Project :

Bulathwatte MHPP

Duration :
Sunday

Description

Monday

Tuesday

Sun

Mon

Tus

Wed

Day
Tuesday

Thurs

Wednesday

Fri

Sat

8.00
11.00
Thursday
14.00
17.00
20.00
23.00
2.00
5.00
8.00

Day
8.00
11.00
14.00
17.00
20.00
23.00
2.00
5.00
8.00

Day
8.00
11.00
14.00
17.00
20.00
23.00
2.00
5.00
8.00

Sunday

Day
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

8.00
11.00
14.00
17.00
20.00
23.00
2.00
###
8.00
Day

Monday
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

Friday
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

8.00
11.00
14.00
17.00
20.00
23.00
2.00
5.00
8.00
Day

12.50%
12.50%
Friday
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
Wednesday
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
Thursday

8.00
11.00
14.00
17.00
20.00
23.00
2.00
5.00
8.00
Day

12.50%

Tuesday

8.00
11.00
14.00
17.00
20.00
23.00
2.00
5.00
8.00

12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
Saturday
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

Weekly Report
Project :

Bulathwatthe MHPP

Duration :29/07/2012 to 04/08/2012


WEATHER

Description

Monday

Sunday

Heavy Rain- Red


Lite Rain- Blue
Cloudy Black
Sunny- Yellow

Sun

Mon

Tuesday

Thursday

Wednesday

Tue

Wed

Saturday

Friday

Thurs

Fri

Sat

Present Staf

DGM
PM

Site QS

TO
Sup 01

Sup 02

Cashier

Cook

Skill Labours
Unskill labour

01-Surveyor helper

01-Surveyor helper

01-Surveyor helper

01-Surveyor helper
05Nr- Building
a summer hut near power
house,preparing and fixing sign boards
within the site

01-Surveyor helper
05NrBuilding a summer hut near power
house,preparing and fixing sign boards
within the site

02- Surveyor helper


01- Helper for the cook
02- Miscellaneous work

02Nr- Surveyor helper

KOBELCO - Removing rocks from


channel path(spillway)

KOBELCO - Removing rocks from


channel path(spillway)

Civil Works

Extra works
KOBELCO - Removing rocks from
KOBELCO - Excavaton of weir and
channel path(spillway)
CAT intake
G.R.P. line excavation (CH660-CH730)

Excavator

JCB

Machines & Vahicles


KOBELCO - 2.4hrs
- 4.9hrs

Excavator

CAT

KOBELCO - 1.0hrs

KOBELCO - 1.2hrs

KOBELCO - 6.0hrs

JCB
Chainsaw
VS Roller
Tractor
Lorry

CONTRACTOR'S DETAILS
Description

Sun

Mon

Tus

Wed

Thurs

Fri

Saturday

Present Staf

Sup 01

Sup 02

Site Administrator

Blasting Formen

PM
Engineer
TO

01Nr- Drilling rocks (Wier)


04Nr- Concreting box
channel slab (CH332-CH349)

04Nr- Laying the screed concrete 04Nr- Reinforcing channel base


for channel base (CH080-CH097) (CH080-CH097)
01Nr- Drilling
and blasing rocks( Channel path
spillway)

01Nr- Drilling and blasting rocks


(Channel path.spillway)
01Nr- Site clearance

04Nr- Reinforcing channel base


(CH080-CH097)
02Nr- Preparing reinforcement
for box channel section (CH140CH174)
01Nr- Drilling and blasting
rocks ( Channel path, spill way)

04Nr- Reinforcing channel base


(CH080-CH097)
02Nr- Preparing reinforcement for
box channel section (CH140-CH174)

02Nr- Reinforcing channel base


(CH080-CH097)
01Nr- Preparing reinforcement
for box channel section (CH140CH174)
01Nr- Drilling and blasting
rocks ( Channel path, spill way)

02Nr- Reinforcing channel base


(CH080-CH097)
01Nr- Preparing reinforcement for
box channel section (CH140-CH174)

01Nr- Drilling and blasting rocks


( Wier)

03Nr- Formworking channel base


(CH080-CH097)
02NrPreparing reinforcemnt for box
channel section (CH140-CH174)
01Nr- Drilling
and blasting rocks

Skill Labours

01Nr- Drilling rocks (Wier)


05Nr- Concreting box
channel slab (CH332-CH349)

Unskill Labours

04Nr- Laying the screed concrete 04Nr- Reinforcing channel base


for channel base (CH080-CH097) (CH080-CH097)
01Nr- Drilling
and blasing rocks( Channel path
spillway)

01Nr- Drilling and blasting rocks


(Channel path.spillway)
01Nr- Site clearance

01Nr- Drilling and blasting rocks


( Wier)

04Nr- Formworking channel base


(CH080-CH097)
01NrPreparing reinforcemnt for box
channel section (CH140-CH174)
01Nr- Drilling
and blasting rocks

Day

Sunday
8.00
11.00
14.00
17.00
20.00
23.00
2.00

12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

5.00
8.00

12.50%

Day

Monday

8.00
11.00
14.00
17.00
20.00
23.00
2.00
5.00
8.00
Day

12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

12.50%
Tuesday

8.00
11.00
14.00
17.00
20.00
23.00
2.00

12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%

5.00
8.00

12.50%

Day

Wednesday

8.00
11.00
14.00
17.00

12.50%

20.00
23.00
2.00
5.00
8.00

12.50%

12.50%
12.50%
12.50%

12.50%
12.50%
12.50%

Day

Thursday
8.00
11.00
14.00
17.00
20.00
23.00
2.00
5.00
8.00

Day

12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
Friday

8.00
11.00
14.00
17.00
20.00
23.00
2.00
5.00
8.00
Day

12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
Friday

8.00
11.00
14.00
17.00
20.00
23.00
2.00
5.00
8.00

12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%
12.50%