Summary Details
Technology Type
1,040,000
Duration at Rated
Power (HH:MM)
0:0.00
Description
Web Link
http://documents.worldbank.org/curated/en/2011/04/141714
27/indonesia-upper-cisokan-pumped-storage-power-project
Status
Under Construction
Construction Date
Jan 01 2014
Commissioning Date
Jan 01 2018
City
Bandung
State/Province
West Java
Country
Indonesia
ISO/RTO
N/A
Utility
Utility Type
Federally Owned
Grid Interconnection
Transmission
Ownership Model
Utility-Owned
Equity Owner 1
Developer
Debt Provider
World Bank
CAPEX ($)
$800,000,000.00
Benefits
Service/Use Case 1
Service/Use Case 2
Contact Name
Contact Email
nsebayang@pln.co.id
Contact Phone
(62-21) 726-1875/726-1122
Project Status
Siting
Metadata
Google Map
Record Created
Last Updated
Latitude
-6.91
Longitude
107.61
This data is preliminary as we are still verifying the entry with the equity owner of the project. If you
or someone you know is associated with this project and can provide confirmation of the existing
data, or additional data, please click the Verify Project button on the right.
This report was created using a record on the DOE Global Energy Storage Database, a free
database of up-to-date information on grid-connected energy storage projects and relevant
policies. To access the DOE Global Energy Storage Database, please visit:
http://www.energystorageexchange.org
For more information on energy storage, including the DOE Energy Storage Systems Program,
please visit:
http://sandia.gov/ess/