Sie sind auf Seite 1von 2
DESIGN OF SBR ACTIVATED SLUDGE PROCESS. Facility Name: Gity of Greenbrier Noe: Design Few is based on apart tom Tin Ter Surveying ars Mapping, re. using 220 year population Permit No: —AR0036536C_ ‘Projection of the City of Greenbrier and Section 11.243 of 10, Design Fow (2) 0980 MoD 1516. es "2S sas snes rrp out 0 gen 2 8 sue esses cape anders Dry Peak Fow (0p) 1.960 MGD 3032 cls fowcauaaioe Theseogr tonal GD assy Number of Basins & cycles: 2 Basins 5 cyclesibasin ‘actor tor mutiple aspects ofthe design. Deis Fow () per basin e800 “766 cis influent (mot) (bsidaybast) sa cyamnugamearene 300, - 220 8298 yeas menenion tthe $00 Becta! Onepr Deen tse = 00 Sirs Cyetcencne saree ‘ew pean Sao, 3 TEL Tyersoveyn opp Tact rcen 5398 mol aes LqurSpende Saks wns 150 8 tate tow Waray! sot 00 eee fasten tomes a Him = gn Waterco tt. 300 fe ane Sty aon sernce ee = BERD M2 2orestvoee son voue @ uv 3385 3 442259 ol Youre gia =—TBSTSS 9 —BPTBES gal Muvss = 4269 mgt iced ee Sesedet Sot eomss108 Total Basin Working Volume (V)= ovw= 7262.99 552075 galons B= on uma Vout of 30 et Se poses pecan (vole tan wae mere meas of aTE Hex) Organic Loading (OR) = 13.2 Ibs BODs/day-1000 Mor osg Cnt 135 ge 6.7 Pass: x FAL ‘ety cues heron ‘oe comersra Se Aaasn to tr Conse Sotesin bbs BODytay ronantecoyansn Rte FIM Ratio: C2 ibs MLVSS t= Foon ato Grea open 55 owe 7; PASS: x FAL os.o1 tr Etec hoon 2-aste comers Sp Aton 206k ones Sebteten sosennease Decantable Volume and Decanter Capacities petal mie a Taal dtecaniable volume: 178284 gat "tena! enn TK ycetime (75%O), 58 hs PASS x FAL Inno ar ie geal BATT tw (pon 9-46) VeonserRowttsesies vole of 4s of design Now: 183333 gal PASS: x FAL ‘make sure this sss an the decal volume (page 9-15) Hydraulic Retention Time (tal basin voume x2 basins) (Sen flow) HRT:__26.1 hrs PASS: x FAIL: (Oxygen Requirements x 1.20 Jbs 0,flos 80D, (1.205 the valve essunea in he design calvin by permizee) 1 Stor Exendes Aeration 1 ora emer Acivated Saige 46 [bs Osflbs TKN |. Extended Aeration & al attetion AOR = (1.20" las BOD,/dayfbasin) + (4.6 Ibs TKNiday/basin) AOR = Aca Ar Requires AOR. 1823.4 tbs Caldayroasin AOR, = 1823 Ibs O,thouribasin so hissay Coren factor assunpons te dred rom Tin yer ‘SOR = AOR /Comection Factor Seveyeg an Mapa, ne SM denna SOR» Std Oyen Reins sypeaty orton ect Calton Correction acter (6) = ossse __-08) | Abe 0780 Pate = 14540 SOR, 32942 tbs Oyaylbasin feo= 0950 DO.solsio= 967 SOR, = 3234 Ibs Oshourbasin Tompoowt= 1006 O.sakat = 1963 Volume of Air Required Teo)= 290 Psta= 14700 p= density of air = 0.075 Ibs? JDO mas 20 OF 0566 «w= weight fraction of 0 in a= 0231 TAR = SORIpw 16657.8 faimourbasin TAR TreowtesiAvReqied «= Op ans eficiency = _ 0.3095, cates tere) OTE @ 1497 0028 AAR=TARIe — AAR~ActusArRenutes ‘ct vats: fn te (6035 cers bubs 0 915 AAR, = 61508.4 # aimourbasin PAR 6150844 fPaiddaybasin = 1025.1 sefmpasin Actual Ai Required per Pound of BOD. Normal Air= ARs BOD NemmlAly= ——eyopauasasmh — "crap ossreacenn Normal Aig ff alcday-basin = 5542280: for Extenaed Aerobon 1100 a fo oe acta sabe PASS: x Fall: Blower Horesepower (hp) tp eqiced 22.41 mp ne etutes= AORN! 8b Cate ‘Actual Blower Motor hp = 400 hp PASS: X FAIL: tne buble ster ongen Vater ale = 65 02 Reference: nip mwa proceseneray com/Asratonts20Paper pst Chlorination Contact Time Peak Design Flow 1361 galfminute ‘Contact Chamber Volume ak Oy Devin Flow (2 MD) x 1/1440 (intestay) 29898. gallons Peak Flow Contact Time = 22.0 minutes Peak Flow Contact Tne = (Pek Flow Contaet Chamber Volume) 218 mites? Pass. x FAIL Average Design Flow = 681 gallminute ‘Besgn Flow (GD «101440 rire) ‘Average Flow Contact Time = 43.9 minutes ‘Ag Flow Contact Time» (Design Flow / Contact Chamber Volune} 0 mines? PASS: X Fatt:

Das könnte Ihnen auch gefallen