obra
Cliente
Contratista;
Lugar
REPRESAMIENTO DE LA LAGUNA DE QUEULLACCOCHA Y RIEGO POR ASPERSION CHAPIMARCA-COTAHUARCAY, DISTRITO CHUQUIBAMBILLA, PROVINCIA GRAU - APURIMAC
GOBIERNO REGIONAL DE APURIMAC
CONSORCIO SAN CARLOS
DISTRITO CHUQUIBAMBILLA, PROVINCIA GRAU - APURIMAC
Item
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
MES 1
03 Abr. 2014
30 Abr. 2014
01
01.01
01.02
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 2.4M X 4.0M.
CAMPAMENTO PROVISIONAL DESMONTABLE
und
mes
3.00
12.00
770.00
955.00
13,770.00
2,310.00
11,460.00
2,310.00
11,460.00
02
02.01
02.01.01
km
17.76
614.14
547,497.13
10,907.13
10,907.13
10,907.13
18.00
80.00
536,590.00
256,590.00
280,000.00
25,659.00
28,000.00
02.02
02.02.01
02.02.02
03
03.01
03.01.01
03.01.02
EXPLANACIONES
CONSTRUCCION DE CAMINO DE ACCESO EN TERRENO NORMAL
CONSTRUCCION DE CAMINO DE ACCESO EN TERRENO ROCOSO
PRESA QUEULLACCOCHA
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
CONTROL ALTIMETRICO ACCESO Y PRESA
m
m
14,255.00
3,500.00
m2
mes
7,890.00
5.00
1.60
4,000.00
1,994,958.83
32,624.00
12,624.00
20,000.00
03.02
03.02.01
03.02.02
m3
m3
12,890.00
12,890.00
5.80
14.50
261,667.00
74,762.00
186,905.00
03.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
03.03.06
03.03.07
ENROCADO DE PRESA
LLENADO Y COLOCADO DE GAVIONES TIPO COLCHON 5.0x3.0x0.30 M
HABILITADO DE BOLONERIA DE ROCA PARA ENROCADO DE PRESA
ENROCADO PIEDRA GRANDE (PRESA)
TRANSPORTE PIEDRA VOLQUETE 10M3 D < 1KM
EMBOQUILLADO CON MORTERO MEZCLA C:A 1:3
SUMINIST. Y COLOCA. GEOTEXTIL
SUMINIST. Y COLOCA. GEOMEMBRANA
m3
m3
m3
m3
m2
m2
m2
400.00
25,990.00
25,990.00
25,990.00
5,920.00
4,400.00
4,400.00
118.40
21.00
7.40
14.40
23.00
10.00
10.00
1,383,892.00
47,360.00
545,790.00
192,326.00
374,256.00
136,160.00
44,000.00
44,000.00
03.04
03.04.01
03.04.02
03.04.03
03.04.04
03.04.05
TOMA DE TUBERIA
CONCRETO FC=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
ACERO GRADO 60
REJILLA DE INGRESO (SEGUN DISEO) INCLUYE COLOCACION
TUBERIA FG PESADO C-40 8" I/ELEM.UNION+ 2%DESP. (INC. SUMIN
m3
M2.
KG.
und
m
5.00
22.00
235.00
1.00
90.00
405.64
25.28
4.08
408.20
241.11
25,651.26
2,028.20
556.16
958.80
408.20
21,699.90
03.05
03.05.01
CASETA DE VALVULAS
CONCRETO F'C=140 KG/CM2 +30% P.G. PARA CIMIENTOS CORRIDOS
03.05.02
03.05.03
03.05.04
03.05.05
03.05.06
03.05.07
03.05.08
03.05.09
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.06.01.05
03.06.01.06
03.06.01.07
03.06.01.08
03.06.01.09
03.06.01.10
03.06.02
03.06.02.01
03.06.02.02
03.06.02.03
03.06.02.04
03.06.02.05
03.06.02.06
03.06.02.07
03.06.02.08
03.06.02.09
03.06.02.10
03.06.02.11
03.06.02.12
03.06.03
03.06.03.01
03.06.03.02
03.06.03.03
03.06.03.04
03.06.03.05
03.06.03.06
03.06.03.07
03.06.03.08
03.06.03.09
03.06.03.10
03.06.03.11
03.06.03.12
03.07
03.07.01
04
04.01
04.01.01
04.01.01.01
04.01.01.02
04.01.01.03
04.01.01.04
04.01.01.05
04.01.01.06
04.01.01.07
04.01.01.08
MES 7
1 Oct. 2014
31 Oct. 2014
MES 11
01 Feb. 2015
31 Feb. 2015
12,624.00
20,000.00
37,381.00
93,452.50
37,381.00
93,452.50
136,447.50
93,564.00
136,447.50
76,930.40
93,564.00
23,680.00
136,447.50
57,697.80
93,564.00
40,848.00
23,680.00
136,447.50
57,697.80
93,564.00
40,848.00
44,000.00
44,000.00
54,464.00
2,028.20
556.16
958.80
408.20
21,699.90
12,826.10
2,163.04
1,137.60
1,428.00
4,891.68
91.18
411.91
473.56
1,321.86
907.27
m2
m3
M2.
M3.
KG.
M2.
m2
m2
und
und
15.75
12.60
10.50
4.52
80.08
23.50
15.96
7.08
3.00
2.00
1.64
27.55
16.78
362.09
4.08
25.28
20.87
27.75
132.63
185.62
25.83
347.13
176.19
1,636.65
326.73
594.08
333.09
196.47
397.89
371.24
1,636.65
326.73
594.08
333.09
196.47
397.89
371.24
ML
ML
ML
ML
M3.
M3.
ML
GBL
und
M2.
m3
ML
3,366.00
2,866.00
500.00
3,366.00
126.23
1,346.40
3,366.00
1.00
2.00
8.75
13.13
3,366.00
1.11
7.51
17.46
1.29
33.68
4.89
43.00
1,758.04
185.62
16.78
27.55
0.49
198,192.57
3,736.26
21,523.66
8,730.00
4,342.14
4,251.43
6,583.90
144,738.00
1,758.04
371.24
146.83
361.73
1,649.34
3,736.26
21,523.66
8,730.00
4,342.14
4,251.43
6,583.90
144,738.00
1,758.04
371.24
146.83
361.73
1,649.34
m2
m3
M2.
KG.
M2.
M3.
m2
m2
und
und
U
U
8.75
51.20
40.96
114.49
27.84
2.32
13.68
14.01
1.00
1.00
1.00
1.00
1.64
27.55
16.78
4.08
25.28
362.09
20.87
27.75
235.61
1,296.56
185.62
260.23
6,775.49
14.35
1,410.56
687.31
467.12
703.80
840.05
285.50
388.78
235.61
1,296.56
185.62
260.23
14.35
1,410.56
687.31
467.12
703.80
840.05
285.50
388.78
235.61
1,296.56
185.62
260.23
2,163.04
1,137.60
1,428.00
4,891.68
91.18
411.91
473.56
1,321.86
907.27
209,373.36
4,405.30
25.83
347.13
176.19
68,925.11
13,505.28
2,885.90
998.22
848.40
m3
m3
M2.
M3.
m3
m
m
pza
71.86
17.96
33.56
18.21
12.56
3.00
3.00
2.00
40.16
55.58
25.28
362.09
123.98
26.05
11.02
255.35
2,885.90
998.22
848.40
6,593.66
1,557.19
78.15
33.06
510.70
m3
225.73
3.69
55,419.83
832.94
m3
m3
M2.
M3.
KG.
m3
m3
m3
m
m
m
158.01
67.72
109.08
48.10
1,991.38
2.66
125.00
60.00
60.00
120.00
238.00
7.16
35.40
25.28
362.09
4.08
270.38
7.58
119.48
26.05
11.02
46.38
1,131.35
2,397.29
2,757.54
17,416.53
8,124.83
719.21
947.50
7,168.80
1,563.00
1,322.40
11,038.44
106.76
1,076.93
604.08
6,083.11
8,954.99
1,456.13
1,202.11
383.12
m2
m3
M2.
M3.
m3
M2.
m2
und
65.10
39.09
36.00
16.80
33.12
57.60
57.60
1.00
1.64
27.55
16.78
362.09
270.38
25.28
20.87
383.12
1,245,105.04
27,981.76
19,867.23
106.76
1,076.93
604.08
6,083.11
8,954.99
1,456.13
1,202.11
383.12
6,593.66
1,557.19
78.15
33.06
510.70
832.94
1,131.35
2,397.29
2,757.54
17,416.53
8,124.83
719.21
947.50
7,168.80
1,563.00
1,322.40
11,038.44
m2
M2.
m3
M3.
KG.
M2.
m2
m2
und
15.75
10.50
12.60
4.52
80.08
23.50
11.96
8.08
3.00
1.64
16.78
27.55
362.09
4.08
25.28
20.87
27.75
132.63
3,978.33
25.83
176.19
347.13
1,636.65
326.73
594.08
249.61
224.22
397.89
25.83
176.19
347.13
1,636.65
326.73
594.08
249.61
224.22
397.89
04.01.03
04.01.03.01
04.01.03.02
04.01.03.03
04.01.03.04
04.01.03.05
04.01.03.06
04.01.03.07
04.01.03.08
04.01.03.09
04.01.03.10
m2
m3
M2.
M3.
KG.
M2.
m2
m2
und
und
15.75
12.60
10.50
4.52
80.08
23.50
11.96
7.08
3.00
1.00
1.64
27.55
16.78
362.09
4.08
25.28
20.87
27.75
132.63
185.62
4,136.20
25.83
347.13
176.19
1,636.65
326.73
594.08
249.61
196.47
397.89
185.62
25.83
347.13
176.19
1,636.65
326.73
594.08
249.61
196.47
397.89
185.62
ML
ML
7,171.39
6,371.39
1.11
7.51
367,296.22
301,209.47
7,960.24
47,849.14
7,960.24
23,924.57
MES 10
01 Ene. 2015
31 Ene. 2015
25.28
4.08
407.64
26.05
288.05
473.56
1,321.86
907.27
TRAZO Y REPLANTEO
EXCAVACION
SOLADO SIMPLE MEZCLA 1:10 CH
CONCRETO fc=175 kg/cm2
ACERO GRADO 60
ENCOFRADO Y DESENCOFRADO
TARRAJEO CON MORTERO CEMENTO:ARENA 1:4
TARRAJEO INTERIOR CON IMPER. CEMENTO:ARENA 1:4
SUMINIST. E INSTAL. DE TUBERIA DE REBOSE
TAPA METALICA 0.60m X 0.60
8/30/2013
AMPLIACION N 01
MES 9
01 Dic. 2014
31 Dic. 2014
51,318.00
56,000.00
04.01.02
04.01.02.01
04.01.02.02
04.01.02.03
04.01.02.04
04.01.02.05
04.01.02.06
04.01.02.07
04.01.02.08
04.01.02.09
04.02
04.02.01
04.02.01.01
04.02.01.02
MES 8
1 Nov. 2014
30 Nov. 2014
270.38
03.07.02.02
03.07.02.03
03.07.02.04
03.07.02.05
03.07.02.06
03.07.02.07
03.07.02.08
03.07.02.09
03.07.02.10
03.07.02.11
03.07.02.12
51,318.00
56,000.00
MES 6
01 Set. 2014
30 Set. 2014
8.00
03.07.02
03.07.02.01
51,318.00
56,000.00
MES 5
01 Ago. 2014
31 Ago. 2014
45.00
350.00
12.00
3.50
1.43
1.00
1.00
1.00
03.07.01.01
03.07.01.02
03.07.01.03
03.07.01.04
03.07.01.05
03.07.01.06
03.07.01.07
03.07.01.08
51,318.00
56,000.00
MES 4
01 Jul. 2014
31 Jul. 2014
m3
25,659.00
28,000.00
MES 3
01 Jun. 2014
30 Jun. 2014
M2.
KG.
m3
m
m2
und
und
und
ENCOFRADO Y DESENCOFRADO
ACERO GRADO 60
CONCRETO FC=210 KG/CM2
JUNTAS WATER STOP 6"
PUERTA METAL LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS 0.75 m
INSTALACION PLANCHA METALICA PANTALLA DISIPADORA DE IMPACT
VALVULA COMPUERTA DE FIERRO FUNDIDO BB DE 8"
VALVULA MARIPOSAB.B. DE 6"
03.06
03.06.01
MES 2
01 May. 2014
31 May. 2014
Costo al
PLAZO CONTRACTUAL
23,924.57
MES 12
01 Mar. 2015
31 Mar. 2015
MES 13
01 Abr. 2015
03 Abr. 2015
MES 13
03 Abr. 2015
30 Abr. 2015
MES 13
01 May. 2015
16 May. 2015
REPRESAMIENTO DE LA LAGUNA DE QUEULLACCOCHA Y RIEGO POR ASPERSION CHAPIMARCA-COTAHUARCAY, DISTRITO CHUQUIBAMBILLA, PROVINCIA GRAU - APURIMAC
GOBIERNO REGIONAL DE APURIMAC
CONSORCIO SAN CARLOS
DISTRITO CHUQUIBAMBILLA, PROVINCIA GRAU - APURIMAC
Item
Descripcin
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.02
04.02.02.01
04.02.02.02
04.02.02.03
04.02.02.04
04.02.02.05
04.02.02.06
04.02.02.07
04.02.02.08
04.02.02.09
04.03
04.03.01
04.03.01.01
04.03.01.02
04.03.01.03
04.03.01.04
04.03.01.05
13,968.00
9,251.09
9,057.56
14,027.26
193,627.53
1,954.67
3,513.98
m2
M2.
KG.
M3.
m2
m2
und
und
und
40.96
121.44
1,102.46
19.33
113.00
80.00
16.00
16.00
16.00
1.64
25.28
4.08
362.09
20.87
27.75
254.67
132.63
185.62
28,379.44
67.17
3,070.00
4,498.04
6,999.20
2,358.31
2,220.00
4,074.72
2,122.08
2,969.92
m3
M2.
M2.
m3
m2
m3
KG.
m2
und
und
und
13.54
407.64
14.88
25.28
135.70
16.78
57.43
27.55
135.70
1.64
17.30
270.38
257.24
4.08
14.88
20.87
1.00 10,595.23
1.00 2,044.39
62.00
146.01
37,707.32
5,519.45
376.17
2,277.05
1,582.20
222.55
4,677.57
1,049.54
310.55
10,595.23
2,044.39
9,052.62
04.03.01.17
04.03.01.18
04.03.01.19
04.03.01.20
04.03.01.21
04.03.01.22
04.03.01.23
ML
ML
ML
ML
GBL
und
ML
04.03.06
04.03.06.01
04.03.06.02
04.03.06.03
04.03.06.04
04.03.06.05
04.03.06.06
04.03.06.07
04.03.06.08
04.03.06.09
04.03.06.10
04.03.06.11
04.03.07
04.03.07.01
04.03.07.02
04.03.07.03
04.03.07.04
04.03.07.05
04.03.07.06
04.03.07.07
04.03.07.08
04.03.07.09
04.03.07.10
04.03.08
04.03.08.01
04.03.08.02
04.03.08.03
04.03.08.04
04.03.08.05
04.03.08.06
04.03.08.07
04.03.08.08
04.03.08.09
04.03.08.10
04.03.09
04.03.09.01
04.03.09.02
04.03.09.03
04.03.09.04
04.03.09.05
1.11
7.51
17.46
1.29
33.68
8,728.94
3,025.58
1,714.02
158.46
630.14
834.97
1,452.46
471.63
420.13
3,417.12
1,053.52
4.89
24.95
29.83
39.63
16.48
18.27
9.98
10.96
12.29
10.07
11.68
42,684.52
75,488.22
51,129.22
6,279.77
10,384.71
15,254.90
14,495.55
5,169.06
5,163.40
34,410.40
12,305.11
63.69
7.79
1,279.58
8.41
2,534.94
7.61
4,766.12
6.72
1.00 14,268.96
958.00
15.91
21,822.36
0.49
496.15
10,761.27
19,290.89
32,028.33
14,268.96
15,241.78
10,692.96
MES 2
01 May. 2014
31 May. 2014
MES 3
01 Jun. 2014
30 Jun. 2014
MES 4
01 Jul. 2014
31 Jul. 2014
MES 5
01 Ago. 2014
31 Ago. 2014
MES 6
01 Set. 2014
30 Set. 2014
MES 7
1 Oct. 2014
31 Oct. 2014
6,984.00
4,625.55
4,528.78
7,013.63
96,813.77
977.34
1,756.99
MES 9
01 Dic. 2014
31 Dic. 2014
MES 10
01 Ene. 2015
31 Ene. 2015
MES 11
01 Feb. 2015
31 Feb. 2015
6,984.00
4,625.55
4,528.78
7,013.63
96,813.77
977.34
1,756.99
67.17
3,070.00
4,498.04
6,999.20
2,358.31
2,220.00
4,074.72
2,122.08
2,969.92
5,519.45
376.17
2,277.05
1,582.20
222.55
4,677.57
1,049.54
310.55
10,595.23
2,044.39
9,052.62
12,111.41
65,554.37
11,260.34
11,024.68
17,073.81
30,195.29
20,451.69
2,511.91
4,153.88
6,101.96
5,798.22
2,067.63
2,065.36
13,764.16
4,922.05
198.46
4,304.51
7,716.36
12,811.33
12,111.41
49,165.78
20,952.00
8,445.25
8,268.51
12,805.35
22,646.47
15,338.76
1,883.93
3,115.41
4,576.47
4,348.67
1,550.72
1,549.02
10,323.12
3,691.53
148.84
3,228.38
5,787.27
9,608.50
4,277.18
3,207.89
49,165.78
8,445.25
8,268.51
12,805.35
22,646.47
15,338.76
1,883.93
3,115.41
4,576.47
4,348.67
1,550.72
1,549.02
10,323.12
3,691.53
148.84
3,228.38
5,787.27
9,608.50
14,268.96
15,241.78
3,207.89
30.60
33.66
30.60
126.27
511.04
14.64
65.88
57.24
9.00
9.00
9.00
1.64
27.55
16.78
25.28
4.08
362.09
20.87
27.75
132.63
902.05
185.62
26,015.16
50.18
927.33
513.47
3,192.11
2,085.04
5,301.00
1,374.92
1,588.41
1,193.67
8,118.45
1,670.58
CAMARA DE ROMPE PRESION TIPO VII DOBLE BOYA 4" (03 UND)
TRAZO Y REPLANTEO
EXCAVACION
SOLADO SIMPLE MEZCLA 1:10 CH
ENCOFRADO Y DESENCOFRADO
CONCRETO fc=175 kg/cm2
ACERO GRADO 60
TARRAJEO CON MORTERO CEMENTO:ARENA 1:4
TARRAJEO INTERIOR CON IMPER. CEMENTO:ARENA 1:4
INST. DE ACCESORIOS DE ENTRADA Y SALIDA
TAPA METALICA 0.60m X 0.60
m2
m3
M2.
M2.
M3.
KG.
m2
m2
und
U
10.20
11.22
10.20
42.09
4.88
170.35
21.96
19.08
3.00
3.00
1.64
27.55
16.78
25.28
362.09
4.08
20.87
27.75
432.57
185.62
6,865.42
16.73
309.11
171.16
1,064.04
1,767.00
695.03
458.31
529.47
1,297.71
556.86
CAMARA DE ROMPE PRESION TIPO VII DOBLE BOYA 3" (03 UND)
TRAZO Y REPLANTEO
INST. DE TUBERIA DE REBOSE
EXCAVACION
SOLADO SIMPLE MEZCLA 1:10 CH
ENCOFRADO Y DESENCOFRADO
CONCRETO fc=175 kg/cm2
ACERO GRADO 60
m2
und
m3
M2.
M2.
M3.
KG.
10.20
3.00
11.22
10.20
42.09
4.88
170.35
1.64
84.76
27.55
16.78
25.28
362.09
4.08
7,902.76
16.73
254.28
309.11
171.16
1,064.04
1,767.00
695.03
m2
m2
und
und
und
21.96
19.08
3.00
3.00
3.00
20.87
27.75
84.76
608.83
185.62
458.31
529.47
254.28
1,826.49
556.86
m2
m3
M2.
M2.
5.23
3.90
5.23
17.51
1.64
27.55
16.78
25.28
3,171.37
8.58
107.45
87.76
442.65
KG.
m2
M3.
m2
und
und
und
50.74
9.05
1.22
6.84
3.00
3.00
3.00
4.08
20.87
362.09
27.75
84.76
228.78
185.62
207.02
188.87
441.75
189.81
254.28
686.34
556.86
8.58
107.45
87.76
442.65
207.02
188.87
441.75
189.81
254.28
686.34
556.86
CAMARA DE ROMPE PRESION TIPO VII UNA BOYA 11/2" (01 UND)
TRAZO Y REPLANTEO
EXCAVACION
SOLADO SIMPLE MEZCLA 1:10 CH
ENCOFRADO Y DESENCOFRADO
CONCRETO fc=175 kg/cm2
ACERO GRADO 60
TARRAJEO EXTERIOR
TARRAJEO INTERIOR CON IMPER. CEMENTO:ARENA 1:4
INST. DE TUBERIA DE REBOSE
INST. DE ACCESORIOS DE ENTRADA Y SALIDA
TAPA METALICA 0.60m X 0.60
m2
m3
M2.
M2.
M3.
KG.
m2
m2
und
und
und
1.74
1.30
1.74
5.84
0.41
16.91
3.02
2.28
1.00
1.00
1.00
1.64
27.55
16.78
25.28
362.09
4.08
20.87
27.75
84.76
332.14
185.62
1,161.78
2.85
35.82
29.20
147.64
148.46
68.99
63.03
63.27
84.76
332.14
185.62
2.85
35.82
29.20
147.64
148.46
68.99
63.03
63.27
84.76
332.14
185.62
m2
m3
M2.
M2.
M3.
m3
m2
und
U
m3
6.40
12.88
6.40
26.80
1.63
0.42
24.20
10.00
10.00
0.21
1.64
27.55
16.78
25.28
362.09
270.38
20.87
45.76
185.62
68.85
4,687.31
10.50
354.84
107.39
677.50
590.21
113.56
505.05
457.60
1,856.20
14.46
354.84
107.39
677.50
590.21
113.56
505.05
457.60
1,856.20
14.46
m2
m3
M2.
M2.
M3.
m3
m2
und
U
m3
4.86
2.43
4.83
18.48
0.98
0.25
14.52
6.00
6.00
0.13
1.64
27.55
16.78
25.28
362.09
270.38
20.87
683.90
185.62
68.85
6,574.69
7.97
66.95
81.05
467.17
354.85
67.60
303.03
4,103.40
1,113.72
8.95
7.97
66.95
81.05
467.17
354.85
67.60
303.03
4,103.40
1,113.72
8.95
m2
m3
M2.
m3
M2.
2.43
0.13
9.24
1.22
2.43
1.64
270.38
25.28
27.55
16.78
1,936.23
3.99
35.15
233.59
33.61
40.78
3.99
35.15
233.59
33.61
40.78
8/30/2013
AMPLIACION N 01
MES 8
1 Nov. 2014
30 Nov. 2014
m2
m3
M2.
M2.
KG.
M3.
m2
m2
und
und
U
04.03.05
04.03.05.01
04.03.05.02
04.03.05.03
04.03.05.04
04.03.05.05
04.03.05.06
04.03.05.07
04.03.05.08
04.03.05.09
04.03.05.10
04.03.05.11
21,822.36
21,822.36
1,200.00
21,822.36
818.34
849,827.05
640,318.47
24,222.82
163,885.92
20,952.00
28,150.84
27,561.69
MES 1
03 Abr. 2014
30 Abr. 2014
CAMARA DE ROMPE PRESION TIPO VII DOBLE BOYA 6" (09 UND)
TRAZO Y REPLANTEO
EXCAVACION
SOLADO SIMPLE MEZCLA 1:10 CH
ENCOFRADO Y DESENCOFRADO
ACERO GRADO 60
CONCRETO fc=175 kg/cm2
TARRAJEO CON MORTERO CEMENTO:ARENA 1:4
TARRAJEO INTERIOR CON IMPERMEABILIZANTE
INST. DE TUBERIA DE REBOSE
INST. DE ACCESORIOS DE ENTRADA Y SALIDA
TAPA METALICA 0.60m X 0.60
04.03.04
04.03.04.01
04.03.04.02
04.03.04.03
04.03.04.04
04.03.04.05
04.03.04.06
04.03.04.07
04.03.04.08
04.03.04.09
04.03.04.10
04.03.04.11
04.03.04.12
Parcial S/.
17.46
1.29
33.68
4.89
27.00
1,954.67
0.49
04.03.03
04.03.03.01
04.03.03.02
04.03.03.03
04.03.03.04
04.03.03.05
04.03.03.06
04.03.03.07
04.03.03.08
04.03.03.09
04.03.03.10
Precio S/.
800.00
7,171.39
268.93
2,868.56
7,171.39
1.00
7,171.39
04.03.01.06
04.03.01.07
04.03.01.08
04.03.01.09
04.03.01.10
04.03.01.11
04.03.01.12
04.03.01.13
04.03.01.14
04.03.01.15
04.03.01.16
04.03.02
04.03.02.01
04.03.02.02
04.03.02.03
04.03.02.04
04.03.02.05
04.03.02.06
04.03.02.07
04.03.02.08
04.03.02.09
04.03.02.10
04.03.02.11
Metrado
ML
ML
M3.
M3.
ML
GBL
ML
04.02.03
04.02.03.01
04.02.03.02
04.02.03.03
04.02.03.04
04.02.03.05
04.02.03.06
04.02.03.07
04.02.03.08
04.02.03.09
04.02.03.10
04.02.03.11
Und.
Costo al
PLAZO CONTRACTUAL
50.18
927.33
513.47
3,192.11
2,085.04
5,301.00
1,374.92
1,588.41
1,193.67
8,118.45
1,670.58
16.73
309.11
171.16
1,064.04
1,767.00
695.03
458.31
529.47
1,297.71
556.86
16.73
254.28
309.11
171.16
1,064.04
1,767.00
695.03
458.31
529.47
254.28
1,826.49
556.86
10.50
MES 12
01 Mar. 2015
31 Mar. 2015
MES 13
01 Abr. 2015
03 Abr. 2015
MES 13
03 Abr. 2015
30 Abr. 2015
MES 13
01 May. 2015
16 May. 2015
REPRESAMIENTO DE LA LAGUNA DE QUEULLACCOCHA Y RIEGO POR ASPERSION CHAPIMARCA-COTAHUARCAY, DISTRITO CHUQUIBAMBILLA, PROVINCIA GRAU - APURIMAC
GOBIERNO REGIONAL DE APURIMAC
CONSORCIO SAN CARLOS
DISTRITO CHUQUIBAMBILLA, PROVINCIA GRAU - APURIMAC
Item
04.03.09.06
04.03.09.07
04.03.09.08
04.03.09.09
04.03.09.10
04.03.10
04.03.10.01
04.03.10.02
04.03.10.03
04.03.10.04
04.03.10.05
04.03.10.06
04.03.10.07
04.03.10.08
04.03.10.09
04.03.10.10
04.03.11
04.03.11.01
04.03.11.02
04.03.11.03
04.03.11.04
04.03.11.05
04.03.11.06
04.03.11.07
04.03.11.08
04.03.11.09
04.03.11.10
Descripcin
04.03.12
04.03.12.01
04.03.12.02
04.03.12.03
04.03.12.04
04.03.12.05
04.03.12.06
04.03.12.07
04.03.12.08
04.03.12.09
04.03.12.10
04.03.12.11
04.03.13
04.03.13.01
04.03.13.02
04.03.13.03
04.03.13.04
04.03.13.05
04.03.13.06
04.03.13.07
04.03.13.08
04.03.13.09
04.03.13.10
04.03.13.11
ACERO GRADO 60
TARRAJEO EXTERIOR
SUMINISTRO E INST. DE TUBERIA DE FG
SUMINISTRO Y ACCESORIOS DE PASE AEREO
SUMINISTRO Y LANZADO DE CABLE
Und.
Metrado
Precio S/.
Parcial S/.
M3.
m2
und
U
m3
0.49
7.26
3.00
3.00
0.06
362.09
20.87
233.06
185.62
68.85
177.42
151.52
699.18
556.86
4.13
m2
m3
M2.
M2.
M3.
m3
m2
und
U
m3
4.05
2.03
4.05
15.40
0.82
0.21
12.10
5.00
5.00
0.11
1.64
27.55
16.78
25.28
362.09
270.38
20.87
233.06
185.62
68.85
3,227.03
6.64
55.93
67.96
389.31
296.91
56.78
252.53
1,165.30
928.10
7.57
m2
m3
M2.
M2.
M3.
m3
m2
und
U
m3
2.43
1.22
2.43
9.24
0.49
0.13
7.26
3.00
3.00
0.06
1.64
27.55
16.78
25.28
362.09
270.38
20.87
79.63
185.62
68.85
1,475.94
3.99
33.61
40.78
233.59
177.42
35.15
151.52
238.89
556.86
4.13
m2
m3
M2.
m3
m3
M2.
KG.
m2
61.12
29.14
5.10
12.98
16.47
73.50
108.41
5.10
1.64
27.55
25.28
407.64
270.38
16.78
4.08
20.87
22,376.47
100.24
802.81
128.93
5,291.17
4,453.16
1,233.33
442.31
106.44
und
und
m
1.00
1.00
33.00
4,209.34
1,684.05
118.93
4,209.34
1,684.05
3,924.69
m2
m3
M2.
m3
m3
M2.
67.22
27.81
5.10
13.67
14.45
25.00
1.64
27.55
25.28
407.64
270.38
16.78
20,041.80
110.24
766.17
128.93
5,572.44
3,906.99
419.50
KG.
m2
und
und
m
109.23
5.10
1.00
1.00
36.00
4.08
20.87
2,605.90
1,698.05
118.93
445.66
106.44
2,605.90
1,698.05
4,281.48
MES 1
03 Abr. 2014
30 Abr. 2014
MES 2
01 May. 2014
31 May. 2014
MES 3
01 Jun. 2014
30 Jun. 2014
Costo al
8/30/2013
PLAZO CONTRACTUAL
MES 4
01 Jul. 2014
31 Jul. 2014
MES 5
01 Ago. 2014
31 Ago. 2014
MES 6
01 Set. 2014
30 Set. 2014
MES 7
1 Oct. 2014
31 Oct. 2014
AMPLIACION N 01
MES 8
1 Nov. 2014
30 Nov. 2014
MES 9
01 Dic. 2014
31 Dic. 2014
MES 10
01 Ene. 2015
31 Ene. 2015
MES 11
01 Feb. 2015
31 Feb. 2015
MES 12
01 Mar. 2015
31 Mar. 2015
MES 13
01 Abr. 2015
03 Abr. 2015
MES 13
03 Abr. 2015
30 Abr. 2015
MES 13
01 May. 2015
16 May. 2015
177.42
151.52
699.18
556.86
4.13
6.64
55.93
67.96
389.31
296.91
56.78
252.53
1,165.30
928.10
7.57
3.99
33.61
40.78
233.59
177.42
35.15
151.52
238.89
556.86
4.13
100.24
802.81
128.93
5,291.17
4,453.16
1,233.33
442.31
106.44
4,209.34
1,684.05
3,924.69
110.24
766.17
128.93
5,572.44
3,906.99
419.50
445.66
106.44
2,605.90
1,698.05
4,281.48
04.03.14
04.03.14.01
04.03.14.02
04.03.14.03
04.03.14.04
04.03.14.05
04.03.14.06
04.03.14.07
04.03.14.08
04.03.14.09
04.03.14.10
04.03.14.11
m2
m3
KG.
M2.
m3
m3
M2.
m2
und
und
m
47.02
19.35
93.64
5.10
11.78
7.88
25.00
5.10
1.00
1.00
26.00
1.64
27.55
4.08
25.28
270.38
407.64
16.78
20.87
1,233.04
1,400.45
118.93
13,770.07
77.11
533.09
382.05
128.93
3,185.08
3,212.20
419.50
106.44
1,233.04
1,400.45
3,092.18
04.03.15
04.03.15.01
04.03.15.02
04.03.15.03
04.03.15.04
04.03.15.05
04.03.15.06
04.03.15.07
04.03.15.08
04.03.15.09
04.03.15.10
04.03.15.11
m2
m3
M2.
KG.
m3
M2.
m3
m2
und
und
m
57.50
24.09
5.10
106.37
11.78
25.00
12.62
5.10
1.00
1.00
31.00
1.64
27.55
25.28
4.08
270.38
16.78
407.64
20.87
4,209.34
1,684.05
118.93
19,756.56
94.30
663.68
128.93
433.99
3,185.08
419.50
5,144.42
106.44
4,209.34
1,684.05
3,686.83
89.59
630.50
122.48
4.72
33.18
6.45
412.29
3,025.82
398.53
4,887.20
101.12
3,998.87
1,599.85
3,502.49
21.70
159.25
20.98
257.22
5.32
210.47
84.20
184.34
04.03.16
04.03.16.01
04.03.16.02
04.03.16.03
04.03.16.04
04.03.16.05
04.03.16.06
CAJA DE CONCRETO
TRAZO Y REPLANTEO
EXCAVACION
ENCOFRADO Y DESENCOFRADO
CONCRETO fc 140kg/cm2
TAPA METALICA 0.25 X 0.30 X 1/8"
ACCESORIOS
m2
m3
M2.
m3
und
und
141.00
25.15
355.32
14.37
141.00
141.00
1.64
27.55
25.28
324.55
102.54
111.75
44,785.29
231.24
692.88
8,982.49
4,663.78
14,458.14
15,756.75
219.68
658.24
8,533.37
4,430.59
13,735.23
14,968.91
11.56
34.64
449.12
233.19
722.91
787.84
GBL
141.00
182.70
25,760.70
24,472.67
1,288.04
04.03.17
04.03.17.01
05
05.01
05.01.01
05.01.01.01
05.01.01.02
05.01.01.03
05.01.01.04
05.01.01.05
05.01.01.06
77.11
533.09
382.05
128.93
3,185.08
3,212.20
419.50
106.44
1,233.04
1,400.45
3,092.18
25,760.70
ML
ML
ML
ML
M3.
M3.
4,561.05
4,061.05
500.00
4,561.05
171.04
1,824.42
1.11
7.51
17.46
1.29
33.68
4.89
735,777.47
200,616.79
185,136.73
5,062.77
30,498.49
8,730.00
5,883.75
5,760.63
8,921.41
ML
ML
GBL
ML
352.00
4,029.05
1.00
4,561.05
23.00
27.00
1,164.42
0.49
8,096.00
108,784.35
1,164.42
2,234.91
m2
m3
M2.
M2.
KG.
m2
M3.
m2
und
und
und
17.92
22.40
17.92
53.13
482.33
49.44
8.46
35.00
3.00
7.00
7.00
1.64
27.55
16.78
25.28
4.08
20.87
362.09
27.75
132.63
254.67
185.62
12,804.51
29.39
617.12
300.70
1,343.13
1,967.91
1,031.81
3,063.28
971.25
397.89
1,782.69
1,299.34
29.39
617.12
300.70
1,343.13
1,967.91
1,031.81
3,063.28
971.25
397.89
1,782.69
1,299.34
05.01.03
05.01.03.01
05.01.03.02
05.01.03.03
05.01.03.04
05.01.03.05
05.01.03.06
05.01.03.07
05.01.03.08
m2
m3
M2.
M3.
m2
und
und
M3.
1.28
0.58
5.36
0.33
4.84
2.00
2.00
0.04
1.64
27.55
25.28
362.09
20.87
889.83
260.23
33.68
2,675.55
2.10
15.98
135.50
119.49
101.01
1,779.66
520.46
1.35
2.10
15.98
135.50
119.49
101.01
1,779.66
520.46
1.35
05.02
05.02.01
05.02.01.01
05.02.01.02
05.02.01.03
05.02.01.04
05.02.01.05
05.02.01.06
05.02.01.07
05.02.01.08
05.02.01.09
05.02.01.10
05.02.01.11
05.02.01.12
05.02.01.13
05.02.01.14
05.02.01.15
05.02.01.16
05.02.01.17
05.02.01.18
05.02.01.19
05.02.01.20
05.02.01.21
1.11
7.51
1.29
33.68
4.89
29.83
24.95
16.48
21.84
18.27
10.96
9.98
12.29
11.68
9.10
10.07
7.61
6.72
8.41
5,162.77
15.91
535,160.68
340,597.92
13,726.77
92,872.11
15,952.73
15,618.76
24,188.78
21,095.78
15,694.80
22,700.21
3,539.61
31,742.66
3,387.19
5,791.89
1,396.51
2,581.98
5,268.17
9,016.98
8,253.81
18,318.79
10,463.97
5,162.77
7,764.08
05.01.01.07
05.01.01.08
05.01.01.09
05.01.01.10
05.01.02
05.01.02.01
05.01.02.02
05.01.02.03
05.01.02.04
05.01.02.05
05.01.02.06
05.01.02.07
05.01.02.08
05.01.02.09
05.01.02.10
05.01.02.11
ML
ML
ML
M3.
M3.
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
GBL
und
12,366.46
12,366.46
12,366.46
463.74
4,946.58
707.20
629.05
1,377.44
162.07
1,737.42
309.05
580.35
113.63
221.06
578.92
895.43
1,084.60
2,726.01
1,244.23
1.00
488.00
5,062.77
10,674.47
3,055.50
2,059.31
2,016.22
3,122.49
2,833.60
38,074.52
407.55
10,674.47
3,055.50
2,059.31
2,016.22
3,122.49
2,833.60
38,074.52
407.55
9,149.55
2,619.00
1,765.13
1,728.19
2,676.42
2,428.80
32,635.31
349.33
782.22
782.22
670.47
13,726.77
32,505.24
5,583.46
5,466.57
8,466.07
7,383.52
5,493.18
7,945.07
1,238.86
11,109.93
1,185.52
2,027.16
488.78
903.69
1,843.86
3,155.94
2,888.83
6,411.58
3,662.39
1,806.97
2,717.43
32,505.24
5,583.46
5,466.57
8,466.07
7,383.52
5,493.18
7,945.07
1,238.86
11,109.93
1,185.52
2,027.16
488.78
903.69
1,843.86
3,155.94
2,888.83
6,411.58
3,662.39
1,806.97
2,717.43
27,861.63
4,785.82
4,685.63
7,256.63
6,328.73
4,708.44
6,810.06
1,061.88
9,522.80
1,016.16
1,737.57
418.95
774.59
1,580.45
2,705.09
2,476.14
5,495.64
3,139.19
1,548.83
2,329.22
REPRESAMIENTO DE LA LAGUNA DE QUEULLACCOCHA Y RIEGO POR ASPERSION CHAPIMARCA-COTAHUARCAY, DISTRITO CHUQUIBAMBILLA, PROVINCIA GRAU - APURIMAC
GOBIERNO REGIONAL DE APURIMAC
CONSORCIO SAN CARLOS
DISTRITO CHUQUIBAMBILLA, PROVINCIA GRAU - APURIMAC
Item
Descripcin
05.02.01.22
Metrado
ML
12,366.46
Precio S/.
Parcial S/.
MES 1
03 Abr. 2014
30 Abr. 2014
MES 2
01 May. 2014
31 May. 2014
MES 3
01 Jun. 2014
30 Jun. 2014
8/30/2013
MES 4
01 Jul. 2014
31 Jul. 2014
MES 5
01 Ago. 2014
31 Ago. 2014
MES 6
01 Set. 2014
30 Set. 2014
MES 7
1 Oct. 2014
31 Oct. 2014
MES 8
1 Nov. 2014
30 Nov. 2014
AMPLIACION N 01
MES 9
01 Dic. 2014
31 Dic. 2014
MES 10
01 Ene. 2015
31 Ene. 2015
MES 11
01 Feb. 2015
31 Feb. 2015
MES 12
01 Mar. 2015
31 Mar. 2015
MES 13
01 Abr. 2015
03 Abr. 2015
0.49
6,059.57
7.68
9.60
7.68
22.77
3.63
206.71
21.19
15.00
3.00
3.00
3.00
1.64
27.55
16.78
25.28
362.09
4.08
20.87
27.75
132.63
254.67
185.62
5,716.60
12.60
264.48
128.87
575.63
1,314.39
843.38
442.24
416.25
397.89
764.01
556.86
m2
m3
M2.
M2.
M3.
KG.
m2
m2
und
und
und
7.68
26.10
7.68
22.77
3.63
206.71
21.19
15.00
3.00
3.00
3.00
1.64
27.55
16.78
25.28
362.09
4.08
20.87
27.75
132.63
902.05
185.62
8,113.32
12.60
719.06
128.87
575.63
1,314.39
843.38
442.24
416.25
397.89
2,706.15
556.86
m2
m3
M2.
M2.
M3.
KG.
m2
m2
und
und
23.80
9.60
23.80
98.21
11.39
397.47
51.24
44.52
7.00
7.00
1.64
27.55
16.78
25.28
362.09
4.08
20.87
27.75
84.76
432.57
16,156.97
39.03
264.48
399.36
2,482.75
4,124.21
1,621.68
1,069.38
1,235.43
593.32
3,027.99
und
7.00
185.62
1,299.34
m2
m3
M2.
M2.
M3.
KG.
m2
m2
3.40
3.74
3.40
14.03
1.63
56.78
7.32
6.36
1.64
27.55
16.78
25.28
362.09
4.08
20.87
27.75
2,550.69
5.58
103.04
57.05
354.68
590.21
231.66
152.77
176.49
und
und
und
1.00
1.00
1.00
84.76
608.83
185.62
84.76
608.83
185.62
CAMARA DE ROMPE PRESION TIPO VII UNA BOYA 2" (02 UND)
TRAZO Y REPLANTEO
EXCAVACION
SOLADO SIMPLE MEZCLA 1:10 CH
ENCOFRADO Y DESENCOFRADO
CONCRETO fc=175 kg/cm2
ACERO GRADO 60
TARRAJEO EXTERIOR
TARRAJEO INTERIOR CON IMPERMEABILIZANTE
INST. DE TUBERIA DE REBOSE
INST. DE ACCESORIOS DE ENTRADA Y SALIDA
TAPA METALICA 0.60m X 0.60
m2
m3
M2.
M2.
M3.
KG.
m2
m2
und
und
und
3.49
2.60
3.49
11.67
0.81
33.83
6.03
4.56
2.00
2.00
2.00
1.64
27.55
16.78
25.28
362.09
4.08
20.87
27.75
84.76
228.78
185.62
2,112.96
5.72
71.63
58.56
295.02
293.29
138.03
125.85
126.54
169.52
457.56
371.24
m2
m3
M2.
M2.
M3.
m3
m2
und
U
m3
3.84
1.73
3.84
16.08
0.98
0.25
14.52
6.00
6.00
0.13
1.64
27.55
16.78
25.28
362.09
270.38
20.87
45.76
185.62
68.85
2,647.61
6.30
47.66
64.44
406.50
354.85
67.60
303.03
274.56
1,113.72
8.95
m2
m3
M2.
M2.
M3.
m3
m2
und
U
m3
2.43
1.22
2.43
9.24
0.49
0.13
7.26
3.00
3.00
0.13
1.64
27.55
16.78
25.28
362.09
270.38
20.87
683.90
185.62
68.85
3,293.57
3.99
33.61
40.78
233.59
177.42
35.15
151.52
2,051.70
556.86
8.95
3.99
33.61
40.78
233.59
177.42
35.15
151.52
2,051.70
556.86
8.95
m2
m3
M2.
M2.
M3.
m3
m2
und
U
m3
3.24
1.62
3.24
12.32
0.65
0.17
9.68
4.00
4.00
0.13
1.64
27.55
16.78
25.28
362.09
270.38
20.87
233.06
185.62
68.85
2,582.77
5.31
44.63
54.37
311.45
235.36
45.96
202.02
932.24
742.48
8.95
5.31
44.63
54.37
311.45
235.36
45.96
202.02
932.24
742.48
8.95
m2
m3
M2.
M2.
M3.
m3
m2
und
U
m3
3.24
1.62
3.24
12.32
0.65
0.17
9.68
4.00
4.00
0.13
1.64
27.55
16.78
25.28
362.09
270.38
20.87
79.63
185.62
68.85
1,969.05
5.31
44.63
54.37
311.45
235.36
45.96
202.02
318.52
742.48
8.95
5.31
44.63
54.37
311.45
235.36
45.96
202.02
318.52
742.48
8.95
05.02.11
05.02.11.01
05.02.11.02
05.02.11.03
05.02.11.04
05.02.11.05
05.02.11.06
05.02.11.07
05.02.11.08
05.02.11.09
05.02.11.10
05.02.11.11
m2
m3
M2.
M2.
m3
m3
KG.
m2
und
und
m
73.50
56.30
73.50
5.24
6.22
11.42
125.22
5.24
1.00
1.00
35.00
1.64
27.55
16.78
25.28
407.64
270.38
4.08
20.87
4,209.34
1,684.05
118.93
19,336.87
120.54
1,551.07
1,233.33
132.47
2,535.52
3,087.74
510.90
109.36
4,209.34
1,684.05
4,162.55
05.02.12
05.02.12.01
05.02.12.02
05.02.12.03
05.02.12.04
05.02.12.05
05.02.12.06
CAJA DE CONCRETO
TRAZO Y REPLANTEO
EXCAVACION
ENCOFRADO Y DESENCOFRADO
CONCRETO fc 140kg/cm2
TAPA METALICA 0.25 X 0.30 X 1/8"
ACCESORIOS
m2
m3
M2.
m3
und
und
260.00
46.38
655.20
26.49
260.00
260.00
1.64
27.55
25.28
324.55
102.54
111.75
82,580.35
426.40
1,277.77
16,563.46
8,597.33
26,660.40
29,055.00
213.20
638.88
8,281.73
4,298.66
13,330.20
14,527.50
213.20
638.88
8,281.73
4,298.66
13,330.20
14,527.50
GBL
260.00
182.70
47,502.00
47,502.00
23,751.00
23,751.00
BOL
GLB
kg
VJE
m
m
m
m
bls
m3
4,990.00
28.00
50,000.00
6.00
18,142.00
8,494.00
18,697.00
3,534.00
4,990.00
297.00
4.00
840.00
0.19
5,000.00
0.54
0.60
1.40
1.80
6.00
217.15
245,593.97
224,842.37
19,960.00
23,520.00
9,500.00
30,000.00
9,796.68
5,096.40
26,175.80
6,361.20
29,940.00
64,492.29
4,898.34
2,548.20
13,087.90
3,180.60
10,479.00
4,898.34
2,548.20
13,087.90
3,180.60
10,479.00
05.02.02
05.02.02.01
05.02.02.02
05.02.02.03
05.02.02.04
05.02.02.05
05.02.02.06
05.02.02.07
05.02.02.08
05.02.02.09
05.02.02.10
05.02.02.11
05.02.03
05.02.03.01
05.02.03.02
05.02.03.03
05.02.03.04
05.02.03.05
05.02.03.06
05.02.03.07
05.02.03.08
05.02.03.09
05.02.03.10
05.02.03.11
Und.
Costo al
PLAZO CONTRACTUAL
05.02.04
05.02.04.01
05.02.04.02
05.02.04.03
05.02.04.04
05.02.04.05
05.02.04.06
05.02.04.07
05.02.04.08
05.02.04.09
05.02.04.10
05.02.04.11
05.02.06
05.02.06.01
05.02.06.02
05.02.06.03
05.02.06.04
05.02.06.05
05.02.06.06
05.02.06.07
05.02.06.08
05.02.06.09
05.02.06.10
05.02.06.11
05.02.07
05.02.07.01
05.02.07.02
05.02.07.03
05.02.07.04
05.02.07.05
05.02.07.06
05.02.07.07
05.02.07.08
05.02.07.09
05.02.07.10
05.02.08
05.02.08.01
05.02.08.02
05.02.08.03
05.02.08.04
05.02.08.05
05.02.08.06
05.02.08.07
05.02.08.08
05.02.08.09
05.02.08.10
05.02.09
05.02.09.01
05.02.09.02
05.02.09.03
05.02.09.04
05.02.09.05
05.02.09.06
05.02.09.07
05.02.09.08
05.02.09.09
05.02.09.10
05.02.10
05.02.10.01
05.02.10.02
05.02.10.03
05.02.10.04
05.02.10.05
05.02.10.06
05.02.10.07
05.02.10.08
05.02.10.09
05.02.10.10
05.02.13
05.02.13.01
06
06.01
06.01.01
06.01.02
06.01.03
06.01.04
06.01.05
06.01.06
06.01.07
06.01.08
06.01.09
06.01.10
06.02
m2
m3
M2.
M2.
M3.
KG.
m2
m2
und
und
und
CAMARA DE ROMPE PRESION TIPO VII DOBLE BOYA 6" (03 UND)
TRAZO Y REPLANTEO
EXCAVACION
SOLADO SIMPLE MEZCLA 1:10 CH
ENCOFRADO Y DESENCOFRADO
CONCRETO fc=175 kg/cm2
ACERO GRADO 60
TARRAJEO EXTERIOR
TARRAJEO INTERIOR CON IMPERMEABILIZANTE
INST. DE TUBERIA DE REBOSE
INST. DE ACCESORIOS DE ENTRADA Y SALIDA
TAPA METALICA 0.60m X 0.60
CAMARA DE ROMPE PRESION TIPO VII DOBLE BOYA 4" (07 UND)
TRAZO Y REPLANTEO
EXCAVACION
SOLADO SIMPLE MEZCLA 1:10 CH
ENCOFRADO Y DESENCOFRADO
CONCRETO fc=175 kg/cm2
ACERO GRADO 60
TARRAJEO EXTERIOR
TARRAJEO INTERIOR CON IMPERMEABILIZANTE
INST. DE TUBERIA DE REBOSE
INST. DE ACCESORIOS DE ENTRADA Y SALIDA
TAPA METALICA 0.60m X 0.60
05.02.05
05.02.05.01
05.02.05.02
05.02.05.03
05.02.05.04
05.02.05.05
05.02.05.06
05.02.05.07
05.02.05.08
05.02.05.09
05.02.05.10
05.02.05.11
CAMARA DE ROMPE PRESION TIPO VII DOBLE BOYA 3" (01 UND)
TRAZO Y REPLANTEO
EXCAVACION
SOLADO SIMPLE MEZCLA 1:10 CH
ENCOFRADO Y DESENCOFRADO
CONCRETO fc=175 kg/cm2
ACERO GRADO 60
TARRAJEO EXTERIOR
TARRAJEO INTERIOR CON IMPERMEABILIZANTE
20,751.60
2,120.85
2,120.85
1,817.87
12.60
264.48
128.87
575.63
1,314.39
843.38
442.24
416.25
397.89
764.01
556.86
12.60
719.06
128.87
575.63
1,314.39
843.38
442.24
416.25
397.89
2,706.15
556.86
39.03
264.48
399.36
2,482.75
4,124.21
1,621.68
1,069.38
1,235.43
593.32
3,027.99
1,299.34
5.58
103.04
57.05
354.68
590.21
231.66
152.77
176.49
84.76
608.83
185.62
5.72
71.63
58.56
295.02
293.29
138.03
125.85
126.54
169.52
457.56
371.24
6.30
47.66
64.44
406.50
354.85
67.60
303.03
274.56
1,113.72
8.95
120.54
1,551.07
1,233.33
132.47
2,535.52
3,087.74
510.90
109.36
4,209.34
1,684.05
4,162.55
19,960.00
23,520.00
9,500.00
30,000.00
8,982.00
19,347.69
19,347.69
25,796.92
MES 13
03 Abr. 2015
30 Abr. 2015
MES 13
01 May. 2015
16 May. 2015
REPRESAMIENTO DE LA LAGUNA DE QUEULLACCOCHA Y RIEGO POR ASPERSION CHAPIMARCA-COTAHUARCAY, DISTRITO CHUQUIBAMBILLA, PROVINCIA GRAU - APURIMAC
GOBIERNO REGIONAL DE APURIMAC
CONSORCIO SAN CARLOS
DISTRITO CHUQUIBAMBILLA, PROVINCIA GRAU - APURIMAC
Item
06.02.01
06.02.02
Descripcin
LIMPIEZA DURANTE LA EJECUCION
LIMPIEZA FINAL DE OBRA
Costo Directo
Gastos Generales 5.00%
Utilidad 8.00%
subtotal
IVG
PRESUPUESTO TOTAL
Und.
mes
GLB
Metrado
9.00
1.00
Precio S/.
2,075.16
2,075.16
Parcial S/.
MES 1
03 Abr. 2014
30 Abr. 2014
MES 2
01 May. 2014
31 May. 2014
MES 3
01 Jun. 2014
30 Jun. 2014
Costo al
MES 4
01 Jul. 2014
31 Jul. 2014
MES 5
01 Ago. 2014
31 Ago. 2014
18,676.44
2,075.16
4,782,702.44
239,135.12
382,616.20
5,404,453.76
972,801.68
6,377,255.44
PROGRAMADO ACTUAL
PROGRAMADO ACUMULADO
8/30/2013
PLAZO CONTRACTUAL
MES 6
01 Set. 2014
30 Set. 2014
MES 7
1 Oct. 2014
31 Oct. 2014
MES 8
1 Nov. 2014
30 Nov. 2014
AMPLIACION N 01
MES 9
01 Dic. 2014
31 Dic. 2014
MES 10
01 Ene. 2015
31 Ene. 2015
MES 11
01 Feb. 2015
31 Feb. 2015
MES 12
01 Mar. 2015
31 Mar. 2015
MES 13
01 Abr. 2015
03 Abr. 2015
MES 13
03 Abr. 2015
30 Abr. 2015
MES 13
01 May. 2015
16 May. 2015
18,676.44
108,336.13
5,416.81
8,666.89
122,419.82
22,035.57
144,455.39
2.27%
2.27%
S/. 53,659.00
2,682.95
4,292.72
S/. 60,634.67
10,914.24
71,548.91
1.12%
3.39%
S/. 116,818.00
5,840.90
9,345.44
132,004.34
23,760.78
155,765.12
2.44%
5.83%
S/. 107,318.00
5,365.90
8,585.44
121,269.34
21,828.48
143,097.82
2.24%
8.07%
S/. 139,942.00
6,997.10
11,195.36
158,134.46
28,464.20
186,598.66
2.93%
11.00%
S/. 276,175.63
13,808.78
22,094.05
312,078.46
56,174.12
368,252.58
5.77%
16.77%
S/. 650,807.94
32,540.40
52,064.64
735,412.97
132,374.33
867,787.31
13.61%
30.38%
S/. 649,607.38
32,480.37
51,968.59
734,056.34
132,130.14
866,186.48
13.58%
43.96%
S/. 689,952.16
34,497.61
55,196.17
779,645.94
140,336.27
919,982.21
14.43%
58.39%
S/. 669,005.74
33,450.29
53,520.46
755,976.48
136,075.77
892,052.25
13.99%
72.38%
S/. 728,158.77
36,407.94
58,252.70
822,819.42
148,107.49
970,926.91
15.22%
87.60%
S/. 242,253.07
12,112.65
19,380.25
273,745.97
49,274.27
323,020.24
5.07%
92.67%
S/. 258,290.68
12,914.53
20,663.25
291,868.46
52,536.32
344,404.79
5.40%
98.07%
1,971.40
S/. 87,758.81
4,387.94
7,020.70
99,167.45
17,850.14
117,017.59
1.83%
99.90%
103.76
S/. 4,618.88
230.94
369.51
5,219.34
939.48
6,158.82
0.10%
100.00%