DOCUMENT STATUS: FOR CONSTRUCTION

1
0
Rev.

Revision after nozzles calculation


General rev.

10.09.05
08.08.05
Date

Description

Drwn.

Chkd.

Appd.

UONG BI 300 MW EXTENSION POWER PLANT


Owner:

EPC Contractor:

Subcontractor:

Document Title:

Turbine Plant

. .

Superheater spray system.


System Description
Project No.
Designed by:
Function

Approved
Checked
Drawn

Format: 4 (297210)
Name
Kuyumchan
Novikov
Bragin

Sign

Total Pages: 13

Date
4.08.04
4.08.04
4.08.04
Date:
10.09.05

This drawing may not be


reproduced or transmitted to
other organization or persons
without permission of JSC
CENTRE OF ENGINEERING UESR
branch Institute Teploelektroproject

. .

Document No.: UBEX1-M1&2-M-08-LAE-1354

RUSSIA MOSCOW

175N9-10UHJ-1354-TD.M.1

Rev:
1

STAGE

SHEET

SHEETS

WD

13

UONG BI 300 MW EXTENSION POWER PLANT


Boiler Plant
Superheater spray system.
System Description

. PI.
Format: 4

CONTENTS:
I.
1.1
1.2
1.3

Function.................................................................................................................................
Description.............................................................................................................................
Process monitoring................................................................................................................
II.

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9

2.10

2.11
2.12
2.13
2.14
2.15
2.16

2.17

P&I DIAGRAM PROCESS DESCRIPTION............................................................3

CONTROL CONDITIONS..........................................................................................7

Common gate valve LAE10AA201 on the superheater normal sprays No.1......................


Control valve LAE11AA001 (LAE12AA001) on the superheater normal spray
No.1........................................................................................................................................
Gate valve LAE11AA201 (LAE12AA201) on the superheater normal spray No.1............
Valves LAE11AA260, LAE12AA260 and LAE11AA262 on the superheater normal
sprays No.1 blowdown...........................................................................................................
Common gate valve LAE20AA201 on the superheater starting sprays No.1.....................
Valve LAE21AA201, LAE21AA202 (LAE22AA201, LAE22AA202) on the
superheater starting spray No.1............................................................................................
Valves LAE21AA260, LAE21AA261, LAE22AA260, LAE22AA261 and
LAE21AA262 on the superheater starting sprays No.1 blowdown.....................................
Common gate valve LAE30AA201 on the superheater starting sprays No.2.....................
Valve LAE31AA201, LAE31AA202, LAE31AA203, LAE31AA204 (LAE32AA201,
LAE2AA202, LAE32AA203, LAE32AA204) on the superheater starting spray
No.2........................................................................................................................................
Valves LAE31AA260, LAE31AA261, LAE31AA262, LAE31AA263 and
LAE31AA264, LAE32AA260, LAE32AA261, LAE32AA262, LAE32AA263 and
LAE32AA264 on the superheater starting sprays No.2 blowdown...................................
Common gate valve LAE40AA201 on the superheater normal sprays No.3....................
Control valve LAE41AA001 (LAE42AA001) on the superheater normal spray
No.3......................................................................................................................................
Gate valve LAE41AA201 (LAE42AA201) on the superheater normal spray No.3.
..............................................................................................................................................
Valves LAE41AA260, LAE42AA260 LAE41AA261 on the superheater normal
sprays No.3 blowdown.........................................................................................................
Common gate valve LAE50AA201 on the superheater starting sprays No.3....................
Valve LAE51AA201, LAE51AA202, LAE51AA203, LAE51AA204 (LAE52AA201,
LAE52AA202, LAE52AA203, LAE52AA204) on the superheater starting spray
No.3......................................................................................................................................
Valves LAE51AA260, LAE51AA261, LAE51AA262, LAE51AA263 and
LAE51AA264, LAE52AA260, LAE52AA261, LAE52AA262, LAE52AA263 and
LAE52AA264 on the superheater starting sprays No.3 blowdown...................................
III. INTERRELATION WITH OTHER SYSTEMS.......................................................13

I.

P&I DIAGRAM PROCESS DESCRIPTION.


1.1

Function.

Feed water pipelines system - LAE - supplies feed water from BFPs discharge pipeline for
sprays into the superheater attemperators to regulate the main steam temperature.

1.2

Description.

In each stream of superheater, three spray attemperators located between the heating
surfaces are installed.
Each spray No.1, 3 attemperator is equipped with centrifugal atomizers for starting sprays,
and spray atomizers for normal sprays during boiler operation (at 30 to 100% of the nominal load);
spray No.2 attemperators are the starting ones. Feed water is supplied to each attemperator
atomizer by an individual pipeline.
Feed water for normal sprays No.1 (to two attemperator atomizers on each stream of
superheater) is supplied from the common spray pipeline by a DN 80 pipeline, on which common
motorized isolating valve LAE10AA201 is installed. On DN 50 pipeline of the normal spray No.1
into each stream of superheater, normal spray No.1 control valve LAE11AA001 (LAE12AA001)
and isolating valve LAE11AA201 (LAE12AA201) are installed. Before isolating valve
LAE11AA201 (LAE12AA201) there is a drain line, on which manual isolating valves
LAE11AA530, LAE11AA531 (LAE12AA530, LAE12AA531) are installed. After isolating valve
LAE11AA201 (LAE12AA201) there is a blowdown line DN 20, on which motorized isolating
valve LAE11AA260, (LAE12AA260) is installed. The blowdown lines of normal spray No.1
connect into a DN 20 common pipeline, on which motorized isolating valve LAE11AA262 is
installed. Each line is blown down in turn.
Feed water for starting sprays No.1 (to two attemperator atomizers on each stream of
superheater) is supplied from the common spray pipeline by a DN 65 pipeline, on which common

. .

. .

motorized isolating valve LAE20AA201 is installed. Feed water for starting sprays No.1 is
supplied to each stream attemperator by a DN 40 pipeline, and further to each attemperator
atomizer by DN 20 pipelines, on which motorized isolating valves LAE21AA201, LAE21AA202
(LAE22AA201, LAE22AA202) are installed. Installation of control valves on the starting spray
lines into superheater attemperator No.1 is not provided for: feed water pressure on the starting
sprays is maintained according to the boiler drum pressure by means of control valve
LAE02AA001 ( UBEX1-M1&2-M-52-LA-1354-3) on discharge line from superheater spray
station to deaerator.

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

On the drain line of starting spray No.1 pipelines, manual isolating valves LAE20AA530,
LAE20AA531 are installed.
After shutoff gate valves LAE21AA201, LAE21AA202 (LAE22AA201, LAE22AA202)
there are blowdown lines DN 20, on which motorized isolating valves LAE21AA260,
LAE21AA261 (LAE22AA260, LAE22AA261) are installed. The blowdown lines of starting spray
No.1 connect into a DN 20 common pipeline, on which motorized isolating valve LAE21AA262 is
installed. Each line is blown down in turn.
Feed water for starting sprays No.2 into the superheater (to four attemperator atomizers on
each stream of superheater) is supplied from the common spray pipeline by a DN 65 pipeline, on
which common motorized isolating valve LAE30AA201 is installed. Feed water for starting sprays
No.2 is supplied to each stream attemperator by a DN 50 pipeline, and further to each attemperator
atomizer by DN 20 pipelines, on which motorized isolating valves LAE31AA201, LAE31AA202,
LAE31AA203, LAE31AA204 (LAE32AA201, LAE32AA202, LAE32AA203, LAE32AA204) are
installed. Installation of control valves on the starting spray lines into superheater attemperator
No.2 is not provided for: feed water pressure on the starting sprays is maintained according to the
boiler drum pressure by means of control valve LAE02AA001 ( UBEX1-M1&2-M-52-LA-13543 ) on discharge line from superheater spray station to deaerator.
On the drain line of starting spray No.2 pipelines, manual isolating valves LAE30AA530,
LAE30AA531 are installed. After isolating valves LAE31AA201, LAE31AA202, LAE31AA203,
LAE31AA204 (LAE32AA201, LAE32AA202, LAE32AA203, LAE32AA204) the blowdown
lines DN 20 from each spray No.2 line are provided, on which motorized isolating valves
LAE31AA260, LAE31AA261, LAE31AA262, LAE31AA263 (LAE32AA260, LAE32AA261,
LAE32AA262, LAE32AA263) are installed. The blowdown lines of each stream of starting spray
No.2 connect into a DN 20 common pipeline, on which motorized isolating valve LAE31AA264
(LAE32AA264) is installed. Each line is blown down in turn.

. .

Feed water for normal spray No.3 (one spray into attemperator on each stream of
superheater) is supplied from the common spray pipeline by a DN 50 pipeline, on which motorized
isolating valve LAE40AA201 is installed. Feed water for normal spray No.3 is supplied to each
stream attemperator by a DN 40 pipeline, on which normal spray No.3 control valve LAE41AA001

. .

(LAE42AA001) and motorized isolating valve LAE41AA201 (LAE42AA201) are installed.


Before isolating valve LAE41AA201 (LAE42AA201) there is a drain line, on which two manual
isolating valves LAE41AA530, LAE41AA531 (LAE42AA530, LAE42AA531) are installed. After
isolating valve LAE41AA201 (LAE42AA201) there is a blowdown line, on which motorized
isolating valve LAE41AA260 (LAE42AA260) is installed. The blowdown lines of normal spray
Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

No.3 connect into a common pipeline DN 20, on which common motorized isolating valve
LAE41AA261 is installed. Each line is blown down in turn.
Feed water for starting sprays No.3 into the superheater (to four attemperator atomizers on
each stream of superheater) is supplied from the common spray pipeline by a DN 65 pipeline, on
which common motorized isolating valve LAE50AA201 is installed. Feed water for starting sprays
No.3 is supplied to each stream attemperator by a DN 50 pipeline, and further to each attemperator
atomizer by DN 20 pipelines, on which motorized isolating valves LAE51AA201, LAE51AA202,
LAE51AA203, LAE51AA204 (LAE52AA201, LAE52AA202, LAE52AA203, LAE52AA204) are
installed. Installation of control valves on the starting spray lines into superheater attemperator
No.3 is not provided for: feed water pressure on the starting sprays is maintained according to the
boiler drum pressure by means of control valve LAE02AA001 ( UBEX1-M1&2-M-52-LA-1354
-3) on discharge line from superheater spray station to deaerator.
On the drain line of starting spray No.3 pipelines, manual isolating valves LAE50AA530,
LAE50AA531 are installed. After isolating valves LAE51AA201, LAE51AA202, LAE51AA203,
LAE51AA204 (LAE52AA201, LAE52AA202, LAE52AA203, LAE52AA204) the blowdown
lines DN 20 from each starting spray No.3 line are provided, on which motorized isolating valves
LAE51AA260, LAE51AA261, LAE51AA262, LAE51AA263 (LAE52AA260, LAE52AA261,
LAE52AA262, LAE52AA263) are installed. The blowdown lines of each stream of starting spray
No.3 connect into a DN 20 common pipeline, on which motorized isolating valve LAE51AA264
(LAE52AA264) is installed. Each line is blown down in turn.
Drain lines of the superheater spray pipeliness are combined into a DN 40 common header
and connect into the turbine hall LP drains flash tank.
Blowdown lines of the superheater spray pipeliness ( atomizers ) are combined into a DN
20 common header and connect into the boiler blowdown tank. Spray atomizers are blown down in
turn.

. .

Process monitoring.

There is a flow measurement in every pipeline for the boiler superheater normal and startup spray:
normal spray 1 line 1 measurements LAE11CF001 and LAE11CF011;
normal spray 1 line 2 measurements LAE12CF001 and LAE12CF011;
normal spray 3 line 1 measurements LAE41CF001 and LAE41CF011;

. .

1.3

normal spray 3 line 2 measurements LAE42CF001 and LAE42CF011;


start-up spray 1 line 1 measurements LAE21CF001 and LAE21CF011;
Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

start-up spray 1 line 2 measurements LAE22CF001 and LAE22CF001;


start-up spray 2 line 1 measurements LAE31CF001 and LAE31CF011;
start-up spray 2 line 2 measurements LAE32CF001 and LAE32CF011;
start-up spray 3 line 1 measurements LAE51CF001 and LAE51CF011;
start-up spray 3 line 2 measurements LAE52CF001 and LAE52CF011.
Flow signals are used for monitoring and for recording in ICMS.
A pair of transmitters is required for flow measurement in a wide range. One of them
measures flow in the range 0-25 % and the other one in the range 25-100%. The following table
indicates the exact measuring ranges both in pressure difference units and in flow units for every
transmitter:
KKS code

Flow measuring

measuring range, kgf/cm2

range, t/h

00.25

416

00.016

04

00.25

28

00.016

02

00.25

28

00.016

02

00.25

416

00.016

04

00.25

412.5

00.025

04

For flow measurement correction, there is temperature measurement LAE01CT002 in the


common feed water supply pipeline for superheater sprays.

. .

. .

LAE11CF001 and
LAE12CF001
LAE11CF011 and
LAE12CF011
LAE41CF001 and
LAE42CF001
LAE41CF011 and
LAE42CF011
LAE21CF001 and
LAE22CF001
LAE21CF011 and
LAE22CF011
LAE31CF001 and
LAE32CF001
LAE31CF011 and
LAE32CF011
LAE51CF001 and
LAE52CF001
LAE51CF011 and
LAE52CF011

Pressure difference

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

II.

CONTROL CONDITIONS.

Feed water supply piping system for superheater sprays operates continuously when the
power unit is in operation and during startup.

2.1 Common gate valve LAE10AA201 on the superheater normal sprays No.1.
Gate valve LAE10AA201 on the superheater normal sprays No.1 is opened during unit
start-up after boiler ignition.
2.1.1

Gate valve LAE10AA201 on the superheater sprays No.1 is controlled by the

ICMS, and is involved in protection and functional-group control (FGC) process algorithms
of Boiler steam-water circuit.
2.1.2

Gate valve LAE10AA201 on the superheater sprays No.1 is automatically

closed with inhibit of opening upon operation of protections acting on the boiler shutdown.
2.1.3

Gate valve LAE10AA201 on the superheater sprays No.1 can be remote

(manually) closed at all times, and can be opened if this is not prohibited by commands
from the protection circuits.

2.2 Control valve LAE11AA001 (LAE12AA001) on the superheater normal spray No.1.
Normal spray No.1 regulators maintain the required temperature in the intermediate point
of each stream superheater under normal operating conditions of the unit, are implemented by the
ICMS and control the operation of normal spray No.1 control valves.
2.2.1

Control valve LAE11AA001 (LAE12AA001) on the normal spray No.1 is

controlled by the ICMS, and is involved in regulation and functional-group control (FGC)
process algorithms of Boiler steam-water circuit.
2.2.2

Control valve LAE11AA001 (LAE12AA001) on the superheater normal

spray No.1 can be remote (manually) closed and opened at all times.

2.3 Gate valve LAE11AA201 (LAE12AA201) on the superheater normal spray No.1.
. .

2.3.1

controlled by the ICMS, and is involved in functional-group control (FGC) process


algorithms of Boiler steam-water circuit.
2.3.2

Gate valve LAE11A201 (LAE12AA201) on the superheater normal spray

No.1 is automatically opened when control valve LAE11AA001 (LAE12AA001) opens to


. .

Gate valve LAE11A201 (LAE12AA201) on the normal spray No.1 is

20% of its full stroke.

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.3.3

Gate valve LAE11A201 (LAE12AA201) on the superheater normal spray

No.1 is automatically closed with a time delay of 30 s when control valve LAE11AA001
(LAF12AA001) closes to 20% of its full stroke.
2.3.4

Gate valve LAE11A201 (LAE12AA201) on the normal spray No.1 can be

remote (manually) closed and opened at all times.

2.4 Valves LAE11AA260, LAE12AA260 and LAE11AA262 on the superheater normal


sprays No.1 blowdown.
2.4.1

Each valve LAE11AA260, LAE12AA260, LAE11AA262 on the superheater

normal sprays No. 1 blowdown is controlled by the ICMS, and is involved in functionalgroup control (FGC) process algorithm of Boiler steam-water circuit.
2.4.2

Each valve LAE11AA260, LAE12AA260, LAE11AA262 on the superheater

normal sprays No. 1 blowdown can be remote (manually) closed at all times, and can be
opened in accordance with the Operating Manual.

2.5 Common gate valve LAE20AA201 on the superheater starting sprays No.1.
Gate valve LAE20AA201 on the superheater starting sprays No.1 is opened during unit
start-up after boiler ignition.
2.5.1

Gate valve LAE20AA201 on the starting sprays No.1 is controlled by the

ICMS, and is involved in protection and functional-group control (FGC) process algorithms
of Boiler steam-water circuit.
2.5.2

Gate valve LAE20AA201 on the starting sprays No.1 is automatically closed

with inhibit of opening upon operation of protections acting on the boiler shutdown.
2.5.3

Gate valve LAE20AA201 on the superheater starting sprays No.1 can be

remote (manually) closed at all times, and can be opened if this is not prohibited by
commands from the protection circuits, and if the boiler load does not exceed 30% of the
nominal load.
. .

2.6 Valve LAE21AA201, LAE21AA202 (LAE22AA201, LAE22AA202) on the


superheater starting spray No.1.
2.6.1

Valve LAE21AA201, LAE21AA202 (LAE22AA201, LAE22AA202) on the

starting spray No.1 is controlled by the ICMS, and is involved in functional-group control

. .

(FGC) process algorithm.


2.6.2

Valves LAE21AA201, LAE21AA202 (LAE22AA201, LAE22AA202) on

the starting spray No.1 are controlled by commands from FGC of Boiler steam-water
circuit.
Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.6.3

Valves LAE21AA201, LAE21AA202 (LAE22AA201, LAE22AA202) on

the starting spray No.1 can be remote (manually) closed and opened at all times.

2.7 Valves LAE21AA260, LAE21AA261, LAE22AA260, LAE22AA261 and


LAE21AA262 on the superheater starting sprays No.1 blowdown.
2.7.1

Each valve LAE21AA260, LAE21AA261, LAE22AA260, LAE22AA261,

LAE21AA262 on the superheater starting sprays No. 1 blowdown is controlled by the


ICMS, and is involved in functional-group control process algorithm.
2.7.2

Each valve LAE21AA260, LAE21AA261, LAE22AA260, LAE22AA261,

LAE22AA262 on the superheater normal sprays No. 1 blowdown can be remote (manually)
closed at all times, and can be opened in accordance with the Operating Manual.

2.8 Common gate valve LAE30AA201 on the superheater starting sprays No.2.
Gate valve LAE30AA201 on the superheater starting sprays No.2 is opened during unit
start-up after boiler ignition.
2.8.1

Gate valve LAE30AA201 on the starting sprays No.2 is controlled by the

ICMS, and is involved in protection and functional-group control (FGC) process algorithms
of Boiler steam-water circuit.
2.8.2

Gate valve LAE30AA201 on the starting sprays No.2 is automatically closed

with inhibit of opening upon operation of protections acting on the boiler shutdown.
2.8.3

Gate valve LAE30AA201 on the superheater starting sprays No.2 can be

remote (manually) closed at all times, and can be opened if this is not prohibited by
commands from the protection circuits, and if the boiler load does not exceed 30% of the
nominal load.

2.9 Valve LAE31AA201, LAE31AA202, LAE31AA203, LAE31AA204 (LAE32AA201,


LAE2AA202, LAE32AA203, LAE32AA204) on the superheater starting spray No.2.
2.9.1

Valve

LAE31AA201,

LAE31AA202,

LAE31AA203,

LAE31AA204

. .

(LAE32AA201, LAE32AA202, LAE32AA203, LAE32AA204) on the starting spray No.2


is controlled by the ICMS, and is involved in functional-group control (FGC) process
algorithm.
2.9.2

Valves

LAE31AA201,

LAE31AA202,

LAE31AA203,

LAE31AA204

(LAE32AA201, LAE32AA202, LAE32AA203, LAE32AA204) on the starting spray No.2


are controlled by commands from FGC of Boiler steam-water circuit.
2.9.3

Valve

LAE31AA201,

LAE31AA202,

LAE31AA203,

LAE31AA204

(LAE32AA201, LAE32AA202, LAE32AA203, LAE32AA204) on the starting spray No.2

. .

can be remote (manually) closed and opened at all times.


Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.10 Valves LAE31AA260, LAE31AA261, LAE31AA262, LAE31AA263 and


LAE31AA264, LAE32AA260, LAE32AA261, LAE32AA262, LAE32AA263 and
LAE32AA264 on the superheater starting sprays No.2 blowdown.
2.10.1

Each valve LAE31AA260, LAE31AA261, LAE31AA262, LAE31AA263

and LAE31AA264, LAE32AA260, LAE32AA261, LAE32AA262, LAE32AA263 and


LAE32AA264 on the superheater starting sprays No. 2 blowdown is controlled by the
ICMS, and is involved in functional-group control process algorithm.
2.10.2

Each valve LAE31AA260, LAE31AA261, LAE31AA262, LAE31AA263,

LAE31AA264

(LAE32AA260,

LAE32AA261,

LAE32AA262,

LAE32AA263,

LAE32AA264) on the superheater sprays No. 2 blowdown can be remote (manually) closed
at all times, and can be opened in accordance with the Operating Manual.

2.11 Common gate valve LAE40AA201 on the superheater normal sprays No.3.
Gate valve LAE40AA201 on the superheater normal sprays No.3 is opened during unit
start-up after boiler ignition.
2.11.1

Gate valve LAE40AA201 on the superheater sprays No.3 is controlled by the

ICMS, and is involved in protection and functional-group control (FGC) process algorithms
of Boiler steam-water circuit.
2.11.2

Gate valve LAE40AA201 on the superheater sprays No.3 is automatically

closed with inhibit of opening upon operation of protections acting on the boiler shutdown.
2.11.3

Gate valve LAE40AA201 on the superheater sprays No.3 can be remote

(manually) closed at all times, and can be opened if this is not prohibited by commands
from the protection circuits.

2.12 Control valve LAE41AA001 (LAE42AA001) on the superheater normal spray


No.3.
Normal spray No.3 regulators maintain the required temperature in the intermediate point
ICMS and control the operation of normal spray No.3 control valves.
2.12.1

. .

Control valve LAE41AA001 (LAE42AA001) on the normal spray No.3 is

controlled by the ICMS, and is involved in regulation and functional-group control (FGC)
process algorithms of Boiler steam-water circuit.
2.12.2

. .

of each stream superheater under normal operating conditions of the unit, are implemented by the

Control valve LAE41AA001 (LAE42AA001) on the superheater normal

spray No.3 can be remote (manually) closed and opened at all times.

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.13 Gate valve LAE41AA201 (LAE42AA201) on the superheater normal spray No.3.
2.13.1

Gate valve LAE41AA201 (LAE42AA201) on the normal spray No.3 is

controlled by the ICMS, and is involved in FGC process algorithms of Boiler steam-water
circuit.
2.13.2

Gate valve LAE41AA201 (LAE42AA201) on the superheater normal spray

No.3 is automatically opened when control valve LAE41AA001 (LAE42AA001)


commences opening.
2.13.3

Gate valve LAE41AA201 (LAE42AA201) on the superheater normal spray

No.3 is automatically closed with a time delay of 30 s upon closing of control valve
LAE41AA001 (LAF42AA001).
2.13.4

Gate valve LAE41AA201 (LAE42AA201) on the normal spray No.3 can be

remote (manually) closed and opened at all times.

2.14 Valves LAE41AA260, LAE42AA260 LAE41AA261 on the superheater normal


sprays No.3 blowdown.
2.14.1

Each valve LAE41AA260, LAE42AA260 and LAE41AA261 on the

superheater normal sprays No. 3 blowdown is controlled by the ICMS, and is involved in
functional-group control (FGC) process algorithm of Boiler steam-water circuit.
2.14.2

Each valve LAE41AA260, LAE42AA260, LAE41AA261 on the superheater

sprays No. 3 blowdown can be remote (manually) closed at all times, and can be opened in
accordance with the Operating Manual.

2.15 Common gate valve LAE50AA201 on the superheater starting sprays No.3.
Gate valve LAE50AA201 on the superheater starting sprays No.3 is opened during unit
start-up after boiler ignition.
2.15.1

Gate valve LAE50AA201 on the starting sprays No.3 is controlled by the

ICMS, and is involved in protection and functional-group control (FGC) process algorithms
. .

of Boiler steam-water circuit.


2.15.2

Gate valve LAE50AA201 on the starting sprays No.3 is automatically closed

with inhibit of opening upon operation of protections acting on the boiler shutdown.
2.15.3

Gate valve LAE50AA201 on the superheater starting sprays No.3 can be

. .

remote (manually) closed at all times, and can be opened if this is not prohibited by
commands from the protection circuits, and if the boiler load does not exceed 30% of the
nominal load.

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

10

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.16 Valve LAE51AA201, LAE51AA202, LAE51AA203, LAE51AA204 (LAE52AA201,


LAE52AA202, LAE52AA203, LAE52AA204) on the superheater starting spray No.3.
2.16.1

Valve

LAE51AA201,

LAE51AA202,

LAE51AA203,

LAE51AA204

(LAE52AA201, LAE52AA202, LAE52AA203, LAE52AA204) on the starting spray No.3


is controlled by the ICMS, and is involved in functional-group control (FGC) process
algorithm.
2.16.2

Valves

LAE51AA201,

LAE51AA202,

LAE51AA203,

LAE51AA204

(LAE52AA201, LAE52AA202, LAE52AA203, LAE52AA204) on the starting spray No.3


are controlled by commands from FGC of Boiler steam-water circuit.
2.16.3

Valves

LAE51AA201,

LAE51AA202,

LAE51AA203,

LAE51AA204

(LAE52AA201, LAE52AA202, LAE52AA203, LAE52AA204) on the starting spray No.3


can be remote (manually) closed and opened at all times.

2.17 Valves LAE51AA260, LAE51AA261, LAE51AA262, LAE51AA263 and


LAE51AA264, LAE52AA260, LAE52AA261, LAE52AA262, LAE52AA263 and
LAE52AA264 on the superheater starting sprays No.3 blowdown.
2.17.1

Each valve LAE51AA260, LAE51AA261, LAE51AA262, LAE51AA263

and LAE51AA264, LAE52AA260, LAE52AA261, LAE52AA262, LAE52AA263 and


LAE52AA264 on the superheater starting sprays No. 3 blowdown is controlled by the
ICMS, and is involved in functional-group control process algorithm.
2.17.2

Each valve LAE51AA260, LAE51AA261, LAE51AA262, LAE51AA263,

LAE51AA264

(LAE52AA260,

LAE52AA261,

LAE52AA262,

LAE52AA263,

LAE52AA264) on the superheater sprays No. 3 blowdown can be remote (manually) closed

. .

. .

at all times, and can be opened in accordance with the Operating Manual.

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

11

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

III.
1)

INTERRELATION WITH OTHER SYSTEMS.

P&I Diagram of feed water pipelines

UBEX1-

M1&2-M-52-LA-1354-3
2) P&I Diagram of superheater spray system
3)

P&I Diagram of turbine hall steam line and pipe line

drains

UBEX1-M1&2-M-52-LFC-1360

4)

P&I Diagram of boiler drains, vents and auxiliary

pipelines

UBEX1-M1&2-M-52-LCQ-1359

5)

P&I Diagram of superheater pipelines

UBEX1-M1&2-M-52-LAE-1354-2

UBEX1-

. .

. .

M1&2-M-52-HAH-0001

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

12

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

. .

. .

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

13

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

I PI-...........................................................16
1.1
1.2
1.3

. 16
. 16
.

19

II ........................................................................................21
2.1
2.2
2.3
2.4
2.5
2.6
2.7

2.8
2.9

2.10

2.11
2.12

. .

2.13
2.14
2.15

. .

2.16

2.17

LAE10AA201 1
.
21
LAE11AA001 (LAE12AA001) 1
.
21
LAE11AA201 (LAE12AA201) 1
. 21
LAE11AA260, LAE12AA260 LAE11AA262
1 .
22
LAE20AA201 1
.
22
LAE21AA201, LAE21AA202 (LAE22AA201, LAE22AA202)
1 .
23
LAE21AA260, LAE21AA261, LAE22AA260, LAE22AA261
LAE21AA262 1
.
23
LAE30AA201 2
.
23
LAE31AA201, LAE31AA202, LAE31AA203, LAE31AA204
(LAE32AA201, LAE32AA202, LAE32AA203, LAE32AA204)
2 . 24
LAE31AA260, LAE31AA261, LAE31AA262, LAE31AA263
LAE31AA264, LAE32AA260, LAE32AA261, LAE32AA262, LAE32AA263
LAE32AA264 2
.
24
LAE40AA201 3
.
24
LAE41AA001 (LAE42AA001) 3
.
25
LAE41AA201 (LAE42AA201) 3
. 25
LAE41AA260, LAE42AA260 LAE41AA261
3 .
26
LAE50AA201 3
.
26
LAE51AA201, LAE51AA202, LAE51AA203, LAE51AA204
(LAE52AA201, LAE52AA202, LAE52AA203, LAE52AA204)
3 . 26
LAE51AA260, LAE51AA261, LAE51AA262, LAE51AA263
LAE51AA264, LAE52AA260, LAE52AA261, LAE52AA262, LAE52AA263
Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

14

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

LAE52AA264 3
.
27

. .

. .

III ......................................................28

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

15

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

I PI-.
1.1 .

- LAE -

.

1.2 .

( )

,
.
1, 3

, ( 30100% ),
2 .
.
1 (
)
80 ,
LAE10AA201 . 50
1
1 LAE11AA001 (LAE12AA001)

LAE11AA201

(LAE12AA201).

LAE11AA201

(LAE12AA201) ,
LAE11AA530, LAE11AA531 (LAE12AA530, LAE12AA531) .

. .

. .

LAE11AA201 (LAE12AA201) 20
, LAE11AA260 (LAE12AA260)
. 1
20 ,
LAE11AA262 . .
1 (
)
65 ,
LAE20AA201 . 1
Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

16

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

40
20 ,
LAE21AA201, LAE21AA202 (LAE22AA201, LAE22AA202) .
1
:

LAE02AA001 (UBEX1-M1&2-M-52-LA-1354-3)
.
1
LAE20AA530, LAE20AA531 .

LAE21AA201,

LAE21AA202

(LAE22AA201,

LAE22AA202) 20 ,
LAE21AA260, LAE21AA261 (LAE22AA260, LAE22AA261)
. 1
20 ,
LAE21AA262 . .
2 (
)
65 ,
LAE30AA201 .
2 50
20 ,

LAE31AA204

(LAE32AA201,

LAE31AA201,

LAE32AA202,

LAE31AA202,

LAE32AA203,

LAE31AA203,

LAE32AA204)

.
2 :

. .

. .


LAE02AA001 (UBEX1-M1&2-M-52-LA-1354-3)
.
2
LAE30AA530, LAE30AA531 .
LAE31AA201, LAE31AA202, LAE31AA203, LAE31AA204 (LAE32AA201,
LAE32AA202, LAE32AA203, LAE32AA204) 20 ,
LAE31AA260, LAE31AA261,
Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

17

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

LAE31AA262, LAE31AA263 (LAE32AA260, LAE32AA261, LAE32AA262, LAE32AA263)


. 2
20 ,
LAE31AA264 (LAE32AA264) .
.
3 (
)
50 ,
LAE40AA201 . 3
40 ,
3 LAE41AA001 (LAE42AA001)
LAE41AA201 (LAE42AA201) .

LAE41AA201

(LAE42AA201)

LAE41AA530,

LAE41AA531

(LAE42AA530, LAE42AA531) . LAE41AA201


(LAE42AA201) ,
LAE41AA260 (LAE42AA260) .
3 20 ,
LAE41AA261 .
.
3 (
)
65 ,
LAE50AA201 .
3 50

. .

. .

20 ,

LAE51AA204

(LAE52AA201,

LAE51AA201,

LAE52AA202,

LAE51AA202,

LAE52AA203,

LAE51AA203,

LAE52AA204)

.
3 :

LAE02AA001(UBEX1-M1&2-M-52-LA-1354 -3)
.

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

18

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

3
LAE50AA530, LAE50AA531 .
LAE51AA201, LAE51AA202, LAE51AA203, LAE51AA204 (LAE52AA201,
LAE52AA202, LAE52AA203, LAE52AA204) 3
20 ,

LAE51AA260,

LAE51AA261,

LAE51AA262,

LAE51AA263

(LAE52AA260, LAE52AA261, LAE52AA262, LAE52AA263) .


20 , LAE51AA264
(LAE52AA264) . .

40
.
()
20
. .

1.3 .

:
1 1 LAE11CF001 LAE11CF011;
1 2 LAE12CF001 LAE12CF011;
3 1 LAE41CF001 LAE41CF011;
3 2 LAE42CF001 LAE42CF011;
1 1 LAE21CF001 LAE21CF011;
1 2 LAE22CF001 LAE22CF001;

. .

. .

2 1 LAE31CF001 LAE31CF011;
2 2 LAE32CF001 LAE32CF011;
3 1 LAE51CF001 LAE51CF011;
3 2 LAE52CF001 LAE52CF011.
.

.
0-25 %, 25-100%.
Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

19

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4


:
KKS

/2

00.25

416

00.016

04

00.25

28

00.016

02

00.25

28

00.016

02

00.25

416

00.016

04

00.25

412.5

00.025

04

LAE11CF001
LAE12CF001
LAE11CF011
LAE12CF011
LAE41CF001
LAE42CF001
LAE41CF011
LAE42CF011
LAE21CF001
LAE22CF001
LAE21CF011
LAE22CF011
LAE31CF001
LAE32CF001
LAE31CF011
LAE32CF011
LAE51CF001
LAE52CF001
LAE51CF011
LAE52CF011

LAE01CT002

. .

. .

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

20

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

II .

.

2.1 LAE10AA201 1
.
LAE10AA201

.
2.1.1

LAE10AA201


- ()
.
2.1.2

LAE10AA201

,
.
2.1.3

() LAE10AA201 1
,
.

2.2 LAE11AA001 (LAE12AA001) 1


.
1

,
1.
2.2.1

LAE11AA001 (LAE12AA001)

. .

() .
2.2.2

()

LAE11AA001

(LAE12AA001) 1
.

. .

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

21

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.3 LAE11AA201 (LAE12AA201) 1


.
2.3.1

LAE11AA201 (LAE12AA201) 1

.

2.3.2

LAE11AA201 (LAE12AA201) 1

LAE11AA001 (LAE12AA001) 20% .

2.3.3

LAE11AA201 (LAE12AA201) 1
30
LAE11AA001 (LAF12AA001) 20% .

2.3.4

() LAE11AA201 (LAE12AA201)
1 .

2.4 LAE11AA260, LAE12AA260 LAE11AA262


1 .
2.4.1

LAE11AA260,

LAE12AA260,

LAE11AA262

1
() .
2.4.2

() LAE11AA260, LAE12AA260,
LAE11AA262 1
.

2.5 LAE20AA201 1
.
LAE20AA201

. .

.
2.5.1

LAE20AA201


- ()

. .

.
2.5.2

LAE20AA201

,
.
Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

22

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.5.3

() LAE20AA201
1 ,

30% .

2.6 LAE21AA201, LAE21AA202 (LAE22AA201, LAE22AA202)


1 .
2.6.1

LAE21AA201, LAE21AA202 (LAE22AA201, LAE22AA202)


1
- .

2.6.2

LAE21AA201, LAE21AA202 (LAE22AA201,


LAE22AA202) 1
.

2.6.3

()

LAE21AA201,

LAE21AA202

(LAE22AA201, LAE22AA202) 1
.

2.7 LAE21AA260, LAE21AA261, LAE22AA260, LAE22AA261


LAE21AA262 1 .
2.7.1

LAE21AA260,

LAE21AA261,

LAE22AA260,

LAE22AA261, LAE21AA262 1

- .
2.7.2

() LAE21AA260, LAE21AA261,
LAE22AA260, LAE22AA261, LAE22AA262 1

.

. .

2.8 LAE30AA201 2
.
LAE30AA201
.
2.8.1

LAE30AA201


. .

- ()
.
Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

23

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.8.2

LAE30AA201

,
.
2.8.3

() LAE30AA201
2 ,

30% .

2.9 LAE31AA201, LAE31AA202, LAE31AA203, LAE31AA204 (LAE32AA201,


LAE32AA202, LAE32AA203, LAE32AA204) 2
.
2.9.1

LAE31AA201, LAE31AA202, LAE31AA203, LAE31AA204


(LAE32AA201, LAE32AA202, LAE32AA203, LAE32AA204) 2

- .

2.9.2

LAE31AA201, LAE31AA202, LAE31AA203,


LAE31AA204

(LAE32AA201,

LAE32AA202,

LAE32AA203,

LAE32AA204)

2 .
2.9.3

LAE31AA203,

()

LAE31AA204

(LAE32AA201,

LAE31AA201,
LAE32AA202,

LAE31AA202,
LAE32AA203,

LAE32AA204) 2
.

2.10 LAE31AA260, LAE31AA261, LAE31AA262, LAE31AA263


LAE31AA264, LAE32AA260, LAE32AA261, LAE32AA262, LAE32AA263
LAE32AA264 2 .
2.10.1

LAE31AA263

LAE31AA264,

LAE31AA260,
LAE32AA260,

LAE31AA261,

LAE31AA262,

LAE32AA261,

LAE32AA262,


- .
2.10.2

. .

() LAE31AA260, LAE31AA261,
LAE31AA262,

LAE31AA263,

LAE31AA264

(LAE32AA260,

LAE32AA261,

LAE32AA262, LAE32AA263, LAE32AA264) 2

. .

LAE32AA263 LAE32AA264 2

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

24

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.11 LAE40AA201 3
.
LAE40AA201

.
2.11.1

LAE40AA201


- ()
.
2.11.2

LAE40AA201

,
.
2.11.3

() LAE40AA201 3
,
.

2.12 LAE41AA001 (LAE42AA001) 3


.
3

,
3.
2.12.1

LAE41AA001 (LAE42AA001)
3

() .
2.12.2

()

LAE41AA001

2.13 LAE41AA201 (LAE42AA201) 3


.
2.13.1

. .

LAE41AA201 (LAE42AA201) 3

. .

(LAE42AA001) 3

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

25

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.13.2

LAE41AA201 (LAE42AA201) 3

LAE41AA001 (LAE42AA001).
2.13.3

LAE41AA201 (LAE42AA201) 3
30
LAE41AA001 (LAF42AA001).

2.13.4

() LAE41AA201 (LAE42AA201)
3 .

2.14 LAE41AA260, LAE42AA260 LAE41AA261


3 .
2.14.1

LAE41AA260,

LAE42AA260,LAE41AA261

3
() .
2.14.2

() LAE41AA260, LAE42AA260,
LAE41AA261 3
.

2.15 LAE50AA201 3
.
LAE50AA201

.
2.15.1

LAE50AA201


- ()
.

. .

2.15.2

LAE50AA201

,
.
2.15.3

() LAE50AA201

. .

,
30% .

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

26

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

2.16 LAE51AA201, LAE51AA202, LAE51AA203, LAE51AA204


(LAE52AA201, LAE52AA202, LAE52AA203, LAE52AA204)
3 .
2.16.1

LAE51AA201, LAE51AA202,

LAE51AA203, LAE51AA204

(LAE52AA201, LAE52AA202, LAE52AA203, LAE52AA204) 3



- .
2.16.2

LAE51AA201, LAE51AA202,
LAE51AA204

(LAE52AA201,

LAE52AA202,

LAE52AA203,

LAE51AA203,

LAE52AA204)

3 .
2.16.3

LAE51AA203,

()

LAE51AA204

(LAE52AA201,

LAE51AA201,
LAE52AA202,

LAE51AA202,
LAE52AA203,

LAE52AA204) 3
.

2.17 LAE51AA260, LAE51AA261, LAE51AA262, LAE51AA263


LAE51AA264, LAE52AA260, LAE52AA261, LAE52AA262, LAE52AA263
LAE52AA264 3 .
2.17.1

LAE51AA263

LAE51AA264,

LAE51AA260,
LAE52AA260,

LAE51AA261,

LAE51AA262,

LAE52AA261,

LAE52AA262,

LAE52AA263 LAE52AA264 3

- .
2.17.2

() LAE51AA260, LAE51AA261,
LAE51AA262,

LAE51AA263,

LAE51AA264(LAE52AA260,

LAE52AA261,

LAE52AA262, LAE52AA263, LAE52AA264) 3


. .

. .

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

27

UONG BI 300 MW EXTENSION POWER PLANT


Format: 4

III .
1) PI-
UBEX1-M1&2-M-52-LA-1354-3
2) PI-
3)

UBEX1-M1&2-M-52-LAE-1354-2

PI-
UBEX1-M1&2-M-52-HAH-0001

4)

PI-


5)

UBEX1-M1&2-M-52-LFC-1360

PI-

UBEX1-M1&2-M-52-

. .

. .

LCQ-1359

Document No: UBEX1-M1&2-M-08-LAE-1354

175N9-10UHJ-1354-TD.M.1
1
REV.

5, 6
CHANGES

SHEET

10.09.2005
DOCUM.

DATE

Sheet

28

UONG BI 300 MW EXTENSION POWER PLANT