Sie sind auf Seite 1von 1

PREPARED :

PROJECT:
DATE :

REVISED

CHECKED :

SUBJECT: Calculation of Load & Load Study of (05-WTP)


MDB (WATER TREATMENT PLANT STATION):
Source of Feeding:
1. 2(3CX300m+ 1X150mmG) PVC , 0.6/1.2 KV FEEDER FROM SEC KWHM BOX
2. ONE GENERATOR 400KVA
Connected load:
1. FIRE PUMP 45KW.
2. TRANSFORMER BUILDING PANEL EPPIB06 6.31KVA (REFER TO 05-IB06-EE-101).
3. WATER PUMP ROOM PANEL EPPIB02 13.13KVA (REFER TO 05-IB02-EE-101).
4. GUARD ROOM PANEL EPPIB08 8.83KVA (REFER TO 05-IB08-EE-101).
5. ADMINSTRATION BUILDING PANEL EPPIB12 8.07KVA (REFER TO 05-IB12-EE-101).
6. MCC-WTP02-05 PANEL 168.5KVA.
7. GENERATOR ROOM PANEL EPPIB11 18.65KVA (REFER TO 05-IB11-EE-101).
8. DRAINAGE PUMP ROOM EPPIB17 7.14KVA (REFER TO 05-IB17-EE-101).
9. R.O BUILDING PANEL EPPIB14 35.48KVA (REFER TO 05-IB14-EE-101).
10. MCC-WTP01-05 PANEL 25KVA.
All Equations:
Equation
S Ge =3IV.
1.
Equation
S motor =3IV.
2.
Equation
Rating current of cables = If / D.F.
3.
Equation
Rating current of C.B. = If 1.25 .
4.
Equation
Single phase voltage drop = 2 x I x L x VD(mV/A/m) / 1000
5.
Equation
Three phase voltage drop = I x L x VD (mV/A/m) / 1000
6.
Symbols :

KVA
KVA
A
A
V
V

S = Three phase Apparent Power

KVA

P = Three phase Active Power

KW

Q = Three phase Reactive Power

KVAR

I = Current

V = Voltage

If = Full Load Current

VD = Voltage Drop

L = Length of Circuits

LOAD CALCULATION:
NO

LOAD TYPE

POWER (KVA)

VOLTAGE

POWER
FACTOR %

RATING
CURRENT

TYPE
OPERATION

FIRE PUMP

56.25

400

80

81.19

DUTY

EPPIB06

6.31

400

80

9.11

DUTY

EPPIB02

13.13

400

80

18.95

DUTY

EPPIB08

8.83

400

80

12.75

DUTY

EPPIB12

8.07

400

80

11.65

DUTY

MCC-WTP02-05

168.50

400

80

243.21

DUTY

EPPIB11

18.65

400

80

26.92

DUTY

EPPIB17

9.64

400

80

13.91

DUTY

EPPIB14

35.48

400

80

51.21

DUTY

10

MCC-WTP01-05

25.00

400

80

36.08

DUTY

DEMAND LOAD

349.86

400

80

504.99

EMERGENCY
LOAD

293.61

400

80

423.80

S GEN.

367.01

KVA

S TR.

437.33

KVA

SIZING OF GENERATOR

1x400KVA

SIZING OF TRANSFORMER

1x500KVA

SELECTION CABLE ,C.B. AND V.D CALCULATION :


No.

From

To

Total load
(KVA)

Circuit
Voltage (V)

If

(D.F.)

Rating
Current of
Cable (A)

Selection
Current of
Cable (A)

Cable Size
(mm2)

TR

MDP

349.86

400

504.9794129

0.7

721.3991614

2x405

2(3x300+150)

GEN

MDP

293.61

400

423.7895313

0.7

605.4136162

2x310

2(3x185+95)

MDP

FIRE PUMP

56.25

400

81.1898816

0.7

115.9855451

180

4x70+35

MDP

EPPIB06

6.31

400

9.107700496

0.7

13.01100071

45

4x6+6

MDP

EPPIB02

13.13

400

18.95152259

0.7

27.07360369

60

4x10+10

MDP

EPPIB08

8.83

400

12.74500719

0.7

18.20715313

60

4x10+10

MDP

EPPIB12

8.07

400

11.64804168

0.7

16.64005954

60

4x10+10

MDP

MCC-WTP02-05

168.50

400

243.2088009

0.7

347.4411441

365

4x240+120

MDP

EPPIB11

18.65

400

26.9189563

0.7

38.45565186

60

4x10+10

10

MDP

EPPIB17

9.64

400

13.91414149

0.7

19.87734498

60

4x10+10

11

MDP

EPPIB14

35.48

400

51.21096888

0.7

73.15852697

102

4x25+16

12

MDP

MCC-WTP01-05

25.00

400

36.08439182

0.7

51.54913118

75

4x16+16

Cable type
CU,
XLPE/PVC
CU,
XLPE/PVC
CU,
XLPE/PVC
CU,
XLPE/PVC
CU,
XLPE/PVC
CU,
XLPE/PVC
CU,
XLPE/PVC
CU,
XLPE/PVC
CU,
XLPE/PVC
CU,
XLPE/PVC
CU,
XLPE/PVC
CU,
XLPE/PVC

Rating
current of
C.B.

Select
C.B.

Total
length (m)

Cable
Total
V.D
Cable
(mv/A/m) V.D (V)

V.D
V.D % Accumulati
on (%)

631.22427

800

10

0.0885

0.4469

0.1117

0.1117267

529.73691

630

35

0.1205

1.7873

0.4468

0.4468331

202.9747

250

95

0.52

4.0108

1.0027

1.1144217

11.384626

32

5.191

0.2364

0.0591

0.1708243

23.689403

40

90

3.094

5.2772

1.3193

1.4310369

15.931259

40

15

3.094

0.5915

0.1479

0.2596006

14.560052

40

20

3.094

0.7208

0.1802

0.2919219

304.011

400

45

0.201

2.1998

0.55

0.6616826

33.648695

40

25

3.094

2.0822

0.5205

0.632272

17.392677

40

50

3.094

2.1525

0.5381

0.6498561

64.013711

80

40

1.276

2.6138

0.6535

0.7651787

45.10549

63

95

1.982

6.7943

1.6986

0.2919219