1-FABR.(ASF QC)
Inspected By
Reference Codes
EN10204 - 2004
(STAINLESS STEEL)
EN10025
NEM SPECS
ASME B30.20 (LIFTING STRUCTURE)
Applicable Procedures
Identefication Of Inspection
Points
PAINTTING PROCEDURE(ASF-PP)
HP : Hold Point
DR : Dimentional Report
MT : Magnetic Test
PT : Penetrant Test
WP : Witness Point
VR : Visual Report
HT : Hydro Test
RI :Random inspection
VT : Visual Testing
PO : Purchase Order
RD : Review Document
RT : Radiographic Test
Remarks
REV.NO.
0
DATE : 10/05/2008
PREPARED BY
Eng :
REVIEWED BY
AMR ZIDAN
Eng :
APPROVED BY
Hossam Moustafa
Eng :
SIGN :
SIGN :
SIGN :
DATE :
DATE :
DATE :
PREPARED BY:
DATE : 10/05/2008
REVIEWED BY
REV NO :0
APPROVED BY:
N
o
.
1
DESCRIPTION
Pre-inspection meeting
Procedure
Acceptance criteria
PIM agenda
Verifying document
MINUTES OF MEETING
INSP.
POINTS
SIG.
DATE
HP
INSP.
POINTS
SIG.
3
DATE
HP
INSP.
POINTS
SIG.
4
DATE
INSP.
POINTS
HP
HP
SIGNATURE ON
TRAVELLER
HP
HP
HP
HP
AWS D1.1SEC.4
HP
HP
HP/WP
HP/WP
Review / Approval OF
procedures
###
(Material&NDT&Conservation&fa
brication& painting&Repiar
procedure)
NEM ACCEPTANCE
NEM APPROVED
PROSEDURE
HP
RD
HP
HP
AWS D1.1SEC.4
VALID CERTIFICATES
HP
###
Review of Traveller
preparation of WPS &
###
Supporting PQR & weld typical
AWS D1.1
260135680.xls
RI
Remarks
SIG.
DATE
PREPARED BY:
DATE : 10/05/2008
REVIEWED BY
REV NO :0
APPROVED BY:
N
o
.
1
DESCRIPTION
Procedure
Acceptance criteria
Verifying document
INSP.
POINTS
SIG.
DATE
INSP.
POINTS
SIG.
3
DATE
INSP.
POINTS
SIG.
4
DATE
INSP.
POINTS
fabrication sequences
I
###
DT/VT
ASF-DT/ASF-VT
APPLICABLE
DWG.&NEM SPECS
SIGNATURE ON
TRAVELLER
II
HP
WP
RI
RI
###
fit up&tack weld for all boxes
APPLICABLE
DWG.&NEM SPECS
DR
HP
WP
RI
RI
reviewed wps,s
welding according to
nem reviewed wps,s
reviewed wps,s
HP
WP
RI
RI
###
VT
ASF-VT
AWS D1.1SEC.6
TRAVELLER&VT REPORT
HP
WP
RI
RI
HP
RI
RD
RD
ASF-PT
HP
RI
RD
RD
AWS D1.1-PART
6D &ASF-RT
HP
RI
RD
RD
ASF-DT / ASF-VT
APPLICABLE
DWG.&NEM SPECS
HP
HP
WP
WP
###
DT/VT
ASF-DT/ASF-VT
###
comlete welds for for all boxes
welding
6,7
DR
III
###
fit up for all boxes&tack weld
APPLICABLE
DWG.&NEM SPECS
DR
HP
WP
RI
reviewed wps,s
welding according to
nem reviewed wps,s
reviewed wps,s
HP
WP
RI
RI
###
VT
ASF-VT
AWS D1.1SEC.6
TRAVELLAR& VT REPORT
HP
WP
RI
RI
HP
RI
RD
RD
ASF-PT
HP
RI
RD
RD
AWS D1.1-PART
6D &ASF-RT
HP
RI
RD
RD
ASF-DT / ASF-VT
APPLICABLE
DWG.&NEM SPECS
HP
HP
WP
WP
###
DT/VT
ASF-DT/ASF-VT
###
comlete welds for for all boxes
welding
DR
260135680.xls
Remarks
SIG.
DATE
PREPARED BY:
DATE : 10/05/2008
REVIEWED BY
REV NO :0
APPROVED BY:
N
o
.
1
DESCRIPTION
Procedure
Acceptance criteria
Verifying document
IV
INSP.
POINTS
SIG.
DATE
INSP.
POINTS
SIG.
3
DATE
INSP.
POINTS
SIG.
4
DATE
INSP.
POINTS
###
fit up for all boxes&tack weld
APPLICABLE
DWG.&NEM SPECS
DR
HP
WP
RI
RI
reviewed wps,s
welding according to
nem reviewed wps,s
reviewed wps,s
HP
WP
RI
RI
###
VT
ASF-VT
TRAVELLER&VT REPORT
HP
WP
RI
RI
HP
RI
RD
RD
ASF-PT
HP
RI
RD
RD
AWS D1.1-PART
6D &ASF-RT
HP
RI
RD
RD
ASF-DT / ASF-VT
APPLICABLE
DWG.&NEM SPECS
HP
HP
WP
WP
###
DT/VT
ASF-DT / ASF-VT
###
comlete welds for for all boxes
welding
DR
###
fit up for all boxes&tack weld
APPLICABLE
DWG.&nem SPECS
DR
HP
WP
RI
reviewed wps,s
welding according to
nem reviewed wps,s
reviewed wps,s
HP
WP
RI
RI
###
VT
ASF-VT
TRAVELLER&VT REPORT
HP
WP
RI
RI
HP
RI
RD
RD
ASF-PT
HP
RI
RD
RD
AWS D1.1-PART
6D &ASF-RT
HP
RI
RD
RD
ASF-DT / ASF-VT
APPLICABLE
DWG.&NEM SPECS
DR
HP
HP
WP
WP
ASF-DT / ASF-VT
APPLICABLE
DWG.&NEM SPECS
SIGNATURE ON
TRAVELLER
HP
WP
RI
VT REPORT
HP
WP
RI
###
DT/VT
ASF-DT/ASF-VT
###
comlete welds for for all boxes
welding
DT/VT
###
Marking locations of studs
###
DT/VT
###
Stud welding
260135680.xls
Remarks
SIG.
DATE
PREPARED BY:
DATE : 10/05/2008
REVIEWED BY
REV NO :0
APPROVED BY:
N
o
.
1
DESCRIPTION
Procedure
Acceptance criteria
Verifying document
INSP.
POINTS
SIG.
DATE
INSP.
POINTS
SIG.
3
DATE
INSP.
POINTS
SIG.
4
DATE
INSP.
POINTS
Remarks
SIG.
DATE
###
Check delivered Liner plates cutting and drilling
Quantity,Dimension,Damage,Do
###
cument
NEM SPECS
MIR
HP
WP
HP
RI
HP
RI
NEM
ACCEPTANCE
HP
RI
HP
RI
HP
RI
RI
###
Sandblasting , painting &insulation
###
Surface preparation
###
Painting of boxes
Check cleanlness before
###
insulation
NEM
ACCEPTANCE&A
SF-PP
NEM
ACCEPTANCE&A
SF-PP
NEM
ACCEPTANCE
VI
RI
RD
NEM
ACCEPTANCE(IK NEM ACCEPTANCE
Z09-713-10)
PACKING LIST
HP
HP
HP
HP
NEM
ACCEPTANCE
NEM ACCEPTANCE
TRAVELLAR&
CERTIFICATE
HP
HP
HP
HP
NEM
ACCEPTANCE
NEM ACCEPTANCE
TRAVELLAR&
CERTIFICATE
HP
HP
HP
HP
REMARKES
1-DURING INITIAL 10%EXAMINATION,ANY WELDS ARE REGECTED,ADDITIONAL 20%OF PRODUCTION SHALL BE EXAMINED,IF THIS REVEALS AN ADDITIONAL DEFECT THEN REMAINDER OF(WELDER ,S)DAY-PRODUCTION
SHALL BE 100%EXAMINED.FIRST SUBSEQUENT(WELDER,S)BATCH SHALL BE 20%EXAMINED.
2-REPAIRS SHALL REEXAMINED BY THE SAME TECHNIQUE THAT REVEALED THE INITIAL DEFECT.
3-LIFTING AND HANGING LUG WELD SHALL BE 100%MT.
4-MATERIAL CERTIFICATES SHALL BE BUNDLED AND ACCOMPANIED BY A SUMMARIZING COVER SHEET,BEARING REFERANCE BETWEEN REQUISITION ITEM NUMBER AND HEAT / CERTIFICATE NUMBER .
5-BOILER CASING WALLS HAVE TO BE GASTIGHT.
6-WELD CROSSING AND T CROSSING WELDS 10% RT.
7-AFTER REMOVALE OF TEMPORARY WELDED ATTACHMENTS , THE AFFECTED AREA 100% MT.
260135680.xls