Sie sind auf Seite 1von 8

CLIENT

CONSULTANT

49/2012-Construction and Execution of Ras Al Khaimah Ring Road

Particle Size Disribution


BS 1377: Part 2 1990 Test 9.2
Material Description:- GRANULAR SUB-BASE
Source:Location:Initial Dry Wt.
(g)

10141.0

SIEVE
(inch")

SIEVE
(mm)

63.0

0.00

0.00

0.00

37.5

1195.90

1195.90

11.79

3/8

10.0

3709.60

4905.50

48.37

No.4

5.0

1401.70

6307.20

62.20

No.30

600um

2951.50

9258.70

91.30

No.200

75um

627.90

9886.60

97.49

Retained Wt. Retained Wt.

Retained

Individual( grms ) Cumulative( grms )

CONTRACTOR
Laboratory Technician

Remarks and Comments

Materials Engineer

Remarks and Comments

Materials Engineer

Remarks and Comments

CONTRACTOR

ah Ring Road

Particle Size Disribution


BS 1377: Part 2 1990 Test 9.2
Sampling Date:- 31/08/2013
Testing Date:-

31/08/2013

Sample No:- 01

Passing

Specification
Limits

From - To

100.0

100

88.2

85-100

51.6

40-85

37.8

25-45

8.7

8-25

2.5

0-10

Remarks and Comments

CONSULTANT
Material Inspector

Remarks and Comments

Materials Engineer

Remarks and Comments

Materials Engineer

CLIENT

CONSULTANT

49/2012-Construction and Execution of Ras Al Khaimah Ring Road

SAND EQUIVALENT TEST


ASTM D 2419
Materials Source:-

Supplier :-

Material Description:- GRANULAR SUB-BASE

Sampling Date:- 31/08/2013

Location:-

Date Tested:-

Test No.

31/08/2013

Clay Floc Height

mm

169.0

Sand Height

mm

109.0

Calculated Sand Equivalent

64.5

Adjusted Sand Equivalent

65

Average Sand Equivalent

66.0

Adjusted Sand Equivalent

66.0

Specification

:- 35min

CONTRACTOR
Laboratory Technician

Remarks and Comments

Materials Engineer

Remarks and Comments

Materials Engineer

Remarks and Comments

CONTRACTOR

mah Ring Road

AND EQUIVALENT TEST


ASTM D 2419
Supplier :Sampling Date:- 31/08/2013

168.0

170.0

110.0

113.0

65.5

66.5

66

67

66.0
66.0

CONSULTANT
Material Inspector

Materials Engineer

Materials Engineer