CBES designed and installed refrigeration for the new


Client: ASDA Superstore in Leith, Edinburgh in autumn 2008.
ASDA

Project Value:
£842,335

Project Duration:
12 weeks

The project included the installation of:

• cold rooms
• display cases
• a fish department with fish slab and ice machine
• alarm and monitoring system.

CBES designed and project managed works to the highest standards, meeting or
exceeding all key dates on budget.

Approach
Housed HT external plant, roof mounted in a purpose designed plant well were
chosen as the preferred option, with the LT Housed external plant located on
ground level in the service yard. This freed up space in the store for store use.

To meet the client’s requirements all services were installed at high level on the
sales floor and coordinated with all other disciplines.

Energy Saving Solutions


Plate heat exchangers were installed on the HT plant to pre-heat the store’s hot
water system.

Health and safety


Site specific risk analysis, method statements, COSCH and site health and safety
plan were compiled and adhered to at all times.

CBES divisions involved in this project:

• Refrigeration
• Electrical
• Commissioning
• Project Management
• Case Installation
• Coldroom Installation.