1000
60
7.5
Number of
Machines
Number of
Employees
Setup Time
(min. per job)
Run Time
(min. per part)
Load
0.33
Clean
0.50
Coat
0.50
Unload
Expose
15
1.72
Load
0.33
Develop
Inspect
Bake
Unload
Drilling
15
1.50
Copper Plate
0.20
Process/Machine
0.33
0.33
2
0.50
0.33
0.33
Final Test
15
2.69
1000
60
7.5
5
75
Number of
Machines
1
1
1
1
Number of
Employees
1
Setup Time
(min. per job)
5
Run Time
(min. per part)
0.33
0.50
0.50
0.33
Expose
15
1.72
75.00
144.00
15.63
Load
Develop
Inspect
Bake
Unload
1
1
2
1
1
0.33
0.33
0.50
0.33
0.33
75.00
75.00
75.00
63.75
63.75
29.75
24.75
37.50
21.04
21.04
15.13
18.18
24.00
21.39
21.39
Drilling
15
1.50
63.75
110.63
24.41
Copper Plate
0.20
63.75
17.75
25.35
Final Test
15
2.69
63.75
186.49
14.48
Process/Machine
Load
Clean
Coat
Unload
Output
2
1
60.56
Total capacity (boards/day) =
12.00
726.75