Beruflich Dokumente
Kultur Dokumente
DATE:
Fixture To Be Protected
3 Compartment Sink
Volume
Cubic Inches Gallons
0.00
0.00
Proposed Unit:
Unit is Sized to protect ___, _________________ with a ____ minute drain time.
installed to provide for the drain time as specified.
0.00
GPM Rating
ATURE