Sie sind auf Seite 1von 3

PT.

SHOWA ESTERINDO INDONESIA

Production Department

Date :

Prepared

Checked

Approved

Operator

G. Leader

Supervisor

Shift 3
Shift 1

Log Sheet for Local Patrol

Shift 2

EQ4PD-0006 Rev : 04
A. LOCAL PATROL FOR OPERATOR
No
1
2

Tag No.

Name / Service

HIC-7901
MS to Y-701
Level TK-334 Level TK-334

FIRST FLOOR PROCESS AREA :


C-201&C-202 Area
Tag No.
No
Name / Service
3

PI-2263

4
5
6
7
8

FI-2312
PI-2262
Current
Sealing
PI-2261

9
10
11
12
13

PI-2260
Current
Sealing
TI-2108
TI-2109

Pressure of P-202
Vibration OK or Not
AA aq To V-202
Pressure of V-202
C-202 Current
FW to C-202 Ok or Not
Pressure of P-201
Vibration OK or Not
Pressure of V-201
C-201 Current
FW to C-201 Ok or Not
From P-201 to C-201
From P-202 to C-202

Eff. Date : May 1st, 2010


Unit

Target

Min

Max

2:00

6:00

Time
10:00 14:00

Target

Min

Max

2:00

6:00

10:00

Time
14:00

17:00

22:00

0.85

1.0

2:00

6:00

10:00

Time
14:00

17:00

22:00

2:00

6:00

10:00

Time
14:00

17:00

22:00

17:00

22:00

%
m3

Unit
MPaG
T/h
MPaG
Ampere

0.5
0.85
80

75

MPaG

0.34

0.6

0.13
45

0.2
67

C
C

40
40

42
42

Unit

Target

MPaG
Ampere
o
o

Pump
No
14

Tag No.
P-113A/B

15

P-214

16

P-213

17

P-222

18

P-223

19

P-341A/B

20

P-252

21

P-241

22

P-246

23

P-242

24

P-243

25

P-231

26

P-111

Name / Service
Position A or B
Pressure
Vibration Ok or Not
Ampere
Vibration Ok or Not
Ampere
Vibration Ok or Not
Ampere
Vibration Ok or Not
Ampere
Vibration Ok or Not
Position A or B
Ampere
Vibration Ok or Not
Cooling Flow Ok or Not
Pressure
Vibration Ok or Not
Pressure
Vibration Ok or Not
Pressure
Vibration Ok or Not
Cooling Flow Ok or Not
Ampere
Vibration Ok or Not
Pressure
Vibration Ok or Not
Pressure
Vibration Ok or Not
Cooling Flow Ok or Not
Pressure
Vibration Ok or Not

Min

Max

MPaG

0.59

0.76

3.5

5.2

6.8

14.5

4.1

10.1

2.8

4.25

10

21.5

MPaG

0.35

0.57

MPaG

0.25

0.36

MPaG

0.22

0.25

7.6

14

MPaG

0.34

0.38

MPaG

0.42

0.61

MPaG

0.87

0.94

Min

Max

40
0.16

45
0.2
0.03

C-121 Area
No
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

Tag No.
TI-1148
PI-1265
PDI-1243
IGV
Current
PIA-1248**
FIA-1341**
PIA-1244**
TIA-1149**
TI-1145**
TI-1146**
TIA-1143**
TIA-1144**
PDI-1247

Name / Service
Temp. Lube Oil C-121
Lube Oil Pressure
Lube Oil DP FL-121
Opening Suction Valve
Purge Pressure
Current of C-121
Seal Gas OutPut Pressure
HP Seal Gas Inlet Flow
Lube Oil Supply Pressure
Lube Oil Supply Temp.
Main Motor Bearing Temp.(anti load side)
Main Motor Bearing Temp.( load side)
Comp.Bearing Temp.(anti load side)
Comp.Bearing Temp.( load side)

HP Seal Gas FL-123

Unit

Target

oC
MPaG
MPaG
%
kPa
3.1
Amp.
kPaG
Nm3/hr
22.5
MPaG
oC
oC
oC
oC
oC
kPa Page 1 of 4

21.8
0.16
40

110
10
23.5
0.2
45
75
75
70
70
30

PT. SHOWA ESTERINDO INDONESIA

Production Department

Date :

Prepared

Checked

Approved

Operator

G. Leader

Supervisor

Shift 3
Shift 1

Log Sheet for Local Patrol

Shift 2

EQ4PD-0006 Rev : 04
42
43

PDI-1241
FI-1342

LP Seal Gas FL-124


Seal Gas Out

MPaG
Nm3/hr

0.02
5.5

Level Gauge & Transmitter


No

Tag No.

Name / Service

Unit

Target

Min

Max
LG

44
45
46
47
48
49
50
51

LI-2435
LI-3423
LI-1432
LI-1431
LI-2401
LI-2411
LI-2421
LI-2441

V-246
V-342
V-113
T-111
T-211 B
T-221 B
T-231 B
T-251 B

%
%
%
%
%
%
%
%

70
75
45
45
70
70
70
50

68
55
43
35
50
60
65
40

72
80
47
70
90
70
80
75

Unit

Target

Min

Max

MPaG
kg/hr
kg/jam

0.135
5
40

0.130
0
30

0.140
30
50

Unit

Target

Min

Max

0.001
0.1
0.20
0.1
0.180
0.170

0.005
0.2
0.24
0.5
0.023
0.023

2:00
Trans

Eff. Date : May 1st, 2010


Time
10:00
17:00
LG
LG
Trans
Trans

Others
No
52
53
54

Tag No.
PI-2284
FI-2346
Water rotameter

Name / Service
V-246 Pressure
T-211 top liq draw off
P-214 /PW to V-132

2:00

6:00

10:00

Time
14:00

17:00

22:00

2:00

6:00

10:00

Time
14:00

17:00

22:00

2:00

6:00

10:00

Time
14:00

17:00

22:00

2:00

6:00

10:00

Time
14:00

17:00

22:00

2:00

6:00

10:00

Time
14:00

17:00

22:00

2:00

6:00

10:00

Time
14:00

17:00

22:00

2:00

6:00

10:00

Time
14:00

17:00

22:00

Others
No
55
56
57
58
59
60
61
62
63
64

Tag No.
PI-2281
FI-2339
PI-3261
PI-2290
PI-2267
PI-2255
TI-2137
FI-2311
PI-1211

Name / Service
V-242 Pressure
PW to V-242 Scrubber
V-341 Pressure
V-252 Pressure
V-222 Pressure
V-213 Pressure
H-109 Water Spray Plug or Not
H-217 out Temperature
Blow Off V-202 To T-111(Local)
Local setting (Reactor Pressure)

MPaG
T/H
MPaG
Kpa
MPaG
MPaG

0.1
0.22

o
C
kg/hr
MPaG

41
0.4

0.935

Min

Max

0.05
0.02
0.05
0.6
0.6
0.2

0.15
0.04
0.125
1
1.6
0.4

Target

Min

Max

MPaG
Kpa

1.2

0.9
1.0

1.5
1.4

Unit

Target

Min

Max

Reboiler Steam Pressure


No
65
66
67
68
69
70

Tag No.
PI-2294
PI-2273
PI-2270
PI-2258
PI-1282
PI-1252

Name / Service
MS Pressure to H-251
LS Pressure to T-231
LS Pressure to H-221
MS Pressure to H-211
MS Pressure to H-131
MS Pressure to H-102

Unit

Target

MPaG
MPaG
MPaG
MPaG
MPaG
MPaG

Third Floor Process area


No
71
72

Tag No.
PI-1253
PIC-0208

Name / Service
MS Pressure to H-103
NO set point

Unit

PW Area
No
73
74

Tag No.
LI-6413
LI-6412

Name / Service
Level of TK-625
Level of TK-624

Meter
Meter

2.5
3.0

PA/IA Unit Area


No

Tag No.

75
76
77
78
79

TI-5112/3
Switch C-551
Current
Pdi-5283
Pdi-5284

CW Area
No
Tag No.
80
81
82
83

Switch P-651
Current
Stroke
FI-1342

Name / Service
Jacket Temperature
Position A or B
Current of C-551 A/B
DP of FL-561
DP of FL-562 A/B
Name / Service
Position A or B
P-651
P-661 Stroke
CW Blow Down

Unit

Target

oC
A/B
Ampere
Psi
Psi
Unit

Target

A/B
Ampere
30-31
mm
T/h
Page 2 of 4

Min

Max

140

175

72
0
0

87
5
5

Min

Max

35
3

PT. SHOWA ESTERINDO INDONESIA

Production Department

Date :

Prepared

Checked

Approved

Operator

G. Leader

Supervisor

Shift 3
Shift 1

Log Sheet for Local Patrol

Shift 2

EQ4PD-0006 Rev : 04

Tank Yard
No
Tag No.
84

FI-3301

Flare Stack
No
Tag No.
85
Y-701

Tank Leakage
No
Tag No.

Name / Service
FW to T-301

Name / Service
FW to Y-701 valve
Level Y-701
Black smoke of Flare stack

Unit

Target

Min

Max

T/hr

0.03

0.03

0.15

2:00

6:00

Time
10:00

6:00
Y/N

Time
10:00
Y/N

Target

14:00

22:00

No Smoke

Name / Service

TK-333
TK-301
TK-541
TK-401
TK-501
TK-502

6:00

Open
Normal

2:00
Y/N
86
87
88
89
90
91

2:00

Eff. Date : May 1st, 2010


Time
17:00
10:00 14:00
22:00

14:00
Y/N

16:00
Y/N

Any leakage
Any leakage
Any leakage
Any leakage
Any leakage
Any leakage
Y = any leakage
N = no leakage

Redeco area
Tag No.
No
92
93

LI-4403
LI-3418

Name / Service
Level of TK-501
Level of TK-502

Unit

Normal

M3
M3

Formula for TK-501 & TK-502


TK-501 = M3 = 120.7016 X - 1.905
TK-502 = M3 = 179.1151 X - 8.113

Min

Max

90
80

1458
2159

Time
6:00

X = LG + 0.222 (meter)
X = LG + 0.227 (meter)

BR 504
No

Tag No

Name / Service
Wi

94
95
96
97

2:00
x

Master Controll/ manual


Waste Gas I (V-202)/ auto
Waste Gas 2 (T-211)/ manual
Load

Page 3 of 4

Wi

Time
10:00
x

Wi

19:00
x

Das könnte Ihnen auch gefallen