean finish to external wall

Mason

Helper

sqm

BLOCKWORKS
1

Hollow block work 10 cm thick

Hollow block work 15 cm thick

Hollow block work 20 cm thick

Solid block work 20 cm thick

Solid block work 10 cm thick

Claustra block work 20cm & pointing

Claustra bock work 10cm & pointing

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

Mason

Helper

No
No
No
No
No
sqm
sqm

INTERLOCK TILES
1

60/80MM interlocking tiles including sand bed

Mason

Helper

sqm

KERBSTONE
1

High raised kerbstone with pointing upto 30cm

Flat kerbstone including shifting

Compaction for kerb stone bottom

Base concrete formwork on both sides with

Concreting the base with leveling

Haunch con. On kerbstone backside

Mason

Helper

Mason

Helper

Mason

Helper

Carpenter

Helper

Mason

Helper

Mason

No
No
LM
LM
LM
LM

Output
Qty/day

Productivity
Man-Days per unit

Haunch con. On kerbstone backside

Bituminous painting on kerb stone back side

Helper

Mason

Helper

LM
LM

PROTECTION BOARD
1

Protection board - horizontal

Protection board - vertical

Carpenter

Helper

Mason

Helper

sqm
sqm

FLEXELL SHEET
1

Flexell sheet

Carpenter

Helper

LM

HOURDI BLOCK
1

Hourdi block

Mason

Helper

No

GROOVE ON PLASTER
1

All groove on plaster

Mason

Helper

LM

Resource's Basic Data

Description

quantity

Item NO.

Budget

Materials
unit

Price
/unit

Rate
/unit

Excvtr
Loader
1 Tippers
O.labour
Excvtr-h
Loader
1 Tippers
O.labour

day
day
day
day
day
day
day
day

500
400
150
15
1200
400
150
15

500m3
500m3
100m3
50m2
70m3
250m3
60m3
5m2

Cement
Agg
Sand
1 Water
PCast.Eq
Crp.Crew
PCs.Crew

Ton
m3
m3
m3
m3
day
day

250
30
6
4
14
40
50

0.25
0.8
0.4
0.1125
100m3
5m3
100m3

m3

Steel
Cement
Agg
Sand
1 Water&ad
PCast.Eq
Crp.Crew
Stl.Crew
PCs.Crew

Ton
Ton
m3
m3
m3
m3
day
day
day

1200
250
30
6
5
14
40
35
50

0.1
0.35
0.8
0.4
0.1575
100m3
3m3
.5ton
100m3

m3

Steel
Cement
Agg
Sand
1 Water&ad
PCast.Eq
Crp.Crew
Stl.Crew
PCs.Crew

Ton
Ton
m3
m3
m3
m3
day
day
day

1200
250
30
6
5
14
40
35
50

0.1
0.35
0.8
0.4
0.1575
100m3
1m3
.5ton
100m3

Steel
Cement
Agg
Sand
1 Water&ad
PCast.Eq
Crp.Crew
Stl.Crew
PCs.Crew
Steel
Cement
Agg
Sand
Water&ad
1 Blocks
PCast.Eq
Crp.Crew
Stl.Crew
PCs.Crew

Ton
Ton
m3
m3
m3
m3
day
day
day
Ton
Ton
m3
m3
m3
1000
m3
day
day
day

1200
250
30
6
5
14
40
35
50
1200
250
30
6
5
1200
14
40
35
50

0.1
0.35
0.8
0.4
0.1575
100m3
1.5m3
.5ton
100m3
0.04ton
.05ton
0.11
0.055
.023.5m3
8
100m3
5m3
.5ton
100m3

Bit.Mtrl

m2

1.0m2

day
L.m
day
m2
day

40
10
40
10
40

80m2
1.0L.m
100L.m
1.5
50m2

1000
Ton

180
250

unit

Name

Notes

Excavation

-1

-2

excavation in normal soil

excavation in normal soil

m3

m3

Excvtr =

Excavator

Excvtr-h =

Excavator with hammer

O.labour =

Ordinary labour

P.C For Foundation

-1

P.C for foundation

m3

PCast.Eq =

P.c Cast Equpiment

Crp.Crew =

Carpenter Crews

PCs.Crew = Cast Crews

(batch plant, loader, transmixer,pump)


(1 Carpenter + 1 assistance)

( 2#pump pipe, 1#Concrete distrbuation, 1# leveling)

R.C For Foundation

-1

P.C for Foundation

PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator)


PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator)
StrCrew =

Striker Crews

(1 Craft + 1 assistance)

R.C For Column

-1

P.C for Column

PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator)


PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator)
Stl.Crew =

Steel Crews

(1 Craft + 1 assistance)

R.C For Slabs

-1

-2

RZ.C for Slabs

R.C for Hollow Block Slabs

m3

m2

PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator)


PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator)
Stl.Crew =

Steel Crews

(1 Craft + 1 assistance)

PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator)


PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator)
Stl.Crew =

Steel Crews

(1 Craft + 1 assistance)

Blocks =40*20*20 (Hollow Block Slab as two way , thickness 27cm, rft=140kg/m3 (m3

Insulation
-1

Bitmeen Insulation

m2

-2

Asphalt Insulation

m2

-3

Bathroom Insulation

m2

Bit.Crew
Bit.Mtrl
1
Bit.Crew
Bit.Mtrl
1
Bit.Crew

Bit.Mtrl = Bitmeen Material (2 layers) Bit.Crew = Bitmeen Crews (1 craft, 1 assistance)


Bit.Mtrl = Bitmeen Material

Bit.Crew = Bitmeen Crews (1 craft, 1 assistance)

Bit.Mtrl = Bitmeen Material (2 layers) Bit.Crew =Bitmeen Crews (1craft,1assistance)

Masonary

-1

Masonary Works

m3

Brick
Cement

440 brick
Bricks has dimension = 25*12*6cm
66kg

Cement =300kg/m3

Resource's Basic Data

-1

Description
Masonary Works

unit
m3

quantity

Item NO.

Budget

Materials

Notes

unit

Price
/unit

Rate
/unit

Sand
Bld.Crew

m3
day

6
50

0.22m3
3m3

Cement
Sand
Lime
Pla.Crew
Cement
Sand
Lime
Stone Powder
Pla.Crew
Cement
W.Cement
Sand
Lime
S.P. Pow
S.F Pow
Pla.Crew
Cement
W.Cement
Sand
Lime
S.P. Pow
S.F Pow
Pla.Crew

Ton
m3
m3
day
Ton
m3
m3
m3
day
Ton
Ton
m3
m3
m3
m3
day
Ton
Ton
m3
m3
m3
m3
day

250
6
40
50
250
6
40

50

5.55kg
0.020m3
0.005m3
25m2
5.75kg
0.012m3
0.004m3
0.01m3
20m2
6Kg
3Kg
0.012m4
0.004m4
.007m3
.003m3
15m2
6Kg
3Kg
0.012m4
0.004m4
.007m3
.003m3
15m2

Marble
Cement
1
Sand
Mrb.Crew
Ceramic
Cement
1 Sand
Cer.Crew

m2
Ton
m3
day
m2
Ton
m3
day

400
250
6
50
25
250
6
50

1m2
12.75kg
0.035m3
10m2
1m2
12.75kg
0.035m3
10m2

Marble
Cement
Sand
Mrb.Crew
Ceramic
Cement
Sand
Cer.Crew
Ceramic
Cement
Sand
Cer.Crew
C.Tiles
Cement
Sand
Cer.Crew
Slp.Wood
Ins.Mtrl

m2
Ton
m3
day
m2
Ton
m3
day
m2
Ton
m3
day
m2
Ton
m3
day
m3
m2

400
250
6
50
25
250
6
50
10
250
6
50
8
250
6
45
1000
10

1m2
9kg
0.03m3
10m2
1m2
9kg
0.03m3
10m2
.1m2
1.3kg
0.004m3
10m2
1m2
6kg
0.02m3
25m2
.009m3
.8m2

Flo.Wood
1 Nails

m3
kg

1000
2

.84m3
0.25kg

Sand
Flo.Fnsh
Wod.Crew
Curbes
Cement
1 Sand
Cur.Crew

m3
m2
day
L.m
Ton
m3
day

6
4
40
7
250
6
50

Wod.Crew = Wood Erection Crew (1 craft, 1assistance)


0.08m3
1m2
Flo.Fnsh = Floor Finshing (material &excution)
10m2
1 L.m
Curbes = Cement curbes 12*30*50 with compact sand layer 10cm, mortar 2cm(300kg cem
1kg
0.014m3 Cur.Crew =Curbes Crew (1craft,1assistance,1 labor)
10L.m

Marble

m2

300

0.47m2

Cement

Ton

250

0.33kg

Name

Bld.Crew = Builder crew

(1 builder, 1 assistance, 1 labou

Plaster

-1

Lime Plaster

m2

-2

Facad Scratch Plaster

m2

-3

-4

Artificial Stone Plaster

Cement Stuco Plaster

m2

m2

50
250
600
6
40

50
250
600
6
40

Plaster had 3 layer

1st (300kg cement,1m3 sand)

2ed (200kg for 2 : 1 sand ,lime)


3rd
(200kg for 2 : 1 sand ,lime)
Pla.Crew=plast crew (1craft,1assistance,1labor)
1st
(300kg cement,1m3 sand)
2ed (200kg for 2 : 1 sand ,lime)
3rd
(200kg for 2 : 1 sand ,lime)
4th
(200kg for 2 : 1 sand ,lime)
Pla.Crew=plast crew (1craft,1assistance,1labor)
W.Cement = White Cement
1st (300kg cement,1m3 sand)
2ed (200kg for 2 : 1 sand ,lime)
3rd
(200kg for 2 : 1 sand ,lime)
Pla.Crew=plast crew (1craft,1assistance,1labor)
S.P. Pow = Stone particles Powder
S.F Pow = Stone Fine Powder
1st (300kg cement,1m3 sand)
2ed (200kg for 2 : 1 sand ,lime)
3rd
(200kg for 2 : 1 sand ,lime)
Pla.Crew=plast crew (1craft,1assistance,1labor)
S.P. Pow = Stone particles Powder
S.F Pow = Stone Fine Powder
S.F Pow = Stone Fine Powder

Veneer And Cladding

-1

-2

Marble Skirting 10CM

Ceramic Cladding

m2

m2

Scratch (450 kg cement for 1 m3 sand)


For erection (350 kg cement for 1m3 sand)
Mrb.Crew= Marble crew (1craft,1assistance,1labor)
Scratch (450 kg cement for 1 m3 sand)
For erection (350 kg cement for 1m3 sand)
Cer.Crew=Marble crew (1craft,1assistance,1labor)

Flooring

-1

Marble

m2

-2

Ceramic

m2

-3

Ceramic Skiriting 10 Cm

m2

-4

-5

-6

Tiles 20*20*3

Wood

Curbes

m2

m2

L.M

For erection (300 kg cement for 1m3 sand)


Mrb.Crew= Marble crew (1craft,1assistance,1labor)

For erection (300 kg cement for 1m3 sand)


Cer.Crew=Ceramic crew (1craft,1assistance,1labor)
Scratch (450 kg cement for 1 m3 sand)
For erection (350 kg cement for 1m3 sand)
Cer.Crew=Ceramic crew (1craft,1assistance,1labor)
C.Tiles = Cement Tiles
For erection (300 kg cement for 1m3 sand)
Cer.Crew= Ceramic crew (1craft,1assistance,1labor)
Slp.Wood = Sleepers Wood ( sleeper .4m axial,pieces 1.5m axial)
Ins.Mtrl = Insulation Material & Cost excuation
Flo.Wood = Floor Wood (sewdan For Room 5.2*6. Skirting 10cm)
For erection (300 kg cement for 1m3 sand)

Stairs

-1

Marble

L.M

Marble (for Stair sleeper 0.3width,4cm thick.&stair height 17cm,2cm thick &skirting 10c

Resource's Basic Data

-1

Description
Marble

unit
L.M

-2

Blaustrade

L.M

-3

Handrail

L.M

quantity

Item NO.

Budget

Materials

Notes

Name

unit

Price
/unit

Rate
/unit

Sand
Mrb.Crew
Bla.Mtrl
1
Bla.Erct
Hnd.Mtrl
1
Hnd.Erct

m3
day
kg
kg
L.m
L.m

6
50
3.5
20
15
4

0.03m3
10L.m
30kg
10 L.m
1 L.m
10 L.m

Pan.Mtrl
Pan.Erct

m2
m2

5
25

1m2
1m2

Frm.Mtrl

m3

1000

Frm.Erct

No

Una.Mtrl

BL

1m2

Una.Mtrl = Unit And Acessopries Material

Una.Erct

BL

2.5

10m2

Una.Erct = Unit And Acessopries Erection

Car.Mtrl
Ca.Erct
Fix.Mtrl
Fix.Erct

FL
FL
FL
FL

4000
2500
7000
900

1FL
1FL
1FL
1FL

Car.Mtrl =Carcassing Material (Pipe and fitting )


Car.Erct = Carcassing Erection
Fix.Mtrl =Fixture Material (Appartus&accessories )
Fix.Erct = Fixture Erection

Cre.Mtrl

FL

6500

1FL

Car.Mtrl = Electric Carcassing Material (Pipe and Wire )

Cre.Erct

FL

1500

1FL

Car.Erct = Electric Carcassing Erection

Ute.Mtrl

FL

2000

1FL

Ute.Mtrl=Electric Fixture Material (Units &accessories )

Ute..Erct

FL

700

1FL

Ute.Erct = Electric Fixture Erection

For erection (300 kg cement for 1m3 sand, mortar 3cm thickness)
Mrb.Crew= Marble crew (1craft,1assistance,1 labor)
Bla.Mtrl = Blaustrade Material
Bla.Erct = Blaustrade Erection
Hnd.Mtrl = Handrail Material (Wood & Painting)
Hnd.Erct = Handrail Erection

Painting
-1

Painting

M2

M2

Pan.Mtrl = Painting Material (Oil Painting)


Pan.Erct = Painting Erection

Opening work
-1

-2

Framing

Opening Uits & accessories

M2

0.0021m3 Frm.Mtrl = Framing Material (Wood Frame 1*2.2, width 12.5cm )


10 unit

Frm.Erct = Framing Erection


For one Building (BL= Building)

Plumbing
-1

Sanitry Carcassing

-2

Sanitry Fixture

Fl

Fl

Electric
-1

-2

Electric Carcassing

Electric Fixture

Fl

Rates include %Waste

500
450
90
50
70
150
90
15

m3
m3
m3
m2
m3
m3
m3
m2

0.275
0.88
0.46
0.118125
90
5
90

ton
m3
m3
m3
m3
m3
m3

0.107
0.385
0.88
0.46
0.165375
90
3
0.5
90

ton
ton
m3
m3
m3
m3
m3
ton
m3

0.107
0.385
0.88
0.46
0.165375
90
1
0.5
90

ton
ton
m3
m3
m3
m3
m3
ton
m3

-10%

0.107
0.385
0.88
0.46
0.165375
90
1.5
0.5
90
0.0428
0.055
0.121
0.06325
0.02415
8.8
90
5
0.5
90

ton
ton
m3
m3
m3
m3
m3
ton
m3
ton
ton
m3
m3
m3
No
m3
m3
ton
m3

15%

1.15

m2

-10%
15%
-10%
15%
-10%

72

m2

1.15
90
1.725
36

m2
m2
m2
m2

10%
10%

484
0.0726

No
ton

%Waste

Notes

Unit

s Basic Data

-10%
-10%
hammer
-40%
-40%

ment

(batch plant, loader, transmixer,pump)

ews

(1 Carpenter + 1 assistance)

2#pump pipe, 1#Concrete distrbuation, 1# leveling)

nt (batch plant, loader, transmixer,pump,vibrator)

ump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator)


(1 Craft + 1 assistance)

10%
10%
15%
5%
-10%
10%
7%
10%
10%
15%
5%
-10%

-10%

nt (batch plant, loader, transmixer,pump,vibrator)

ump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator)


(1 Craft + 1 assistance)

7%
10%
10%
15%
5%
-10%

-10%

nt (batch plant, loader, transmixer,pump,vibrator)

ump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator)


(1 Craft + 1 assistance)

nt (batch plant, loader, transmixer,pump,vibrator)

ump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator)


(1 Craft + 1 assistance)

7%
10%
10%
15%
5%
-10%

-10%
7%
10%
10%
15%
5%
10%
-10%

Block Slab as two way , thickness 27cm, rft=140kg/m3 (m3 included blocks))

2 layers) Bit.Crew = Bitmeen Crews (1 craft, 1 assistance)


Bit.Crew = Bitmeen Crews (1 craft, 1 assistance)

2 layers) Bit.Crew =Bitmeen Crews (1craft,1assistance)

2*6cm

Cement =300kg/m3

(1 builder, 1 assistance, 1 labour)

1st (300kg cement,1m3 sand)

me)
lime)
assistance,1labor)
nd)

lime)
ime)
assistance,1labor)

)
me)
lime)
assistance,1labor)
wder

lime)
assistance,1labor)
wder

Rates include %Waste

15%

0.253
3

m3
m3

10%
15%
15%

0.006105

ton

0.023
0.00575
25
0.006325
0.0138
0.0046

15

m3
m3
m2
ton
m3
m3
m3
m2
ton
ton
m3
m3
m3
m4
m2
ton
ton
m3
m3
m3
m4
m2

1.1
0.014025
0.04025
10
1.1
0.014025
0.04025
10

m2
ton
m3
m2
m2
ton
m3
m2

1.1
0.0099
0.0345
10
1.1
0.0099
0.0345
10
0.11
0.00143
0.0046
10
1.1
0.0066
0.023
25
0.0099
0.088

m2
ton
m3
m2
m2
ton
m3
m2
m2
ton
m3
m2
m2
ton
m3
m2
m2
m2

0.924

m3

0.275

kg

0.092

m3

1
10
1.1
0.0011
0.0154
10

m2
m2
L.m
ton
m3
L.m

10%

0.517

m2

10%

0.363

ton

%Waste

Notes

Unit

s Basic Data

10%
15%
15%
10%
10%
10%
15%
15%
10%
10%
10%
10%
15%
15%
10%
10%

m3 sand)
or 1m3 sand)
aft,1assistance,1labor)

10%
10%
15%

m3 sand)
or 1m3 sand)
ft,1assistance,1labor)

10%
10%
15%

or 1m3 sand)
aft,1assistance,1labor)

10%
10%
15%

or 1m3 sand)
aft,1assistance,1labor)

10%
10%
15%

m3 sand)
or 1m3 sand)
aft,1assistance,1labor)

10%
10%
15%

or 1m3 sand)
aft,1assistance,1labor)

10%
10%
15%

sleeper .4m axial,pieces 1.5m axial)


& Cost excuation

10%
10%

or 1m3 sand)

10%
10%

Crew (1 craft, 1assistance)

15%

aterial &excution)

30*50 with compact sand layer 10cm, mortar 2cm(300kg cement for 1 m3 sand)

aft,1assistance,1 labor)

width,4cm thick.&stair height 17cm,2cm thick &skirting 10cm)

10%
10%
15%

0.011
20
0.0066
0.0033
0.0138
0.0046
0.0077
0.0033
15
0.0066
0.0033
0.0138
0.0046
0.0077
0.0033

Notes

for 1m3 sand, mortar 3cm thickness)

aft,1assistance,1 labor)
al
n
(Wood & Painting)

15%
10%
Hnd.Mtrl
Hnd.Erct

10%

Rates include %Waste

Unit

%Waste

s Basic Data

0.0345

m3

10
33
10
1.1
10

L.m
kg
L.m
L.m
L.m

(Oil Painting)

10%

1.1
25

m2
m2

l (Wood Frame 1*2.2, width 12.5cm )

10%

0.00231

m3

10

No

1.1

m2

10

m2

0.9
1
0.9
1

Fl
Fl
Fl
Fl

0.9

Fl

Fl

0.9

Fl

Fl

pries Material

For one Building (BL= Building)

10%

ries Erection

al (Pipe and fitting )


on
(Appartus&accessories )

g Material (Pipe and Wire )

10%
10%

10%

g Erection

terial (Units &accessories )

rection

10%

Building coordinates
Building permits
Zero & foundation level
Build Axis plot down
Excavation for foundation
PLain concrete for footings

m3
m3

399.00
11.00

A44FN040

R.C. for footings

m3

40.00

A44FN050
A44FN060
A44FN070
A44FN080
A44FN090

Insulation of footings
Back fill arround footings
B.ground level masonry
Back fill Up to ground levl
G. floor concrete slab

m2
m3
m3
m3
m2

554.72
77.50
31.00
77.50
174.00

A44GR010

R.C for columns of


Ground Floor

m3

10.50

A44GR020

R.C for roof slab of


Ground Floor

m3

42.78

m3
m2
lot
lot
lot
m2
m2
lot
m2

45.26
370.50
0.13
0.13
0.03
167.71
165.43
0.25
371.00

A44GR030
A44GR040
A44GR050
A44GR060
A44GR070
A44GR080
A44GR100
A44GR090
A44GR110

Masonry work of G.F.


Plaster work of Ground Floor
Sanitary carcassing GR. F.
Electric carcassing GR. F.
Opining frames GR. F.
Insulation & protection
Wall ceramic tiles
Floor tiling for ground floor
Painting primer GR. F.
Roof finishing work
Facad finishing
Stairs finishings
Doors & Windows erection
Sanitary fixture
Electric final fix
Final paints

m2
lot
lot
lot
lot
lot
lot

140.00
1.00
1.00
1.00
0.50
0.50
1484.00

W&add

m3

Cement
Agg
W&add
Steel
Cement
Agg
W&add
Steel
Cement
Agg
W&add

m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3

Price/U
nit

m3

11.16

Cast P.Eq.

m3

15.84

Formw

Ex.Sub
m3 12.1118 Carp. Sub.
Cast P.Sub.

13.56

Cast R.Eq.

m3

20.04

Formw

m3

m3

Name

Price/U
nit

Name

32.4 Carp. Sub.


Steel Sub.
Cast R.Sub.

m3
m3
m3
m3
m3
m3

6.00

2.43 Cast Lab.


1.31
0.23
278.94 Cast Lab.
84.00
29.36
6.00
239.94 Cast Lab.
84.00
29.36
6.00

Ins. Sub
Bkf. Sub.

m2
m3

Mas. Sub
Bkf. Sub.

m3
m3

m2

0.42

Cast P.Eq.

m2

0.36

Cast P.Sub.

m3

20.01

Cast R.Eq.

m3

32.79

Formw

m3 97.7403 Carp. Sub.


Steel Sub.
Cast R.Sub.

m3
m3
m3

m3

20.01

Cast R.Eq.

m3

25.20

Formw

m3

76.288 Carp. Sub.


Steel Sub.
Cast R.Sub.

m3
m3
m3

Mas. Sub
Pla. Sub
San. Sub
EL. Sub
D@W Sub.
Ins. Sub
WCer. Sub.
Fl. Sub.
PA. Sub.
Ins. Sub
Fl.Sub
Fc. Sub.
Stair Sub.
D@W Sub.
San. Sub
EL. Sub
PA. Sub.

m2

m3
m2
lot
lot
lot
m2
m2
lot
m2
m2
lot
lot
lot
lot
lot
m2

Price/Unit

11.25
7.62
5.62
146.71
15.60
11.97
8.76

4490.17

361.58
4.54
10.79
139.06
10.79
2.59

14463.38
2518.42
836.23
4310.86
836.23

7.33
37.77
21.57
17.08
625.26
26.40
18.42
14.81
540.43
147.54
7.87
49688.16
26097.45
38182.93
19.38
41.30
47908.59
8.45

1275.86

55.43
44244.49
17320.51
34364.64
49688.16
26097.45
2.11

1613.83

6565.23

23119.45
6678.32
2915.84
6211.02
3262.18
954.57
3250.19
6832.39
11977.15
3133.85
7760.20
44244.49
17320.51
34364.64
24844.08
13048.73
3132.87

ch
ec
k

60.00 Cast Lab.


29.36
5.00
139.89 Cast Lab.
84.00
29.36

Name

Total

m3
m3
m3
m3
m3
m3

Price/U
nit

Name

Unit

Cement
Agg
W&add
Steel
Cement
Agg

Subcont.

Others
Unit

Price/U
nit

Name

Equipment
Unit

A44FN001
A44FN003
A44FN005
A44FN010
A44FN020
A44FN030

Labour
Unit

Bill QTY

Unit

Activity description

unit

Material
Activity ID

SUBJ:
ITEM
NO.
1

CAPABILITIES OF EQUIPMENT
TYPE OF EQUIPMENT

ACTIVITY

AVE. CAPABILITY

BULLDOZER
D9
D9
D9
D8
D7
D6

GRADER

3
4
5

PAY LOADER(2.0CU.M.
CRANE SHOVEL
SHEEP FOOT ROLLER

6
7

ROLLER
TANDEM ROLLER

8
9
10

PNEUMATIC ROLLER SELF


PROPELLED
DUMP TRUCK 5 CU.M. CAP

11

DUMP TRUCK 10 CU.M. CAP

12
13
14
15
16

TRANSIT MIXER
CONCRETE MIXER
CONCRETE BATCH PLANT
BUGGY
WHEEL BARROW

17
18
19

CLEARING
STRIPPING
EXCAVATION
EXCAVATION
EXCAVATION
EXCAVATION
QUARRYING
PUSHING

500 SQ.M./HR.
200 SQ. M/HR
700-800 CU.M./DAY
600-700 CU.M./DAY
500-600 CU.M./DAY
500 CU. M./DAY
50 CU.M./DAY
3 CU.M./HR

SUB-GRADING
SPREADING
LOADING
LOADING
STATIC ROLLING -13 PASSES
VIBRATORY ROLLING -14 PASSES
STATIC ROLLING -6 PASSES
STATIC ROLLING -6 PASSES
VIBRATORY ROLLING -6 PASSES
ROLLING

300SQ.M./HR.
500-600 CU.M./DAY
300 CU.M./DAY
35 CU.M. HR.
45 CU.M./HR.
135CU.M./HR.
24 CU.M./HR.
24 CU.M./HR.
77 CU.M./HR.
500-600 CU.M./DAY
5 CU.M./TRIP
4 CU.M./TRIP
3.5 CU.M./TRIP
10 CU.M./TRIP

CONC. PAVING BLDGS.


10 CU.M./DAY

24- 36 BAG/BATCH
1 1/2-2 BAG/BATCH

CONCRETE VIBRATOR
WATER TRUCK
ASPHALT DISTRIBUTOR

HAULING CONC. MIX


HAULING AGGREGATE
HAULING CONC. MIX
VIBRATING CONC. MIX
WATERING
SPRAYING ASPHALT PRIMECOAT

6 CU.FT/TRIP
2.5 CU.FT/TRIP
1.75 CU.FT/TRIP
40 CU.M./HR.
1,000 M./HR.
300 SQ.M./HR

20
21

ROCK CRUSHER
CONCRETE FLOOR FINISHES

CRUSHING MIXED SAND & GRAVEL


FINISHING CONC. FLOOR

30 CU.M./HR.
140 SQ.M./HR.

22

SCRAPPER TOWED 12 CU.

HAULING HEAP CAPACITY

11 CU.M./TRIP

23

SCRAPPER TOURNA PULL


45 TON
BACKHOE, 0.50 CU.M. CAP

HAULING HEAP CAPACITY

22 CU.M./TRIP

EXCAVATION

150 CU.M./DAY

24

REMARKS

OUTPUT/8HRS
OUTPUT/8HRS
OUTPUT/8HRS
OUTPUT/8HRS
OUTPUT/8HRS
OUTPUT/8HRS

OUTPUT/8HRS
OUTPUT/8HRS
15 CM. LIFT
15 CM. LIFT
20 CM. LIFT
20 CM. LIFT
30 CM.LIFT
OUTPUT/8HRS
FLAT ROLLING
MOUNTAINOUS

FLAT TERRAIN

1-BAG/BATCH
40 TON PER HR(TPH)