Sie sind auf Seite 1von 1

Well

Hai Thach Development

Date
Initial POB

Tue 3-Feb-15
135

Tuesday 03 Feb
00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00

7 DAY LOOKAHEAD
PVD-5

Wednesday 04 Feb

POOH & Recover Junk - L/Out RCJB Assy (75 ft/min)


00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
L/Out Junk Subs - Recover Junk
08:00
09:00
Clear Floor / Sevice Rig
10:00
PU & MU 8-1/2" Bit & BHA. Surf Test tools
11:00
12:00
13:00
14:00
15:00
16:00
RIH to +/- 3000m. Circ to cool MWD Tools
17:00
18:00
19:00
20:00
21:00
RIH to +/- 4350m
22:00
23:00
EQUIPMENT TO RIG

Thursday 05 Feb

00:00
Circ & Condition Mud at 17.3ppg In/Out
01:00
02:00
03:00
Conduct fingerprinting & Choke Drills
04:00
05:00
06:00
Drl-Out remaining Sh-Trk & Shoe at 4408m.
07:00
08:00
C/O Rathole/ Drill 3m new hole 4410m to 4413m09:00
Circ hole clean and condition mud
10:00
11:00
Pull inside shoe/ conduct FIT 18.6ppg EMW.
12:00
Drill 8.5" hole fr 4413 to ~4640m (Top LMH-20) 13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
EQUIPMENT TO RIG

EQUIPMENT FROM RIG


via Nor Captain
(ETA VT late PM)

Friday 06 Feb

00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
CBU for Samples
08:00
Drill "x" meters as required per Geologist
09:00
Circulate hole clean
10:00
11:00
12:00
POOH 5std swab test, RIH to TD.
13:00
14:00
Circ B/Up for Gas Count
15:00
16:00
POOH for Coring - Pump out to 5 stds inside shoe
17:00
18:00
19:00
CBU / Flow-Check
20:00
21:00
Pump-OOH to BHA
22:00
23:00
EQUIPMENT TO RIG

EQUIPMENT FROM RIG

160

Max POB next 7 days

135

Saturday 07 Feb
00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00

Flowchk at top of BHA


POOH & Rack back 8.5" drilling BHA

P/up Core barrel assy.

RIH to Coring Point - 4640m

EQUIPMENT FROM RIG

Max beds on rig

EQUIPMENT TO RIG

Sunday 08 Feb

Drop Ball & Core - 36m core

CBU / Flow-Check
Pump OOH Core Assy - 5 stnds inside shoe
EQUIPMENT TO RIG

EQUIPMENT FROM RIG

EQUIPMENT FROM RIG

00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00

Monday 09 Feb

Flowcheck
(Pump-Out) Core Assy to BHA

FlowCheck - POOH Coring BHA to surface

Recover Core at Surface


EQUIPMENT TO RIG
via Thai Binh
140T Barite (Fine Grind) - QTY TBC
400 BBL Base Oil per DMSR 31-01
5-1/2" Liner Full Jts + Pups
5-1/2" Liner Shoe Tracks
5-1/2" LNR Centralizers & Stop Collars
5-1/2" LNR Lift Nubbins & Acces's
1 ea 6-1/2" Jars + Accelerator
EQUIPMENT FROM RIG

CREWCHANGE

RIH to ~2400m.

Stage Circulate
RIH to ~3793m to

RIH to 3750m washing down F/- 3400m


EQUIPMENT TO RIG
via Thai Binh (continued)
Empty Basket f Howco 13.625 RTTS
others - TBA

EQUIPMENT FROM RIG


via Hai An

From Rig

To Rig
8
1

1
1

0
0
Updated POB .135
VESSELS
Thai Binh at VT
Hai An at Rig
Nor Captain at VT (PM)
Tuesday 03 Feb

Clear and Tidy Rig Floor


MU 8-1/2" Bit & BHA. Surf Test tools

Core Samples (1st Core)


Howco 13.625 RTTS
1 ea 6-1/2" Jars + Accelerator (used)
others - TBA

350T Bails (30ft) - BDPOC


Empty Containers
Waste Skiffs
To Rig

00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00

CREWCHANGE
From Rig
PVD-5 Crew Change
8
PVD-5/ Dpty Drlg Mgr (Phuc)
PVD-5/ /Drilling Engr Trainee
1
PVDI Mud Cooler Operator
PVDL MudLogger

CREWCHANGE

From Rig

To Rig
8

1
1
1
1

1
1

11
11
Updated POB .135
VESSELS
Thai Binh at VT
Hai An at Rig
Other - TBC
Wednesday 04 Feb

To Rig

0
0
Updated POB .135
VESSELS
Thai Binh at VT
Hai An at Rig
Other - TBC
Thursday 05 Feb

CREWCHANGE
From Rig
PVD-5 Crew Change
7
PVD-5/ Dpty Drlg Mgr (Phuc)
1
BDPOC DE
PVDL Data Engineer
MI Sr. Mud Engr
BHI Directional Driller

1
1
1
1

PJT / POS Pltfrm Crew - TBC

13

12
25
Updated POB .122
VESSELS
Thai Binh at VT
Hai An at Rig
Other - TBC
Friday 06 Feb

To Rig

CREWCHANGE

From Rig

0
0
Updated POB .122
VESSELS
Thai Binh to Rig (AM)
Hai An at Rig
Other - TBC
Saturday 07 Feb

To Rig

CREWCHANGE

From Rig

0
0
Updated POB .122
VESSELS
Thai Binh at Rig (AM)
Hai An at Rig
Other - TBC
Sunday 08 Feb

To Rig

CREWCHANGE
PVD-5 Crew Change

From Rig

0
0
Updated POB .122
VESSELS
Thai Binh at Rig
Hai An to VT
Other - TBC
Monday 09 Feb

Das könnte Ihnen auch gefallen