DESIGN OF SBR ACTIVATED SLUDGE PROCESS.
Facility Name: Gity of Greenbrier Noe: Design Few is based on apart tom Tin Ter
Surveying ars Mapping, re. using 220 year population
Permit No: —AR0036536C_ ‘Projection of the City of Greenbrier and Section 11.243 of 10,
Design Fow (2) 0980 MoD 1516. es "2S sas snes rrp out 0 gen
2 8 sue esses cape anders
Dry Peak Fow (0p) 1.960 MGD 3032 cls fowcauaaioe Theseogr tonal GD assy
Number of Basins & cycles: 2 Basins 5 cyclesibasin ‘actor tor mutiple aspects ofthe design.
Deis Fow () per basin e800 “766 cis
influent (mot) (bsidaybast) sa cyamnugamearene
300, - 220 8298 yeas menenion tthe $00 Becta! Onepr Deen
tse = 00 Sirs Cyetcencne saree ‘ew pean Sao,
3 TEL Tyersoveyn opp Tact rcen
5398 mol aes LqurSpende Saks wns 150 8 tate tow Waray!
sot 00 eee fasten tomes a Him = gn Waterco
tt. 300 fe ane Sty aon sernce ee = BERD M2
2orestvoee son voue @ uv 3385 3 442259 ol
Youre gia =—TBSTSS 9 —BPTBES gal
Muvss = 4269 mgt iced ee Sesedet Sot
eomss108
Total Basin Working Volume (V)= ovw= 7262.99 552075 galons
B= on uma Vout of 30 et Se poses pecan (vole tan wae mere meas of aTE Hex)
Organic Loading (OR) = 13.2 Ibs BODs/day-1000
Mor osg Cnt 135 ge 6.7 Pass: x FAL
‘ety cues heron
‘oe comersra Se Aaasn
to tr Conse Sotesin
bbs BODytay ronantecoyansn Rte
FIM Ratio:
C2 ibs MLVSS
t= Foon ato Grea open 55 owe 7; PASS: x FAL
os.o1 tr Etec hoon
2-aste comers Sp Aton
206k ones Sebteten
sosennease
Decantable Volume and Decanter Capacities
petal mie a Taal
dtecaniable volume: 178284 gat
"tena! enn TK ycetime (75%O), 58 hs PASS x FAL
Inno ar ie geal BATT tw (pon 9-46)
VeonserRowttsesies vole of 4s of design Now: 183333 gal PASS: x FAL
‘make sure this sss an the decal volume (page 9-15)
Hydraulic Retention Time
(tal basin voume x2 basins) (Sen flow) HRT:__26.1 hrs PASS: x FAIL:
(Oxygen Requirements
x
1.20 Jbs 0,flos 80D, (1.205 the valve essunea in he design calvin by permizee)
1 Stor Exendes Aeration
1 ora emer Acivated Saige
46 [bs Osflbs TKN
|. Extended Aeration & al attetion
AOR = (1.20" las BOD,/dayfbasin) + (4.6 Ibs TKNiday/basin) AOR = Aca Ar Requires
AOR. 1823.4 tbs Caldayroasin
AOR, = 1823 Ibs O,thouribasin
so hissayCoren factor assunpons te dred rom Tin yer
‘SOR = AOR /Comection Factor Seveyeg an Mapa, ne SM denna
SOR» Std Oyen Reins sypeaty orton ect Calton
Correction acter (6) = ossse __-08) | Abe 0780 Pate = 14540
SOR, 32942 tbs Oyaylbasin feo= 0950 DO.solsio= 967
SOR, = 3234 Ibs Oshourbasin Tompoowt= 1006 O.sakat = 1963
Volume of Air Required Teo)= 290 Psta= 14700
p= density of air = 0.075 Ibs? JDO mas 20 OF 0566
«w= weight fraction of 0 in a= 0231
TAR = SORIpw 16657.8 faimourbasin
TAR TreowtesiAvReqied «= Op ans eficiency = _ 0.3095, cates tere) OTE @ 1497 0028
AAR=TARIe — AAR~ActusArRenutes ‘ct vats: fn te (6035 cers bubs 0 915
AAR, = 61508.4 # aimourbasin
PAR 6150844 fPaiddaybasin = 1025.1 sefmpasin
Actual Ai Required per Pound of BOD.
Normal Air= ARs BOD
NemmlAly= ——eyopauasasmh — "crap ossreacenn
Normal Aig ff alcday-basin = 5542280: for Extenaed Aerobon
1100 a fo oe acta sabe
PASS: x Fall:
Blower Horesepower (hp)
tp eqiced 22.41 mp ne etutes= AORN! 8b Cate
‘Actual Blower Motor hp = 400 hp PASS: X FAIL:
tne buble ster ongen Vater ale = 65 02
Reference: nip mwa proceseneray com/Asratonts20Paper pst
Chlorination Contact Time
Peak Design Flow 1361 galfminute ‘Contact Chamber Volume
ak Oy Devin Flow (2 MD) x 1/1440 (intestay)
29898. gallons
Peak Flow Contact Time = 22.0 minutes Peak Flow Contact Tne = (Pek Flow Contaet Chamber Volume)
218 mites? Pass. x FAIL
Average Design Flow = 681 gallminute
‘Besgn Flow (GD «101440 rire)
‘Average Flow Contact Time = 43.9 minutes ‘Ag Flow Contact Time» (Design Flow / Contact Chamber Volune}
0 mines? PASS: X Fatt: