Contents

1. Models
2. Project Brief
3. Figures & Quantities
4. Structural Overview

5. Sequence of Work
THE BURJ TOWER

6. Cranage & Hoisting


7. Concrete Placement
8. Survey & Monitoring
9. Spire Erection

10. Photographs
Model

The Burj is a landmark high rise structure part of a very important


development scheme in downtown Dubai
THE BURJ TOWER
Model

Some artistical impressions…


THE BURJ TOWER
THE BURJ TOWER Model
THE BURJ TOWER Model
THE BURJ TOWER Model
THE BURJ TOWER Model
Project Brief
Pinnacle

Spire

Project Name The Burj Tower


Communication (L160)

Duration 47Months (Feb. ’05 ~ Dec. ’08)


Office (L153)

Cost 876,000,000 USD


Observatory
(L123)
Owner EMAAR Properties

Residence (L108)
Floors Above 160 floors
THE BURJ TOWER

Height Above 800m

Usage Hotel, Residence, Office

Hotel (L39)
Project Brief

.Client Emaar Properties PJSC

.Consultants

Project Manager Turner Construction Int’l.

Design Skidmore, Owings & Merill (SOM)


THE BURJ TOWER

Supervision Hyder Consulting

Quantity Surveyor DG Jones Int’l.

.Construction Period 01 Feb 2005 – 30 Dec 2008


Figures & Quantities

Some salient figures and quantities:

•Total height of the tower : More than 800 M


•Gross area tower : 279,000 sq. M
•Gross area podium : 186,000 sq. M
•Total concrete quantity tower : 145,000 cubic M
THE BURJ TOWER

•Total concrete quantity podium : 115,000 cubic M


•Overall concrete quantity : 260,000 cubic M
•Overall rebar quantity : 34,000 tons
Structural Overview

• Y-shaped floor plan is ideal for residential program


– Maximizes window perimeter to floor plate area
– Is inherently stable

• Buttressed core
– Three wings arranged around central core
– Each wing supports other two

• Setbacks occur at each wing in a spiraling pattern


– Reduces vortex shedding by changing building shape 24 times
THE BURJ TOWER

© 2003 All rights reserved.


THE BURJ TOWER Structural Overview

Analysis Model
Structural Overview

Hotel Residential
Floor plan
THE BURJ TOWER

Typical Floor Plan


Structural Overview

Tower Seismic Design

• 500 year Event

• Wind Typically Governs

• Seismic Only Governs near Top


THE BURJ TOWER
Structural Overview

Predicted Wind Drift

• Location Elevation Drift


(m) (mm)

Top Communications +604.9 1450

• Top Office +569.7 1250

• Observatory +442.1 750


THE BURJ TOWER

• Top Residential +375.3 540

• 50 year wind event


THE BURJ TOWER Structural Overview

3D View Under Construction


Sequence of Work
Typical Work Sequence
wing-A

C-1 C-3
[Section A-A]

C-2

wing-C
A wing-
B

[Work Sequence]

Level 0
THE BURJ TOWER

Level -1 3 to 5 levels below 2 levels below


Level -2
Level -3
Level -4
Level -5 2 levels below
6 to 8 levels below
Level -6 3levels below
Level -7 Wing Wing Corridor Corner Slab
Level -8 Slab Slab
Level -9 Center Lobby Slab

Nose Slab Wing Corewall Center Corewall Corner Slab


Sequence of Work
Work Sequence & Shoring Plan

Day 0 Day 1 Day 2 Day 3


: Con’c Pouring : Slab formwork : Slab formwork : Con’c Pouring
: Rebar Installation
: MEP
N+1

N+0

Form Form
Additional Form
N-1 Raking Shore
THE BURJ TOWER

Form
N-2
1/2 of
1/2 of Raking 1/2 of Raking Raking
Shore Shore Shore
N-3

2/3 of
2/3 of Prop
N-4 Prop

1/3 of
2/3 of Prop
Prop
N-5

Tower Slab Formwork


Cranage & Hoisting
Overall Equipments Layout
. Tower Crane - 3 nos.
T/C#M1 : Favco M440D (25ton)
T/C#M2 : Favco M380D (25ton)
T/C#M3 : Favco M220D (11ton)
Pump#1~#3

. Hoist - 14 cages
Phase 1 (Ground ~ L100) : H/C#1~#4 (8cages) T/C#M2 T/C#M3
Phase 2 (L100 ~ L142) : H/C#5~#6 (4 cages)
Phase 3 (L142 ~ SL2) : H/C#7 (2 cages)
Jump Hoist : Jump#1, Jump#2 (2 cages)
THE BURJ TOWER

H/C#3~4
H/C#7
. Concrete Pump - 4 nos.
Pump#1~#3 (Ground Level) : High Pressure H/C#5~6
Pump#4 (L124) for Secondary Pumping
H/C#1~2

. Concrete Placing Boom - 4 nos.


CPB#1. for Center core : 32m Boom T/C#M1
CPB#2~#4. for Wing core : 28m Boom
Cranage & Hoisting
Tower Crane – Installation Method

Con’c Placing
T/C#M2 T/C#M3 Boom
M380D M220D

Climbing
Core wall form
3rd Bracket
Installation
THE BURJ TOWER

Installation
Height : 48m

Top
collar
T/C#M1 :
M440D
Clamping Height
: 15.5 ~ 17m

Bottom
collar
Cranage & Hoisting
Tower Crane - Dismantling Method TOP OF SPIRE
T/STEEL EL: +704.9
TOP OF SPIRE
T/STEEL EL: +704.9
TOP OF SPIRE
T/STEEL EL: +704.9

SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE


T/STEEL EL: +691.3 T/STEEL EL: +691.3 T/STEEL EL: +691.3

SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE


T/STEEL EL: +681.7 T/STEEL EL: +681.7 T/STEEL EL: +681.7

SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE


T/STEEL EL: +668.9 T/STEEL EL: +668.9 T/STEEL EL: +668.9

SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2


T/STEEL EL: +665.7 T/STEEL EL: +665.7 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1


T/STEEL EL: +659.3 T/STEEL EL: +659.3 T/STEEL EL: +659.3

SPIRE LEVEL 5 SPIRE LEVEL 5 SPIRE LEVEL 5


T/STEEL EL: +656.1 T/STEEL EL: +656.1 T/STEEL EL: +656.1

Multi Step Method


SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE
T/STEEL EL: +652.9 T/STEEL EL: +652.9 T/STEEL EL: +652.9

23

1st Station
SPIRE LEVEL 4 SPIRE LEVEL 4 SPIRE LEVEL 4
22 T/STEEL EL: +646.4 T/STEEL EL: +646.4 T/STEEL EL: +646.4

21

SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE


T/STEEL EL: +640.0 T/STEEL EL: +640.0 T/STEEL EL: +640.0

20

19 SPIRE LEVEL 3 SPIRE LEVEL 3 SPIRE LEVEL 3


T/STEEL EL: +633.6 T/STEEL EL: +633.6 T/STEEL EL: +633.6

- 1st Station : L161


18

SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 2 - MEZZANINE2


T/STEEL EL: +627.2 T/STEEL EL: +627.2 T/STEEL EL: +627.2
17

16
SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1
T/STEEL EL: +620.8 T/STEEL EL: +620.8 T/STEEL EL: +620.8

15 SPIRE LEVEL 2 SPIRE LEVEL 2 SPIRE LEVEL 2


W W W
T/STEEL EL: +617.6 T/STEEL EL: +617.6 T/STEEL EL: +617.6

SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE


14 T/STEEL EL: +614.4 T/STEEL EL: +614.4 T/STEEL EL: +614.4

-2 Station: L99
13

nd
LEVEL 162 / SPIRE LEVEL 1 LEVEL 162 / SPIRE LEVEL 1 LEVEL 162 / SPIRE LEVEL 1
T/SLAB EL: +608.0 T/SLAB EL: +608.0 T/SLAB EL: +608.0

12

11
LEVEL 161 LEVEL 161 LEVEL 161
T/SLAB EL: +601.9 T/SLAB EL: +601.9 T/SLAB EL: +601.9

10 10

LEVEL 160 LEVEL 160 LEVEL 160 LEVEL 160

8 8

LEVEL 159 LEVEL 159 LEVEL 159 LEVEL 159

3nos. Recovery Crane


7 7

6 6

LEVEL 158 LEVEL 158 LEVEL 158 LEVEL 158


5 5

LEVEL 157 4
LEVEL 157 4
LEVEL 157 LEVEL 157

- Favco 242R, Ogawa OT4520, Favco SDD3/10


3 3

LEVEL 156 2 LEVEL 156 2 LEVEL 156 LEVEL 156

1 1

LEVEL 155 LEVEL 155 LEVEL 155 LEVEL 155

LEVEL 154 LEVEL 154 LEVEL 154 LEVEL 154

LEVEL 153 LEVEL 153 LEVEL 153 LEVEL 153

LEVEL 152 LEVEL 152 LEVEL 152 LEVEL 152

LEVEL 151 LEVEL 151 LEVEL 151 LEVEL 151

LEVEL 150 LEVEL 150 LEVEL 150 LEVEL 150

LEVEL 149 LEVEL 149 LEVEL 149 LEVEL 149

LEVEL 148 LEVEL 148 LEVEL 148 LEVEL 148

LEVEL 147 LEVEL 147 LEVEL 147 LEVEL 147


THE BURJ TOWER

LEVEL 145 LEVEL 145 LEVEL 145 LEVEL 145

LEVEL 143 LEVEL 143 LEVEL 143 LEVEL 143

LEVEL 142 LEVEL 142 LEVEL 142 LEVEL 142

LEVEL 141 LEVEL 141 LEVEL 141 LEVEL 141

LEVEL 140 LEVEL 140 LEVEL 140 LEVEL 140

LEVEL 135 LEVEL 135 LEVEL 135 LEVEL 135

LEVEL 130 LEVEL 130 LEVEL 130 LEVEL 130

LEVEL 125 LEVEL 125 LEVEL 125 LEVEL 125

LEVEL 120 LEVEL 120 LEVEL 120 LEVEL 120

LEVEL 115 LEVEL 115 LEVEL 115 LEVEL 115

LEVEL 110 LEVEL 110 LEVEL 110 LEVEL 110

2 Station
nd
LEVEL 105 LEVEL 105 LEVEL 105 LEVEL 105

S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

LEVEL 100 LEVEL 100 LEVEL 100 LEVEL 100


LEVEL 99 LEVEL 99 LEVEL 99 LEVEL 99
Cranage & Hoisting
TOP OF SPIRE TOP OF SPIRE TOP OF SPIRE TOP OF SPIRE
T/STEEL EL: +704.9 T/STEEL EL: +704.9 T/STEEL EL: +704.9 T/STEEL EL: +704.9

SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE
T/STEEL EL: +691.3 T/STEEL EL: +691.3 T/STEEL EL: +691.3 T/STEEL EL: +691.3

SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE
T/STEEL EL: +681.7 T/STEEL EL: +681.7 T/STEEL EL: +681.7 T/STEEL EL: +681.7

SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE
T/STEEL EL: +668.9 T/STEEL EL: +668.9 T/STEEL EL: +668.9 T/STEEL EL: +668.9

SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2
T/STEEL EL: +665.7 T/STEEL EL: +665.7 T/STEEL EL: +665.7 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1
T/STEEL EL: +659.3 T/STEEL EL: +659.3 T/STEEL EL: +659.3 T/STEEL EL: +659.3

SPIRE LEVEL 5 SPIRE LEVEL 5 SPIRE LEVEL 5 SPIRE LEVEL 5


T/STEEL EL: +656.1 T/STEEL EL: +656.1 T/STEEL EL: +656.1 T/STEEL EL: +656.1

SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE
T/STEEL EL: +652.9 T/STEEL EL: +652.9 TOP OF SPIRE T/STEEL EL: +652.9 TOP OF SPIRE
T/STEEL EL: +652.9

T/STEEL EL: +704.9 T/STEEL EL: +704.9


23

SPIRE LEVEL 4 SPIRE LEVEL 4 SPIRE LEVEL 4 SPIRE LEVEL 4


22 T/STEEL EL: +646.4 T/STEEL EL: +646.4 T/STEEL EL: +646.4 T/STEEL EL: +646.4

21

SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE
T/STEEL EL: +640.0 T/STEEL EL: +640.0 T/STEEL EL: +640.0 T/STEEL EL: +640.0

20

19 SPIRE LEVEL 3 SPIRE LEVEL 3 SPIRE LEVEL 3 SPIRE LEVEL 3


T/STEEL EL: +633.6 T/STEEL EL: +633.6 T/STEEL EL: +633.6 T/STEEL EL: +633.6

18

SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 8 BASE SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 8 BASE
SPIRE LEVEL 2 - MEZZANINE2
T/STEEL EL: +627.2 T/STEEL EL: +627.2 T/STEEL EL: +627.2 T/STEEL EL: +627.2
17 T/STEEL EL: +691.3 T/STEEL EL: +691.3

16
SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1
T/STEEL EL: +620.8 T/STEEL EL: +620.8 T/STEEL EL: +620.8 T/STEEL EL: +620.8

15 SPIRE LEVEL 2 SPIRE LEVEL 2 SPIRE LEVEL 2 SPIRE LEVEL 2


W W W W
T/STEEL EL: +617.6 T/STEEL EL: +617.6 T/STEEL EL: +617.6 T/STEEL EL: +617.6

SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE
14 T/STEEL EL: +614.4 T/STEEL EL: +614.4 T/STEEL EL: +614.4 T/STEEL EL: +614.4

13
SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE
LEVEL 162 / SPIRE LEVEL 1 LEVEL 162 / SPIRE LEVEL 1 T/STEEL EL: +681.7 LEVEL 162 / SPIRE LEVEL 1 T/STEEL EL: +681.7
LEVEL 162 / SPIRE LEVEL 1
T/SLAB EL: +608.0 T/SLAB EL: +608.0 T/SLAB EL: +608.0 T/SLAB EL: +608.0

12

Step 1 : Main T/C Dismantling


11
LEVEL 161 LEVEL 161 LEVEL 161 LEVEL 161
T/SLAB EL: +601.9 T/SLAB EL: +601.9 T/SLAB EL: +601.9 T/SLAB EL: +601.9

10 10

LEVEL 160 LEVEL 160 LEVEL 160 LEVEL 160

8 8

LEVEL 159 LEVEL 159 LEVEL 159


SPIRE LEVEL 6 BASE LEVEL 159 SPIRE LEVEL 6 BASE
7 7
T/STEEL EL: +668.9 T/STEEL EL: +668.9

6 6

1) Main T/C Descending to L161


LEVEL 158 LEVEL 158 LEVEL 158
SPIRE LEVEL 5 - MEZZANINE2
T/STEEL EL: +665.7
LEVEL 158 SPIRE LEVEL 5 - MEZZANINE2
T/STEEL EL: +665.7
5 5

LEVEL 157 4
LEVEL 157 4
LEVEL 157 LEVEL 157
3 3
SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1
T/STEEL EL: +659.3 T/STEEL EL: +659.3
LEVEL 156 2 LEVEL 156 2 LEVEL 156 LEVEL 156
SPIRE LEVEL 5 SPIRE LEVEL 5
1 1 T/STEEL EL: +656.1 T/STEEL EL: +656.1

2) Main T/C Dismantled to L99 by Favco 242R


LEVEL 155 LEVEL 155 LEVEL 155 LEVEL 155
SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE
T/STEEL EL: +652.9 T/STEEL EL: +652.9
LEVEL 154 LEVEL 154 LEVEL 154 LEVEL 154
23
LEVEL 153 LEVEL 153 LEVEL 153 LEVEL 153

LEVEL 152 LEVEL 152 22


SPIRE LEVEL 4
LEVEL 152
T/STEEL EL: +646.4
LEVEL 152 SPIRE LEVEL 4
T/STEEL EL: +646.4

LEVEL 151 LEVEL 151 LEVEL 151 LEVEL 151

3) Dismantled Components moved to Ground


21
LEVEL 150 LEVEL 150 LEVEL 150 LEVEL 150
SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE
T/STEEL EL: +640.0 T/STEEL EL: +640.0
LEVEL 149 LEVEL 149 20
LEVEL 149 LEVEL 149

LEVEL 148 LEVEL 148 LEVEL 148 LEVEL 148


19 SPIRE LEVEL 3 SPIRE LEVEL 3
LEVEL 147 LEVEL 147 LEVEL 147 LEVEL 147

by Ogawa OT4520
T/STEEL EL: +633.6 T/STEEL EL: +633.6

Favco
18
THE BURJ TOWER

LEVEL 145 LEVEL 145 LEVEL 145 LEVEL 145


SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 2 - MEZZANINE2
T/STEEL EL: +627.2 T/STEEL EL: +627.2
17

LEVEL 143 LEVEL 143 LEVEL 143 LEVEL 143

242R
16
SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1
T/STEEL EL: +620.8 T/STEEL EL: +620.8
LEVEL 142 LEVEL 142 LEVEL 142 LEVEL 142
15 SPIRE LEVEL 2 SPIRE LEVEL 2
LEVEL 141 LEVEL 141 W LEVEL 141 LEVEL 141 W
T/STEEL EL: +617.6 T/STEEL EL: +617.6

LEVEL 140 LEVEL 140 14 LEVEL 140


SPIRE LEVEL 1 - MEZZANINE
T/STEEL EL: +614.4
LEVEL 140 SPIRE LEVEL 1 - MEZZANINE
T/STEEL EL: +614.4

13

LEVEL 162 / SPIRE LEVEL 1 LEVEL 162 / SPIRE LEVEL 1


T/SLAB EL: +608.0 T/SLAB EL: +608.0

L161
12

LEVEL 135 LEVEL 135 LEVEL 135 LEVEL 135

11
LEVEL 161 LEVEL 161
T/SLAB EL: +601.9 T/SLAB EL: +601.9

10 10

LEVEL 130 LEVEL 160 LEVEL 130 LEVEL 130 LEVEL 160 LEVEL 130

8 8

LEVEL 159 LEVEL 159


7 7
LEVEL 125 LEVEL 125 LEVEL 125 LEVEL 125

6 6

LEVEL 158 LEVEL 158

LEVEL 120
LEVEL 157
LEVEL 120
5

4
LEVEL 120
LEVEL 157
Main T/C
LEVEL 120
5

3 3

LEVEL 115 LEVEL 156 LEVEL 115 2 LEVEL 115 LEVEL 156 LEVEL 115 2

1 1

LEVEL 155 LEVEL 155


LEVEL 110 LEVEL 110 LEVEL 110 LEVEL 110

LEVEL 154 LEVEL 154

LEVEL 153 LEVEL 153


LEVEL 105 LEVEL 105 LEVEL 105 LEVEL 105
LEVEL 152 LEVEL 152

LEVEL 151 LEVEL 151


S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

LEVEL 100 LEVEL 100 LEVEL 100 LEVEL 100


LEVEL 99 LEVEL 150 LEVEL 99 LEVEL 99 LEVEL 150 LEVEL 99

LEVEL 149 LEVEL 149

LEVEL 148 LEVEL 148


Cranage & Hoisting
TOP OF SPIRE TOP OF SPIRE TOP OF SPIRE TOP OF SPIRE
T/STEEL EL: +704.9 T/STEEL EL: +704.9 T/STEEL EL: +704.9 T/STEEL EL: +704.9

SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE
T/STEEL EL: +691.3 T/STEEL EL: +691.3 T/STEEL EL: +691.3 T/STEEL EL: +691.3

SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE
T/STEEL EL: +681.7 T/STEEL EL: +681.7 T/STEEL EL: +681.7 T/STEEL EL: +681.7

SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE
T/STEEL EL: +668.9 T/STEEL EL: +668.9 T/STEEL EL: +668.9 T/STEEL EL: +668.9

SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2
T/STEEL EL: +665.7 T/STEEL EL: +665.7 T/STEEL EL: +665.7 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1
T/STEEL EL: +659.3 T/STEEL EL: +659.3 T/STEEL EL: +659.3 T/STEEL EL: +659.3

1st Station
SPIRE LEVEL 5 SPIRE LEVEL 5 SPIRE LEVEL 5 SPIRE LEVEL 5
T/STEEL EL: +656.1 T/STEEL EL: +656.1 T/STEEL EL: +656.1 T/STEEL EL: +656.1

SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE
T/STEEL EL: +652.9 TOP OF SPIRE T/STEEL EL: +652.9 T/STEEL EL: +652.9 TOP OF SPIRE T/STEEL EL: +652.9 TOP OF SPIRE
T/STEEL EL: +704.9 T/STEEL EL: +704.9 T/STEEL EL: +704.9
23

SPIRE LEVEL 4 SPIRE LEVEL 4 SPIRE LEVEL 4 SPIRE LEVEL 4


22 T/STEEL EL: +646.4 T/STEEL EL: +646.4 T/STEEL EL: +646.4 T/STEEL EL: +646.4

21

SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE
T/STEEL EL: +640.0 T/STEEL EL: +640.0 T/STEEL EL: +640.0 T/STEEL EL: +640.0

20

19 SPIRE LEVEL 3 SPIRE LEVEL 3 SPIRE LEVEL 3 SPIRE LEVEL 3


T/STEEL EL: +633.6 T/STEEL EL: +633.6 T/STEEL EL: +633.6 T/STEEL EL: +633.6

18

SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 8 BASE SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 8 BASE SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 8 BASE
T/STEEL EL: +627.2 T/STEEL EL: +627.2 T/STEEL EL: +627.2 T/STEEL EL: +627.2
17 T/STEEL EL: +691.3 T/STEEL EL: +691.3 T/STEEL EL: +691.3

16
SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1
T/STEEL EL: +620.8 T/STEEL EL: +620.8 T/STEEL EL: +620.8 T/STEEL EL: +620.8

15 SPIRE LEVEL 2 SPIRE LEVEL 2 SPIRE LEVEL 2 SPIRE LEVEL 2


W W W W
T/STEEL EL: +617.6 T/STEEL EL: +617.6 T/STEEL EL: +617.6 T/STEEL EL: +617.6

SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE
14 T/STEEL EL: +614.4 T/STEEL EL: +614.4 T/STEEL EL: +614.4 T/STEEL EL: +614.4

13
SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE
LEVEL 162 / SPIRE LEVEL 1 T/STEEL EL: +681.7 LEVEL 162 / SPIRE LEVEL 1 LEVEL 162 / SPIRE LEVEL 1 T/STEEL EL: +681.7 LEVEL 162 / SPIRE LEVEL 1 T/STEEL EL: +681.7
T/SLAB EL: +608.0 T/SLAB EL: +608.0 T/SLAB EL: +608.0 T/SLAB EL: +608.0

12

Step 2 : Favco 242R Dismantling


11
LEVEL 161 LEVEL 161 LEVEL 161 LEVEL 161
T/SLAB EL: +601.9 T/SLAB EL: +601.9 T/SLAB EL: +601.9 T/SLAB EL: +601.9

10 10

LEVEL 160 LEVEL 160 LEVEL 160 LEVEL 160

8 8

LEVEL 159 LEVEL 159


SPIRE LEVEL 6 BASE LEVEL 159 LEVEL 159
SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE
7 7
T/STEEL EL: +668.9 T/STEEL EL: +668.9 T/STEEL EL: +668.9

6 6

1) Favco SDD 3/10 Installed on L161


LEVEL 158 LEVEL 158
SPIRE LEVEL
T/STEEL EL:
5 - MEZZANINE2
+665.7
LEVEL 158 LEVEL 158
SPIRE LEVEL 5 - MEZZANINE2
T/STEEL EL: +665.7
SPIRE LEVEL 5 - MEZZANINE2
T/STEEL EL: +665.7
5 5

LEVEL 157 4
LEVEL 157 4
LEVEL 157 LEVEL 157
3 3
SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1
T/STEEL EL: +659.3 T/STEEL EL: +659.3 T/STEEL EL: +659.3
LEVEL 156 2 LEVEL 156 2 LEVEL 156 LEVEL 156
SPIRE LEVEL 5 SPIRE LEVEL 5 SPIRE LEVEL 5
1 T/STEEL EL: +656.1 1 T/STEEL EL: +656.1 T/STEEL EL: +656.1

2) Favco 242R Dismantled to L99 by Favco SDD3/10


LEVEL 155 LEVEL 155 LEVEL 155 LEVEL 155
SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE
T/STEEL EL: +652.9 T/STEEL EL: +652.9 T/STEEL EL: +652.9
LEVEL 154 LEVEL 154 LEVEL 154 LEVEL 154
23
LEVEL 153 LEVEL 153 LEVEL 153 LEVEL 153

LEVEL 152 22 LEVEL 152


SPIRE LEVEL 4
T/STEEL EL: +646.4
LEVEL 152 LEVEL 152
SPIRE LEVEL 4
T/STEEL EL: +646.4
SPIRE LEVEL 4
T/STEEL EL: +646.4

LEVEL 151 LEVEL 151 LEVEL 151 LEVEL 151

3) Dismantled Components moved to Ground


21
LEVEL 150 LEVEL 150 LEVEL 150 LEVEL 150
SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE
T/STEEL EL: +640.0 T/STEEL EL: +640.0 T/STEEL EL: +640.0
LEVEL 149 20
LEVEL 149 LEVEL 149 LEVEL 149

LEVEL 148 LEVEL 148 LEVEL 148 LEVEL 148


19 SPIRE LEVEL 3 SPIRE LEVEL 3 SPIRE LEVEL 3
LEVEL 147 LEVEL 147
T/STEEL EL: +633.6
LEVEL 147 LEVEL 147
T/STEEL EL: +633.6 T/STEEL EL: +633.6

by Ogawa OT4520.
18
THE BURJ TOWER

LEVEL 145 LEVEL 145 LEVEL 145 LEVEL 145


SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 2 - MEZZANINE2
T/STEEL EL: +627.2 T/STEEL EL: +627.2 T/STEEL EL: +627.2
17

LEVEL 143 LEVEL 143 LEVEL 143 LEVEL 143


16
SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1 SPIRE LEVEL 2 - MEZZANINE1
T/STEEL EL: +620.8 T/STEEL EL: +620.8 T/STEEL EL: +620.8

Favco 242R
LEVEL 142 LEVEL 142 LEVEL 142 LEVEL 142
15 SPIRE LEVEL 2 SPIRE LEVEL 2 SPIRE LEVEL 2
LEVEL 141 W LEVEL 141 LEVEL 141 W LEVEL 141 W
T/STEEL EL: +617.6 T/STEEL EL: +617.6 T/STEEL EL: +617.6

LEVEL 140 14 LEVEL 140


SPIRE LEVEL
T/STEEL EL:
1 - MEZZANINE
+614.4
LEVEL 140 LEVEL 140
SPIRE LEVEL 1 - MEZZANINE
T/STEEL EL: +614.4
SPIRE LEVEL 1 - MEZZANINE
T/STEEL EL: +614.4

13

LEVEL 162 / SPIRE LEVEL 1 LEVEL 162 / SPIRE LEVEL 1 LEVEL 162 / SPIRE LEVEL 1
T/SLAB EL: +608.0 T/SLAB EL: +608.0 T/SLAB EL: +608.0

L161
12
LEVEL 135 LEVEL 135 LEVEL 135 LEVEL 135

11
LEVEL 161 LEVEL 161 LEVEL 161
T/SLAB EL: +601.9 T/SLAB EL: +601.9 T/SLAB EL: +601.9

10 10

LEVEL 160
LEVEL 130 LEVEL 130 LEVEL 160 LEVEL 130 LEVEL 130 LEVEL 160

LEVEL 159
8

LEVEL 159
8

LEVEL 159
Favco
7 7

SDD3/10
LEVEL 125 LEVEL 125 LEVEL 125 LEVEL 125

6 6

LEVEL 158 LEVEL 158 LEVEL 158


5 5

LEVEL 120 LEVEL 120 LEVEL 120 LEVEL 120


LEVEL 157 4
LEVEL 157 4
LEVEL 157
3 3

LEVEL 156
LEVEL 115 2 LEVEL 115 LEVEL 156 LEVEL 115 2 LEVEL 115 LEVEL 156

1 1

LEVEL 155 LEVEL 155 LEVEL 155


LEVEL 110 LEVEL 110 LEVEL 110 LEVEL 110

LEVEL 154 LEVEL 154 LEVEL 154

LEVEL 153 2nd Station LEVEL 153 LEVEL 153


LEVEL 105 LEVEL 105 LEVEL 105 LEVEL 105
LEVEL 152 LEVEL 152 LEVEL 152

LEVEL 151 LEVEL 151 LEVEL 151


S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

LEVEL 100 LEVEL 100 LEVEL 100 LEVEL 100


LEVEL 150
LEVEL 99 LEVEL 99 LEVEL 150 LEVEL 99 LEVEL 99 LEVEL 150

LEVEL 149 LEVEL 149 LEVEL 149

LEVEL 148 LEVEL 148 LEVEL 148


LEVEL 149 LEVEL 149 LEVEL 149 LEVEL 149

LEVEL 148 LEVEL 148 LEVEL 148 LEVEL 148

Cranage & Hoisting


LEVEL 147 LEVEL 147 LEVEL 147 LEVEL 147

LEVEL 145 LEVEL 145 LEVEL 145 LEVEL 145

LEVEL 143 LEVEL 143 LEVEL 143 LEVEL 143

LEVEL 142 LEVEL 142


TOP OF SPIRE
T/STEEL EL: +704.9
TOP OF SPIRE
T/STEEL EL: +704.9
LEVEL 142
TOP OF SPIRE
T/STEEL EL: +704.9
TOP OF SPIRE
T/STEEL EL: +704.9
LEVEL 142

LEVEL 141 LEVEL 141 LEVEL 141 LEVEL 141


SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE SPIRE LEVEL 8 BASE
T/STEEL EL: +691.3 T/STEEL EL: +691.3 T/STEEL EL: +691.3 T/STEEL EL: +691.3

LEVEL 140 LEVEL 140 LEVEL 140 LEVEL 140


SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE SPIRE LEVEL 7 BASE
T/STEEL EL: +681.7 T/STEEL EL: +681.7 T/STEEL EL: +681.7 T/STEEL EL: +681.7

SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE SPIRE LEVEL 6 BASE
T/STEEL EL: +668.9 T/STEEL EL: +668.9 T/STEEL EL: +668.9 T/STEEL EL: +668.9

SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2 SPIRE LEVEL 5 - MEZZANINE2
T/STEEL EL: +665.7 T/STEEL EL: +665.7 T/STEEL EL: +665.7 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1 SPIRE LEVEL 5 - MEZZANINE1
T/STEEL EL: +659.3 T/STEEL EL: +659.3 T/STEEL EL: +659.3 T/STEEL EL: +659.3

SPIRE LEVEL 5 SPIRE LEVEL 5 SPIRE LEVEL 5 SPIRE LEVEL 5

LEVEL 135 LEVEL 135 LEVEL 135 LEVEL 135


T/STEEL EL: +656.1 T/STEEL EL: +656.1 T/STEEL EL: +656.1 T/STEEL EL: +656.1

SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE SPIRE LEVEL 4 - MEZZANINE
T/STEEL EL: +652.9 T/STEEL EL: +652.9 T/STEEL EL: +652.9 T/STEEL EL: +652.9

23

SPIRE LEVEL 4 SPIRE LEVEL 4 SPIRE LEVEL 4 SPIRE LEVEL 4


22 T/STEEL EL: +646.4 T/STEEL EL: +646.4 T/STEEL EL: +646.4 T/STEEL EL: +646.4

21

SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE SPIRE LEVEL 3 - MEZZANINE
T/STEEL EL: +640.0 T/STEEL EL: +640.0 T/STEEL EL: +640.0 T/STEEL EL: +640.0

20

19 SPIRE LEVEL 3 SPIRE LEVEL 3 SPIRE LEVEL 3 SPIRE LEVEL 3


T/STEEL EL: +633.6 T/STEEL EL: +633.6 T/STEEL EL: +633.6 T/STEEL EL: +633.6

18

SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 2 - MEZZANINE2 SPIRE LEVEL 2 - MEZZANINE2
T/STEEL EL: +627.2 T/STEEL EL: +627.2 T/STEEL EL: +627.2 T/STEEL EL: +627.2
17

16

LEVEL 130 W
15
LEVEL 130
SPIRE LEVEL 2 - MEZZANINE1
T/STEEL EL: +620.8

SPIRE LEVEL 2 W
SPIRE LEVEL 2 - MEZZANINE1
T/STEEL EL: +620.8

SPIRE LEVEL 2
LEVEL 130
W
SPIRE LEVEL 2 - MEZZANINE1
T/STEEL EL: +620.8

SPIRE LEVEL 2 W
SPIRE LEVEL 2 - MEZZANINE1
T/STEEL EL: +620.8

SPIRE LEVEL 2
LEVEL 130
T/STEEL EL: +617.6 T/STEEL EL: +617.6 T/STEEL EL: +617.6 T/STEEL EL: +617.6

SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE SPIRE LEVEL 1 - MEZZANINE
14 T/STEEL EL: +614.4 T/STEEL EL: +614.4 T/STEEL EL: +614.4 T/STEEL EL: +614.4

13

LEVEL 162 / SPIRE LEVEL 1 LEVEL 162 / SPIRE LEVEL 1 LEVEL 162 / SPIRE LEVEL 1 LEVEL 162 / SPIRE LEVEL 1
T/SLAB EL: +608.0 T/SLAB EL: +608.0 T/SLAB EL: +608.0 T/SLAB EL: +608.0

12

Step 3 : Ogawa OT4520 Dismantling


11
LEVEL 161 LEVEL 161 LEVEL 161 LEVEL 161
T/SLAB EL: +601.9 T/SLAB EL: +601.9 T/SLAB EL: +601.9 T/SLAB EL: +601.9

10 10

LEVEL 160 LEVEL 160 LEVEL 160 LEVEL 160

8 8

LEVEL 125 LEVEL 159


7 LEVEL 125 LEVEL 159
7
LEVEL 159
LEVEL 125 LEVEL 159
LEVEL 125
6 6

1) Favco SDD 3/10 Re-installed on L99


LEVEL 158 LEVEL 158 LEVEL 158 LEVEL 158
5 5

LEVEL 157 4
LEVEL 157 4
LEVEL 157 LEVEL 157
3 3

LEVEL 156 2 LEVEL 156 2 LEVEL 156 LEVEL 156

1 1

2) Ogawa OT4520 Dismantled to Ground by Favco


LEVEL 155 LEVEL 155 LEVEL 155 LEVEL 155

LEVEL 120 LEVEL 154 LEVEL 120 LEVEL 154 LEVEL 154 LEVEL 120 LEVEL 154 LEVEL 120
LEVEL 153 LEVEL 153 LEVEL 153 LEVEL 153

SDD3/10
LEVEL 152 LEVEL 152 LEVEL 152 LEVEL 152

LEVEL 151 LEVEL 151 LEVEL 151 LEVEL 151

LEVEL 150 LEVEL 150 LEVEL 150 LEVEL 150

LEVEL 149 LEVEL 149 LEVEL 149 LEVEL 149

LEVEL 148 LEVEL 148 LEVEL 148 LEVEL 148

LEVEL 115 LEVEL 147 LEVEL 115 LEVEL 147 LEVEL 147 LEVEL 115 LEVEL 147 LEVEL 115
THE BURJ TOWER

LEVEL 145 LEVEL 145 LEVEL 145 LEVEL 145

LEVEL 143 LEVEL 143 LEVEL 143 LEVEL 143

LEVEL 110 LEVEL 142 LEVEL 110 LEVEL 142 LEVEL 142 LEVEL 110 LEVEL 142 LEVEL 110

Ogawa
LEVEL 141 LEVEL 141 LEVEL 141 LEVEL 141

LEVEL 140 LEVEL 140 LEVEL 140 LEVEL 140

OT4520
Step 4 : Favco SDD3/10 Dismantling
LEVEL 105
LEVEL 135

LEVEL 105
LEVEL 135 LEVEL 135

LEVEL 105
LEVEL 135

LEVEL 105

1) Favco SDD 3/10 Dismantled Manually


LEVEL 130 LEVEL 130 LEVEL 130 LEVEL 130

S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500
LEVEL 125 LEVEL 125 LEVEL 125 LEVEL 125

LEVEL 100 LEVEL 100 LEVEL 100 LEVEL 100


LEVEL 99
LEVEL 120
LEVEL 99
LEVEL 120 LEVEL 120
LEVEL 99
LEVEL 120
L99 LEVEL 99

LEVEL 115 LEVEL 115 LEVEL 115 LEVEL 115

LEVEL 110 LEVEL 110 LEVEL 110 LEVEL 110


Favco
SDD3/10
LEVEL 105 LEVEL 105 LEVEL 105
2nd Station LEVEL 105

S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1

4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

LEVEL 100 LEVEL 100 LEVEL 100 LEVEL 100


LEVEL 99 LEVEL 99 LEVEL 99 LEVEL 99
BW
B11 C11

850
0 00
85

Concrete Placement

00
B10 C10

85
850
0 00
BV 85
B9 C9

850 0
0 0
85

0
850
B8 C8
BU 850
0 0 0
85
B7 C7

0
850

850
0 0 0
85
B6 C6

Concrete Placement Method


BT
850
0 00
85

0
850
BS

0
850
BR

Level Height Pouring Method Remarks

0
850
BQ

Target Height

0
850
Ground ~ L145 531 m BP
Direct Pumping
(RC Structure)

00
85
BN

Secondary Pump on
L146 ~ L160M 624 m Re-pumping

0
850
L124 (East wing 442m)
BM

0
850
BL

L160M ~ Spire1 681.7 m Hopper by T/C From Ground Level

0
900
BK

0
900
. Concrete Pump BJ

Pumping Area
(Ground Level)
0
900

BH

Level Pressure Output Engine Remarks Pipe Lines


0
850

BG
00

2 nos. of Main
85
THE BURJ TOWER

Pump#1~#3 185 / 320 bar 71 / 36 m3/hr 470 kw


BF

1 no. of Stand by
0
850

BE

Secondary
0
850

Pump#4 220 / 260 bar BD


110 m3/hr 200 kw
Pumping
00
85

BC

CPB#4
0

. Concrete Placing Boom


850

BB
0
850

BA

- 32m boom for Center Core CPB#1 CPB#3


- 3nos. of 28m boom for Wing Core

. Pipe Lines
CPB#2
- D150mm, THK 11mm
- 5 Lines (1 for back up)
Concrete Placement
Pipe Line Schedule T.O.F Pinnacle
TIER 24 FINIAL HIGH
TIER 23 FINIAL MID
Line#1. (L160) TIER 22 FINIAL LOW

for Center Core TIER 21 SPIRE L5


TIER 20 SPIRE L4
Top of Finial : Spire
TIER 19 SPIRE L3
TIER 18 SPIRE L2
TIER 17 LEVEL 161

Line#5. (L160) L160Mezzanine : Steel Structure


TIER 16 LEVEL 158

for Back up TIER 15 LEVEL 155

TIER 14 LEVEL 151


L154 : RC Structure
TIER 13 LEVEL 147

TIER 12 LEVEL 142

Pump#4. TIER 11 LEVEL 126


(Secondary Pump on L124) Line#3. (L124)
for East Wing
TIER 10 LEVEL 112
Line#4. (L112)
Line#2. (L139) for West Wing
for South Wing TIER 9 LEVEL 99
THE BURJ TOWER

TIER 8 LEVEL 87

TIER 7 LEVEL 76

TIER 6 LEVEL 64

TIER 5 LEVEL 53

TIER 4 LEVEL 43

TIER 3 LEVEL 34

TIER 2 LEVEL 26

Pumping Area TIER 1 LEVEL 19

Pump#1~#3
TIER 0 LEVEL 7
WN2 WN1 W WS1 WS2
Concrete Placement
Re-pumping WS2 WS1 W WN1 WN2
4500 4500 4500 4500

W4

4500
Spire1
LEVEL 160 Line#5
LEVEL: Back
160 up (~L154)
(682m) W3

4500
W2
LEVEL 159 LEVEL 159

4500
Line#1 (~L154)
W1
LEVEL 158 LEVEL
S1 158 E1

Concrete Hopper S2
0 450
E2

450 0
: L160 ~ Spire1 (58m)
LEVEL 157
S3

450
0 LEVEL 157 450
0
E3

WN2 WN1 W WS1 WS2

LEVEL 156 LEVEL 156

LEVEL 155 LEVEL 155


CPB#2
CPB#1
L160 Mezzanine (624m)
THE BURJ TOWER

LEVEL SW2154 LEVEL 154 E

0
450

450
0
LEVEL 153
SW1 LEVEL 153 EN1

0
450

450
0
Direct pumping Target Height LEVEL 152 S LEVEL 152 E

450

0
: Ground ~ L145 (531m)

450
0
LEVEL 160
Secondary Pumping LEVEL 160
LEVEL 151 SE1 LEVEL 151 L124 ES1
: L142 ~ L160M (182m)

0
450

450
Secondary

0
150
LEVEL 159 SE2 LEVEL 150
159 ES2
Pumping Location
LEVEL 149 LEVEL 149
LEVEL 158 LEVEL 158 Line#2 (~L139)
LEVEL 148 LEVEL 148
LEVEL 157 LEVEL 157
L124 (442m) LEVEL 147 LEVEL 147
: Vertical Line Position
Secondary LEVEL
Pump156 LEVEL 156
LEVEL 145
LEVEL 155 LEVEL 155

LEVEL 154 LEVEL 154


LEVEL 143
LEVEL 153 LEVEL 153
Survey & Monitoring

Low Level Tower Control


• Classical Control Method

XYZ

XYZ

XYZ
THE BURJ TOWER

XYZ
Survey & Monitoring
XYZ
High Level Tower Control XYZ

GPS RTK
XYZ
XYZ

ANTENNA ANTENNA

ANTENNA
THE BURJ TOWER

REFERENCE
STATION
Survey & Monitoring
Level 146
Monitoring Program
Level 138

. Main Control Room


- Location ; B2 Level
- Plan for Integrating Raft and Survey Level 112
Monitoring Level 108

. Strain Gauge & Extensometer Level 92

- Total number ; 211EA (except Raft)


- Location Level 76
Level 72
: Outrigger Floor Level
THE BURJ TOWER

: Middle Floor Level between Outrigger Floors


Level 58
: Level 5, 16, 19, 26, 39, 43, 58, 72, 76, 92,
108, 112, 138, 146 (14 Floors)
Level 43
Level 39
. Wind Speed/Direction, Temperature, Humidity
- Location ; Level 5, 43, 76, 112, 146 Level 26

(Tower Outside) Level 19


Level 16

. Communication Control Module (CCM) Level 5

- LAN/Network Interface
THE BURJ TOWER Spire Erection
Spire Erection
Spire Erection Method

Support Beam & Lifting Equipment Installation

Lifting Block Installation & Assembling

Spire Assembly Lifting & Connection Block Erection


THE BURJ TOWER

Temporary Spire Bottom Block Engaging

Completion of Lifting

Dismantling of Temporary Spire Bottom Block


THE BURJ TOWER Spire Erection
THE BURJ TOWER
THE BURJ TOWER

Thank you !
THE BURJ TOWER
THE BURJ TOWER
Photographs
THE BURJ TOWER

22/01/2005
THE BURJ TOWER
Photographs
THE BURJ TOWER
Photographs
THE BURJ TOWER
Photographs
THE BURJ TOWER
Photographs
THE BURJ TOWER

Thank you !

Das könnte Ihnen auch gefallen