INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW FORM

(For Principals/School Heads)


Division of Digos City

Name of Employee
Position
Rating Period
School/District

:
:
:
:

____________________________________________
____________________________________________
____________________________________________
____________________________________________

Name of Rater
Position
Date of Review

: ___________________________________________
: ___________________________________________
: ___________________________________________

TARGET
MFO

KRA/Weight

OBJECTIVES

Delivery of
Basic

Instructional

1.

Leadership

supervisory plan on 3rd-4th week of

Education

-40%

Services

Prepare school year instructional

Accomplishments

TIMELINE

WEIGHT
PER
OBJECTIVE

May

5%

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)

MOVs

May within a rating period


Supervisory plan contains the
following areas:

a.

Plan was needs based

Supervisory Plan

a.) Class Observation

b.

Objectives were attainable

TLOC

b.) Checking of Forms

c.

Objectives were well-defined

Supervisory Tools

c.) Checking of LPs/ Different DepED

d.

Plan was developed with teachers

Checklist

progams
d.) Monitoring of different DepED

e.

Monitoring and evaluation scheme


was defined in the plan

programs
e.) Monitoring of School initiated
intervention

(5) All indicators were met without any

revision and submitted ahead of

- NAT review

schedule

-Reading Recovery/LIP
-ADM
f.) Conduct of Spot Test

(4) All indicators were met with minor


revision and submitted ahead of
schedule
(3)All indicators were met with minor
revision and submitted on schedule.
(2) All indicators were met with major
revisions and submitted behind
schedule
1

Spot Test Results


Action/

Inbtervention
Plans

Actual
Results

Score

Rating

TARGET

MFO

KRA/Weight

OBJECTIVES

TIMELINE

Accomplishments

WEIGHT
PER
OBJECTIVE

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)

MOVs

(1) Less than 4 indicators were met with


major revisions and submitted behind
schedule

2.) Observe at least 10 teachers in


a month observing the categories

June - Dec

7%

(5) Observed 130% and above of the


targetted number of teachers

below:
(4) All indicators were met without

year/ teacher

STAR Notes

revision and submitted ahead of


schedule.
(3) Observed 100%- 114% of the targetted
numbers of teachers.

21-25 teachers observe 3 times a


year/ teacher
26- 49 teachers observe 2 time a

(2) Observed 51 - 99% of the targetted

year/teacher

number of teachers.

50 - above teachers observe once a

(1) Observed 50% -below of the targetted

year/teacher

numbers of teachers.
5%

forms of teachers with the following

(5) Inspected 130% and above of the


targetted percentage of DLL and

frequencies:

school forms.

3.1) DLL - weekly

(4) Inspected 115-129% of the targetted

3.2) School Forms - Monthly

percentage of DLL and school forms.

3.3) Form 137 & 138 - Quarterly

(3) Inspected 100%- 114% of the targetted

3.4) Other forms - as needed

percentage of DLL and school forms.

(Note: Items 3.1, 3.2, 3.3 & 3.4 shall

(2) Inspected 51% -99% of the targetted

be rated individually. Sum of the


ratings for 3.1, 3.2, 3.3 & 3.4 shall
be divided by 4 to get the

percentage of DLL and school forms.

average rating.)

Notes, CB-PAST
Form 3A

5-15 teachers observe 5 times a

3. Inspect 75 % of DLL and school

Observation

(1) Inspected 50% -below of the targetted


percentage of DLL and school forms.

Checklist

STAR observation

Actual
Results

Score

Rating

2
TARGET
MFO

KRA/Weight
4.)

OBJECTIVES

TIMELINE

Improve pupils learning outcome


targetting the following:

JuneMarch

4.1) 2% increase in NAT VI and

Accomplishments
WEIGHT
PER
OBJECTIVE
(8%)

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)

(5) Achieved 130% and above of the

MOVs
NAT Results

targetted percentage in NAT.


2%

Year IV over that of the


previous year

(4) Achieved 115-129% of the targetted


perentage in NAT
(3) Achieved 100 - 114 % of the targetted
percentage in NAT.
(2) Achieved 51-99% of the targetted
percentage in NAT.
(1) Achieved 50% of the targetted
percentage in NAT.
(5) Attained 130% and above of the
targetted percentage of pupils/
students
(4) Attained 115-129% of the targetted
percentage of pupils/students.
(3) Attained 100 - 114% of the targetted
percentage of pupils/students.
(2) Attained 51 - 99% targetted
percentage of the pupils/students.
(1) Attained 50% -below targetted
percentage of pupils/students.

4.2) General Scholastic Average

JuneMarch

3%

(5) Achieved 130% and above of the

Periodic Test

targetted percentage of students/puipls


(4) Achieved 115-129% of the targetted

Results/MPS
Promotional Report

percentage of students/pupils.
(3) Achieved 100 - 114 % of the targetted
percentage of students/pupils.
(2) Achieved 51-99% of the targetted

Grading Sheets

Actual
Results

Score

Rating

percentage of students/pupils.
(1) Attained 50% -below targetted
percentage of pupils/students.
3
TARGET
MFO

KRA/Weight

OBJECTIVES
4.3) Reading:

TIMELINE

Accomplishments
WEIGHT
PER
OBJECTIVE
3%

75% of Grade I and II pupils shall be

Phil-IRI Results

(4) Attained 115-129% of the targeted

75% of the year I to IV students shall be

percentage of students/pupils.

instructional readers in English and


Filipino
75% of the year I to IV students shall

(3) Attained 100 - 114% of the targetted


percentasge of students/pupils.
(2) Attained 51 - 99% of the targetted

be instructional readers in both

percentage of students/pupils
(1) Attained 50% -below of the targetted
percentage of students/pupils.

English and Filipino


Performance Indicators

(5) Attained 130% and above of the

MOVs

targetted percentage of students/pupils

instructional readers in Mother Tongue

5.

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)

7%

5.1 2% increase on Enrolment rate


5.2. 2% decrease on Drop-out rate

(5) Attained 115 - 129% of the targetted BEIS


increase/deacrease for each of the
perfromance indicator.

5.3) 2% increase on Retention Rate

(4) Attained 115 - 129% of the targetted

5.4) 2% increase on Survival rate

increase/deacrease for each of the


perfromance indicator.
(3) Attained 100 - 114% of the targetted
increase/decrease for each of the
performance indicator.
(2)Attained 51 - 99 % of the targetted
increase/decrease for each of the
performance indicator.
(1) Attained 50% -below of the targetted
increase/decrease for each of the
performance indicator.
4

Actual
Results

Score

Rating

TARGET
MFO

KRA/Weight

OBJECTIVES
6.

Participate 75% of academic and

non-academic competitions in the

Accomplishments

TIMELINE

WEIGHT
PER
OBJECTIVE

June-

4%

April

district/cluster level/or division level for

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)
(5) Attained 130% and above of the

Certificate of

targetted percentage of events per

Participation

competitions

Pictorials

compettions without any district/cluster

(4) Attained 113 - 129 % and above of the

level observing the following:


Small schools = 10 teachers and below =

targetted percentage of events per


competitions.

25 % of all the events per competition to

(3) Attained 100-114% of the targetted

participated in

MOVs

Memoranda

percentage of events per competition.

Big Schools = 31 teachers and up = 75%

(2) Attained 51 - 99% of the targetted

of events per competition to be

percentage of events per competition.

participated in

(1) Attained 50% -below of the targetted


percentage of events per competition.
5 - National Level
4- Regional Level
3- Division Level
2- Distrcit Level
1- School Level
(Note: Rating here shall be based on the
highest awards received regardless of
number of awards received.)

7. Obtain academic and co-

June-

curricular awards

April

4%

Awards received:
5- National Level
4- Regional Level
3- Division Level

Certificates
Pictorials

Actual
Results

Score

Rating

2- District Level
1- School Level
(Note: Rating here shall be based on the
highest awards received regardless of
number of awards received.)
5
TARGET
MFO

Accomplishments

TIMELINE

WEIGHT
PER
OBJECTIVE

1. Manage the school plant, physical

May-

5%

Environment

fitness facilities, safety and sufficient

April

10%

with the assistance of specialists twice a year.

KRA/Weight
Learning

OBJECTIVES

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)

MOVs

a. Prepared updated inventory of school

Inventory Reports

facilities for Beginning and End of

Records of school

b.

School Year
Identified/Prioritized facilities needed
by the school

c.

Acquired/ Purchased needed


facilities
d. Kept records of inventories of school

property
Liquidation Reports
ARE/ICS/
Stock Card

facilities
5- All indicators were met
4- 3 indicators were met
3- 2 indicators were met
2- 1 indicator was met
1- No indicator was met
2.

Implement 75% of the DepEd


programs and projects

MayApril

5%

(5 ) Implemented 130 and above of the

Accomplishment

identified DepEd programs and projects

Report/

Child Friendly Programs

supported with evidences such as school

Documentation/

GPP

policy reports, information materials,

Pictorial

Tree Planting

advocacy activities, regular meetings

Action Plans

- Brigada Eskwela (Adopt a School)


-

Feeding Program

WATCH

and inventory.
(4)Implemented 115 - 129% of the
identified DepED programs and projects

Actual
Results

Score

Rating

DRRM

supported with evidences such as policy

Solid waste and Management

reports, information materials, advocacy

ICT Program

activities, regular meetings and inventory

Peace Education

ALIVE/MADRASAH

identified DepED programs and projects

IPEd

supported with evidences such as policy

(3) Implemented 100 - 114% of the

6
TARGET
MFO

KRA/Weight

OBJECTIVES

TIMELINE

Accomplishments
WEIGHT
PER
OBJECTIVE

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)

ADM

reports, information materials, advocacy

Regular Program

activities, regular meetings and inventory.

Special Program (SSES)

MOVs

(2) Attained 50% -below of the

Health and Nutrition Program

identified DepED programs and projects

Canteen

supported with evidences such as policy

APPES

reports, information materials, advocacy

Campus Journalism

activities, regular meetings and inventory.


(1) Attained 50% -below of the
identified DepED programs and projects
supported with evidences such as policy
reports, information materials, advocacy
activities, regular meetings and inventory.

Human Resource

1. Assess training needs of 75% of

May-

3%

a. Conducted training needs assessment

IPPD/SPPD

Actual
Results

Score

Rating

Management and

teachers.

using NCBTS Tool

October

Development

NCBTS-TSNA

b. Analyzed the Training Needs Assessment

(20%)

Result
c. Prepared School Plan for Professional
Development (SPPD)
d. Implemented School Plan for Professional
Development (SPPD)
e. Utilized and compiled data
(5) All indicators were met with complete
documents
(4) 4 indicators were met with supporting
documents
(3) 3 indicators were met with supporting
documents
(2) 2 indicators were met with supporting
documents
7
TARGET

MFO

KRA/Weight

OBJECTIVES

TIMELINE

Accomplishments
WEIGHT
PER
OBJECTIVE

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)

MOVs

(1) 1 indicator was met with supporting


documents
2. Provide technical assistance and or
introduces innovations to 50% of the
identified teachers on matters pertaining
to enhancement of classroom management
to enhancement of classroom
management skills and instructional
competence using NCBTS, IPCR and
IPPD.

June March

3%

(5 ) Provided technical assistance/


innovations to 130 % and above of the
identified teachers with concerns on classroom management skills and instructional

IPPD/SPPD
TLOC
Conference Notes

competence using NCBTS, IPCR and IPPD.


(4 ) Provided technical assistance/
innovations to 115 - 129 % and above of the

identified teachers with concerns on


classroom management skills and instructional

Actual
Results

Score

Rating

competence using NCBTS, IPCR and IPPD.


(3) Provided technical assistance/
innovations to 100 -114 % and above of
the identified teachers with concerns on
classroom management skills
and instructional competence using
NCBTS, IPCR and IPPD.
(2) Provided technical assistance/
innovations to 51 - 99 % and above of
the identified teachers with concerns on
classroom management skills
and instructional competence using
NCBTS, IPCR and IPPD.
(1) Provided technical assistance/innovations
to 50% and below of the identified teachers
with concerns on classroom management
skills and instructional competence using
NCBTS, IPCR and IPPD.
8

TARGET
MFO

KRA/Weight

OBJECTIVES
3.) Prepare and implement equitable
teaching loads and anicillary
assignement

TIMELINE
MayJune

Accomplishments
WEIGHT
PER
OBJECTIVE
2%

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)
a. Assigned teachers according to
specialization/skills.
b. Assigned equitable teaching loads to
teachers.
c. Submitted class program before the start
of classes
d. Make summary of loads before the start
of classes
e. Submitted summary of loads before the

MOVs
Form 7
Memorandum for
designations
Class program

Actual
Results

Score

Rating

start of classes
(5) All indicators were met.
(4) 4 indicators were met.
(3) 3 indicators were met.
(2) 2 indicator swere met.
(1) 1 indicator was met.
4.) Conduct/initiate at least 2 schoolbased training.

May-

3%

April

a. Followed design of training.

Training Design

b. Used appropriate training materials/

Attendance sheet

equipment/technology.
c. Included the service of experts in the

Narrative report
Pictorials

subject area.
d. Encouraged active trainers/group
participation.
e. Evaluated results of training.
f. Used the adult learning strategies
g. Acted as training facilitator/
9

TARGET
MFO

KRA/Weight

OBJECTIVES

TIMELINE

Accomplishments
WEIGHT
PER
OBJECTIVE

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)

MOVs

(5) All indicators were met.


(4) 5 indicators were met.
(3) 4 indicators were met.
(2) 3 indicators were met.
(1) 1 or 3 indicators were met.
5.) Assess teachers' performance twice
twice in a school year.

May
October

3%

a. Teacher was oriented on the process of


targetting/rating.

minutes of
meeting

b. Performance targets were discussed and

Attendance

agreed upon
c. periodic meeting, (semestral) was
conducted to monitor status of

sheet
Copy of
agreement

Actual
Results

Score

Rating

performance based on targets


d. Self-rating of ratee was discussed and

Conference
notes

appraised against targets and


accomplishments.
e. Agreement of rating was arrived at.
(5) All indicators were met.
(4) 4 indicators were met.
(3) 3 indicators were met.
(2) 2 indicators were met.
(1) 1 indicator was met.
6.) Conduct 1 action research in a year.

MayApril

3%

Conducted a school action research and was


undertaken using the following steps:
a. Preparation of design
b. Conducting the research
c. Managing the data

Action Research

10
TARGET
MFO

KRA/Weight

OBJECTIVES

TIMELINE

Accomplishments
WEIGHT
PER
OBJECTIVE

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)
d. Analyzing the data.
e. Disseminating the data.
f. Utilizing the results
(5) All indicators were met and submitted
ahead of schedule.
(4) All indicators were met and submitted
on schedule
(3) 4-5 indicators were met and submitted
on schedule
(2) 2-3 indicators were met and submitted
behind the schedule.
(1) 1 indicator was met and submitted
behind schedule.

MOVs

Actual
Results

Score

Rating

7. Observe punctuality, attendance and

Jan.- Dec

3%

good grooming

* As reflected in DTRs/Form 7
(5) Not more than 4 days absent

DTR, Checklist
Form 7

(4) 5-8 days absent

Observation

(3) 9-12 days absent

journals,

7.1.2 in handling classes

(2) 13-16 days absent

attendance,

7.1.3 in attending activities called

(1) more than 16 days absent

hospitalization

7.1 Attendance
7.1.1 as reflected in the DTR

for (wellness programs, meeting, etc.)

bills/abstract

7.1.4 Flag Raising/Lowering

* Attendance to classes/activities called


for/Flag Raising/Flag Lowering, etc.
5 - Not more than 4 time absent
4 - 5-8 times absent
3- 9 -12 times absent
2-13-16 times absent
1- more than 16 times absent
11
TARGET

MFO

KRA/Weight

OBJECTIVES

TIMELINE

WEIGHT
PER

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)
* Attendance to classes/activities called
for/Flag Raising/Flag Lowering, etc.
5 - Not more than 4 time absent
4 - 5-8 times absent
3- 9 -12 times absent
2-13-16 times absent
1- more than 16 times absent
(5) Not more than 3 times tardy/undertime

7.2. Punctuality

during the last 10 months/during meetings


-in coming to school
or other activities.

-in attending classes


-in attending activities

called for

(4) 4-6 times tardy/undertime during the


last 10 months/during meetings or other

- in preparing/submitting required
documents

activities.

MOVs

Accomplishments
Actual
Score
Rating
Results

(3) 7-10 times tardy/undertime during


the last 10 months/during meetings or
other activities.
(2)11-15 times tardy/undertime during the
last 10 months/during meeitngs or other
activities.
(1) more than 15 times tardy/undertime
during the last 10 months/during meetings
or other activities

7.3. Good Grooming


(5) Less than 4 times not in proper attire

(Comply with the prescribed uniform

uniform within the rating period

from Monday to Thurday as reflected

Observations,
Journals/STAR

(4) 4 -6 times not in proper uniform/attire

in DepED Order No. 7, s. 2013; and

within the rating period.

wearing of a decent/modest attire on


12
TARGET
MFO

KRA/Weight

OBJECTIVES

TIMELINE

Accomplishments
WEIGHT
PER
OBJECTIVE

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)

MOVs

(3) 7-10 times not in proper uniform/attire


Friday. If wearing a t-shirt, it should
within the rating period.

be with collar. Wearing of IDs is

(2) 11 - 15 times not in proper uniform/

indispensably included.)

attire within the rating period.


(1) more than 15 times not in proper
uniform/attire within the rating period.

Parents'
Involvement

1. Establish school and family


community partnership for school

and

performance.

MayApril

2%

a. Has stakeholders partnership/


mobilization plan
b. Implemented mobilization plan with

Action plan
Narrative Report
Pictorials

Actual
Results

Score

Rating

Community

reports and documentations.

Partnership

c. Organized programs with stakeholders

(5%)

Copies of school
policies

especially parents for academic and other

Formulated

purpose

Deed of donation

d. Formulated school policies.


e. Obtained resources for school through
stakeholders partnership.
(5) All indicators were met.
(4) 4 indicators were met.
(3) 3indicators were met.
(2) 2 indicators were met.
(1) 1 indicator was met.
2. Register 20% of the students for GSP/

June - Oct

1%

(5) 130% and above of the targetted

Registration form

percentage of pupils/students registered

BSP/RCYC

in BSP/GSP/RCYC/etc.

13
TARGET
MFO

KRA/Weight

OBJECTIVES

TIMELINE

Accomplishments
WEIGHT
PER
OBJECTIVE

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)
(4) 115 - 129% of the targetted percentage
of pupils/students registered in BSP/GSP/
RCYC/etc.
(3) 100 - 114% of the targetted percentage
of pupils/students registered in BSP/GSP/
RCYC/etc.
(2) 51 - 99% of the targetted percentage

MOVs

Actual
Results

Score

Rating

of pupils/students registered in BSP/GSP/


RCYC/etc.
(1) 50% or below of the targetted percentage
of pupils/students registered in BSP/GSP/
RCYC/etc.
3.ManagelinkagewithGOs/NGOs
to school activities.

May-

2%

April

ManagementoflinkagewithGOs/NGOs

Programs

to school activities was achieved when:

Pictorials,

a.TheinvolvementofGOs/NGOsto

Narrative

school activities was elicited

Report

b.CollaborativerelationwithGOs/
NGOs was sustained
c.

The community and other link groups


were informed of school performance/

d.

activities
The support/contribution of link
groups/ partners was acknowledged

(5) All indicators were met


(4) 3 indicators were met
(3) 2 indicators were met
(2) 1 indicator was met
(1) No indicator was met
14
TARGET
MFO

KRA/Weight

OBJECTIVES

School

1. Revisit the SIP and initiate the

Leadership
Management and
Operations
(25%)

preparation and/or revision of AIP at the


AIP/APP with the stakeholders at least
once a year

Accomplishments

TIMELINE

WEIGHT
PER
OBJECTIVE

April

4%

October

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)
a.

Conducted a school strategic plan

through strategic planning process


All school stakeholders were engaged in
the strategic planning process
c. Use monitoring and evaluation for process
b.

MOVs
Minutes of
planning conference
Attendance Sheet
Monitoring forms
Evaluation sheets

Actual
Results

Score

Rating

and basis for revision of the SIP/AIP/APP


(5) All indicators were met with minor
revisions and submitted SIP/AIP/APP

Accepted SIP
Approved
AIP/APP

ahead of schedule.
(4) All indicators were met and submitted
SIP/AIP/APP with minor revision and
submitted on schedule
(3) All indicators were met with major
revision and submitted on schedule
(2) All indicators were met and submitted
behind schedule.
(1) Less than 3 indicators were met and
submitted behind schedule.
(5) 100% of the activities stipulated in the
2.

Implement and monitor the

May-

utilization of the SIP/AIP/APP

April

Accomplishment

5%
SIP/AIP/APP were implemented and

report

supportedwithcompleteMOVs

Narrative Report

(4) 90% of the activities stipulated in the

Pictorials

SIP/AIP/APP were implemented and


supported by complete MOVs
(3) 75% of the activities stipulated in the
SIP/AIP/APP were implemented and
supported with complete MOVs.
15
TARGET
MFO

KRA/Weight

OBJECTIVES

TIMELINE

Accomplishments
WEIGHT
PER
OBJECTIVE

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)
(2) 50% of the activities stipulated in the
SIP/AIP/APP were implemented and

MOVs

Actual
Results

Score

Rating

supported with complete MOVs.


(1) Less than 50% of activities stipulated in
the SIP/AIP/APP were implemented and
supported with complete MOVs.
3. Perform fiscal management
functions monthly

January-

(5) Claimed MOOE allocation for 12 months


in a fiscal year.

December

A. Claim of MOOE

2%

Liquidation Reports

(4) Claimed MOOE allocation for 10-11


months in a fiscal year
(3) Claimed MOOE allocation for 7-8
months in a fiscal year
(2) Claimed MOOE allocation for 4-6
months in a fiscal year
(1) Claimed MOOE allocation for 1-3
months in a fiscal year

B. Liquidation of MOOE

2%

(5) Liquidated MOOE on or before due date.

Liquidation Reports

(4) Liquidated MOOE 1 week after the due


date
(3) Liquidated MOOE 2 weeks after the due
date
(2) Liquidated MOOE 3 weeks after the due
date
(1) Liquidated MOOE more than 3 weeks
after the due date
16

TARGET
MFO

KRA/Weight

OBJECTIVES
4. Allocate MOOE and other school

TIMELINE

Accomplishments
WEIGHT
PER
OBJECTIVE
3%

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)
a. With clear financial management

MOVs
Liquidation Reports

Actual
Results

Score

Rating

funds in accordance to mandated

system for the school supported with

Stock Card/RIS/

expenditures and priority needs.

evidences such as reports, account logs

ARE

and data base systems

Distribution List

b. Allocated/ prioirtized funds for programs


and school facilities, improvement and
maintenance.
c. Monitored, accounted and reported
utilization of school funds
d. Reported sources and uses of funds.
(5) All indicators were met
(4) Three indicators were met.
(3 ) Only two indicators were met
(2) Only one indicator was met
(1) None of the indicators was
accomplished
5.

Prepare and submit 75% of required


reports on time.

JanuaryDecember

3%

(5) 130% and above of required reports

File copies

were submitted on time.


(4) 115 - 129% of required reports were

of Reports

submitted on time.
(3) 100 - 114% of required reports were
submitted on time.
(2) 51 - 99% of required reports were
submitted on time.
(1) 50% -below of required reports were
submitted on time.
6.

Manage the utilization of the 75% of

data in the Education Management

January-

4%

Management of the Educational

Updated EMIS

Management Information System included:

December

a.

Information System

Organizing data

17
TARGET

Accomplishments

MFO

KRA/Weight

OBJECTIVES

TIMELINE

WEIGHT
PER
OBJECTIVE

PERFORMANCE INDICATOR (Quality,


Efficiency, Timeliness)
b.

Updating of data

c.

Establishing profile from data gathered

d.

Disseminating data

e.

Utilizing data

MOVs

(5) All indicators were done


(4) 4 indicators were done
(3) 3 indicators were done
(2) 2 indicators were done
(1) Only 1 indicator was done
7. Resolve 75% of the school conflict.

JanuaryDecember

2%

Conflict was managed when:

Copy of complaints,

a.

School complaint/grievance committee

Minutes of

organized

Coferences

Issues/problems/concerns were acted

Memorandum for

b.

on time
c.
d.

Facts were gathered and verified

Grievnace

Parties were encouraged to discuss

Committee

differences to arrive at a settlement


e.

Designation as

Members

Appropriate action was taken

(5) All indicators were met or there is


no conflict
(4) 4 indicators were met
(3) 3 indicators were met
(2) 2 indicators were met
(1) Only 1 indicator was met
Overall Rating

Actual
Results

Score

Rating

Rater

Ratee

The Individual Performance Commitment and Review (IPCR) Guide was formulated by the assigned Focus Groups in consideration to the comments
suggestions, and recommendations of the teachers and school/district/division officials collected through consultative conferences done within the Division
Focus Group: IPCR for Principals
Chairperson:

LUZMINDA B. JASMIN

Members:

ELY CATALUA
ANTONIA S. JUMAWAN
JOAN M. NIONES

Recommending Approval:
OLIVA P. MIRANDA
Officer-in-Charge
Office of the Assistant Schools Division Superintendent

Approved:
RECOLITO Y DE LOS REYES, Ed. D.
Schools Division Superintendent