ROUTINE
TEST
CERTIFICATE
PHYSICAL CHECKS
Customer
Circuit
Project
QA-06-F1
REV. : 2
Dwg. No. :
Remarks
Depth :
Height :
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
DIELECTRIC TEST
Customer
Circuit
Project
QA-06-F2
REV. : 3
Dwg. No. :
A . TEST EQUIPMENT
: 1000 VDC
TEST
POWER CIRCUIT
LEAKAGE
INSULATION
CURRENT (mA) RESISTANCE AFTER
(DURING HV
HV TEST
TEST)
(MEGA - OHM)
REMARKS
( ACB
/ MCCB
STATUS )
R-YBNE
Y-RBNE
B-RYNE
N-RYBE
PANEL TESTED
Remarks
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
PASS
FAIL
SITE
ROUTINE
TEST
CERTIFICATE
COMPONENTS OPERATION
CHECKS
QA-06-F3
REV. : 3
Customer
Circuit
Project
Dwg. No. :
A : PROTECTION RELAY
COMPONENT
MAKE
TYPE
TRIPPING
INDICATION
RESET
O/C
E/F
ELR
B : METERING
COMPONENT
MAKE
OPERATION CHECK
TYPE
MOVEMENT
AMMETER
VOLTMETER
WATTMETER
PF METER
KWH METER
DPM
C : SURGE PROTECTOR
BRAND
Remarks
MODEL NO.
INDICATION
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
Customer
Circuit
Project
QA-06-F4
REV. : 3
Dwg. No. :
A . MCCB DETAILS
MAKE / MODEL NO
SERIAL NO :
RATED CURRENT
CLOSING COIL
: 240 VAC
: 240 VAC
NO
OK
OK
: 5
SEC.
: 5
SEC.
TESTED
Remarks
TESTED
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
ATS CHECKS
Customer
Circuit
Project
QA-06-F5
REV. : 3
Dwg. No. :
A . ATS DETAILS
MAKE / MODEL NO
RATED CURRENT
CLOSING COIL
: 240 VAC
SERIAL NO :
: 240 VAC
: 5
SEC.
: 5
SEC.
Remarks
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
CHANGEOVR ACB
( 2 NOS. ACB ) CHECKS
QA-06-F5 ( A )
REV. : 3
Customer
Circuit
Project
Dwg. No. :
A . ACB DETAILS
MAKE / MODEL NO
RATED CURRENT
CLOSING COIL
: 240 VAC
SERIAL NO :
: 240 VAC
NO
OK
OK
: 5
SEC.
: 5
SEC.
Remarks
Tested By
Witnessed By
Name
Na me
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
CHANGEOVR ACB
( 3 NOS. ACB )CHECKS
QA-06-F5 ( B )
REV. : 3
Customer
Circuit
Project
Dwg. No. :
OK
OK
:5
SEC.
:5
SEC.
:5
SEC.
:5
SEC.
Remarks
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
CHANGEOVER CONTACTOR
CHECKS
QA-06-F6
REV. : 3
Customer
Circuit
Project
Dwg. No. :
A . CONTACTOR DETAILS
MAKE / MODEL NO
RATED CURRENT
COIL VOLTAGE
: 240 VAC
SERIAL NO :
: 5
SEC.
: 5
SEC.
Remarks
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
ELR CHECKS
Customer
Circuit
Project
QA-06-F7
REV. : 3
Dwg. No. :
A . ELR DETAILS
MAKE / MODEL NO
SERIAL NO.
RATED CURRENT
RATED VOLTAGE
SETTING
TIME DELAY
TESTED
TESTED
Remarks
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
Customer
Circuit
Project
QA-06-F8
REV. : 3
Dwg. No. :
MAKE
NO. OF STEP
B . CAPACITOR BANK DETAILS
MAKE
CAPACITANCE
C.T RATIO
TYPE
C / K SETTING
REACTOR
CONTACTOR
:
:
C . TEST RESULTS
NO. OF
STEP :-
MANUAL
IN
OUT
AUTO
IN
OUT
I/L
CONT.
TYPE
MCCB
RATING
1
2
3
4
5
6
7
8
9
10
11
12
EXHAUST FAN FUNCTIONING
Remarks
TESTED :
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
MICROFARAD (F)
RY
YB
BR
SITE
ROUTINE
TEST
CERTIFICATE
Customer
Circuit
Project
Dwg. No. :
A . TIMER SETTING
1 ) START TIMER (ST)
: 5 SEC
: 5 MIN.
: 5 SEC
: 120 SEC.
B . TEST RESULTS
1 ) MANUAL START / STOP BY PRESSING THE START / STOP PUSH BUTTON :
- TESTED
2 ) AUTO START WHEN TNB SUPPLY FAILURE :
- TESTED
3 ) AUTO START WHEN A/O/M/T SWITCH SELECTED TO TEST POSITION :
- TESTED
4 ) GEN-SET AUTO STOP AFTER SDT SETTING TIME ELAPSED WHEN TNB SUPPLY RESTORED :
- TESTED
5 ) GEN-SET FAULT TEST :
A) FAIL TO START
D) OVER SPEED
Remarks
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
Customer
Circuit
Project
QA-06-F10
REV. : 3
Dwg. No. :
A . STARTER DETAILS
1 ) TYPE OF STARTER :
COMPONENT
2 ) MOTOR KW :
MAKE
TYPE
REMARK
LINE CONTACTOR
TRANS / DELTA
CONTACTOR
STAR CONTACTOR
THERMAL OVERLOAD
RELAY
B . TEST AND INSPECTION RESULTS
CHECKED
STRUCTURE FINISHING
OK
OK
OK
OK
DIMENSION(mm) Length :
Remarks
OK
Depth :
Height :
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
Customer
Circuit
Project
QA-06-F11
REV. : 3
Dwg. No. :
A . RELAY DETAILS
MAKE / MODEL NO.
SERIAL NO.
RATED CURRENT
AUX. VOLTAGE
B . TEST RESULT
PHASE
P.S (Is)
T.M.
OPERATING
CURRENT ( A )
2 X Is ( SEC. )
RESET TIME
( SEC. )
R
Y
B
E/F
SETTING CURRENT ( A )
TRIPPING CURRENT ( A )
R
YB
E/F
Remarks
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
TRANDUCER CHECKS
Customer
Circuit
Project
QA-06-F12
REV. : 3
Dwg. No. :
A . TRANSDUCER DETAILS
TRANSDUCER FUNCTION
TRANSDUCER OUTPUT
Remarks
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
Customer
Circuit
Project
ITEM
PUNCH LIST
PANEL NO.
QA-06-F13
REV. : 3
Dwg. No. :
REPAIRED
BY
DEFECTS
10
11
12
13
14
Witnessed By
Name
Date
RETESTED
BY / DATE
SITE
ROUTINE
TEST
CERTIFICATE
Customer
Circuit
Project
QA-06-F14
REV. : 3
Dwg. No. :
A : PHYSICAL CHECK
1 PAINT FINISHING
OK
OK
3 NAME PLATE
OK
OK
5 R, Y, B & N STICKER
OK
6 DIMENSION(mm) Length :
Depth :
Height :
OK
B : METERING
COMPONENT
MAKE
TYPE
OPERATION CHECK
MAKE
TYPE
OPERATION CHECK
AMMETER
VOLTMETER
PF METER
KWH METER
DPM
C : PROTECTION
COMPONENT
O/C
E/F ELR
ELCB
SURGE
Remarks
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date
SITE
ROUTINE
TEST
CERTIFICATE
Customer
Circuit
Project
QA-06-F15
REV. : 3
Dwg. No. :
A : PHYSICAL CHECK
1 PAINT FINISHING
OK
OK
3 NAME PLATE
OK
OK
5 R, Y, B & N STICKER
OK
6 DIMENSION(mm) Length :
Depth :
Height :
OK
B : METERING
COMPONENT
MAKE
TYPE
OPERATION CHECK
MAKE
TYPE
OPERATION CHECK
AMMETER
VOLTMETER
PF METER
KWH METER
DPM
C : PROTECTION
COMPONENT
O/C
E/F ELR
ELCB
SURGE
Remarks
Tested By
Witnessed By
Name
Name
Date
Date
( If Required )
Reviewed By
Name
Date