Please note that there will be work on the electricity network of medium pressure on live lines ,So turn the Auto reclose to be from (On) to (OFF) Date of Hot line order: / /2013 Approximate time wanted : hrs
Hot line order number:
(( )) Circuit or line location of works :
Work to be done on line/For :
Field Engineer Name:
Field Supervisor phone number: Any permanent changes on the network: Switch location to turn from auto to manual:
Hot line ordered requested by:
Approved by ( live line engineer): Approved by ( technical manager): Hot Line issued Date :