0 Low leval Bailance Tank


1 High leval Bailance Tank
2 long Stop Signal From Filler
3 Cip Request
4 Water Feed From Buielding Room
5 Hoter Acept
6 Emergency stop
7 air pressure low
8 skan pressure low switch
9 production request
10 reqest rinse
11 CIP Drain Request
12 Sever Tank Low Level
13 Sever Tank High Level

0 solenoid valve-1
1 solenoid valve-2
2 solenoid valve-3
3 solenoid valve-4
4 solenoid valve-5
5 feed pump
6 hot water pump
7 process water pump
8 process indication
9 cip indication
10 end of production
11 temp. achived