Sie sind auf Seite 1von 3

Exhibit 7.

7 - Circuit Board Fabricators - Process Data


Required Output per shift

1000

Average Job Size (boards)

60

Production hours per day

7.5

Working Days per Week

Number of
Machines

Number of
Employees

Setup Time
(min. per job)

Run Time
(min. per part)

Load

0.33

Clean

0.50

Coat

0.50

Unload

Expose

15

1.72

Load

0.33

Develop

Inspect

Bake

Unload

Drilling

15

1.50

Copper Plate

0.20

Process/Machine

0.33

0.33
2

0.50
0.33
0.33

Final Test

15

2.69

Exhibit 7.7 - Circuit Board Fabricators - Process Data


Required Output per shift
Average Job Size (boards)
Production hours per day
Working Days per Week

1000
60
7.5
5

75

Number of
Machines
1
1
1
1

Number of
Employees
1

Setup Time
(min. per job)
5

Run Time
(min. per part)
0.33
0.50
0.50
0.33

Expose

15

1.72

75.00

144.00

15.63

Load
Develop
Inspect
Bake
Unload

1
1
2
1
1

0.33
0.33
0.50
0.33
0.33

75.00
75.00
75.00
63.75
63.75

29.75
24.75
37.50
21.04
21.04

15.13
18.18
24.00
21.39
21.39

Drilling

15

1.50

63.75

110.63

24.41

Copper Plate

0.20

63.75

17.75

25.35

Final Test

15

2.69

63.75

186.49

14.48

Process/Machine
Load
Clean
Coat
Unload

Output

2
1

Average Size of Operation time Capacity per day


Job (boards)
per order
(jobs)
75.00
29.75
15.13
75.00
37.50
12.00
75.00
37.50
12.00
75.00
24.75
18.18

60.56
Total capacity (boards/day) =

12.00
726.75

Das könnte Ihnen auch gefallen