FLY OVER AT RAJMAHAL SQUARE,BHUBANESWAR- BRIEF

AT A GLANCE
Traffic intensity in Bhubaneswar city is increasing very fast day by day. RajMahal
Square is densely surrounded by important places like Secretariat, Heads of the
Department buildings including Commercial centers at Bapuji Nagar, Janpath, Kalpana,
Market Building, Daily Market at Unit-I. The peak hour flow of traffic is maximum during
8.300A.M to 11.30A.M. & 5.30P.M. to 8.00 P.M.. The vehicle flows are mostly from
neighboring sub-urban areas & coastal villages accumulated through NH-203 & NH-5 &
entering the official & business destination at the city through Kalpana Square, Master
canteen Square, AG Square & Sisubhawan Square crossing RajMahal Square. The
traffic management was very difficult during peak hours. Vehicles are to be detained 2530 minutes to cross the junction in 3 or 4 phase clearance.

Objective :
Considering this traffic hazard, Works Department felt the necessity of development of
the junction at RajMahal Square to provide signal free/barrier free & user friendly
nonstop communication for the vehicular traffic to all legs of the junction. To achieve this
objective, project was envisaged for construction of Fly Over with both side service
roads at RajMahal Square connecting Kalpana Square leg with AG Square leg.
Fly over with service roads was taken up with a cost of Rs.53.27 Crore.
Source of funding : State Government Fund

Technical Specification :
Broad Provisions:
(i) 2 x 3-lane Fly Over from Kalpana Square leg to AG Square leg with 1.50Mtr
Median & both side footpath.
Composition:(a) Middle two spans- 35.00Mtr. each,
(b) Kalpana Leg side- 6 spans 21.50Mtr. each,
AG leg side -7 spans 21.50Mtr. each,

Slabs of fly over- R.C.C Voided Slab for 21.50Mtr. Spans & Prestressed Voided
Slab for central 35.00Mtr. Spans standing over two rows of Y shaped solid piers.
Steel used- Fusion Bonded Epoxy Coated steel
(ii) 3-Lane service roads on both side of Kalpana Square leg & 4-Lane service roads
on both side of AG Square leg
(iii)

Central 40.00Mtr. dia. Rotary at the Junction

Achievement so far:
Physical-Fly over with service roads on both side has been completed.
Financial- Rs.39.52 Crore