C R O N O G R A M A

VALO R I ZAD O D E

AVAN C E

DE OBRA

OBRA :"IMPLEMENTACIN DEL NUEVO CDIGO PROCESAL PENAL, CON SEDE EN EL DISTRITO DE NUEVO CHIMBOTE - DISTRITO JUDICIAL DEL SANTA, ANCASH"
COSTO DIRECTO : 10'429,067.09 NUEVOS SOLES
PLAZO : 300 DIAS CALENDARIOS
ITEM

ACTIVIDAD

No
DIAS

MES 01
DEL 1 AL 16

244969.670

EXPEDIENTE TCNICO

30

EXPEDIENTE TCNICO
B

OBRAS CIVILES
ESTRUCTURAS

01
01.01
01.01.01
01.01.02

TRABAJOS PRELIMINARES
DEMOLICIN CIMIENTOS CERCO METLICO EXISTENTE
DEMOLICIN SOBRECIMIENTOS CERCO METLICO EXISTENTE

4
1

01.01.03

RETIRO CERCO MALLA METLICA

01.01.04

DEMOLICIN CIMIENTOS CERCO MATERIAL NOBLE EXISTENTE

01.01.05

DEMOLICIN SOBRECIMIENTOS CERCO MATERIAL NOBLE EXISTENTE

01.01.06

DEMOLICIN COLUMNAS DE CONCRETO ARMADO

01.01.07

DEMOLICIN VIGAS DE CONCRETO ARMADO

01.01.08

DEMOLICIN MUROS DE MAMPOSTERA

01.01.09

DEMOLICIN CISTERNA DE CONCRETO ARMADO

01.01.10

DEMOLICIN TANQUE DE CONCRETO ARMADO

01.01.11

DEMOLICION DE PISO DE CONCRETO SIMPLE E=15CM

01.01.12

DEMOLICION MURO BAJO.

01.01.13

DEMOLICIN CIMIENTOS MURO BAJO

01.01.14

DEMOLICIN SOBRECIMIENTOS MURO BAJO

01.01.15

DEMOLICIN DE LOSA ALIGERADA E=17 CM

01.01.16

RETIRO DE TIJERALES Y PAREDES DE MADERA C/TRIPLAY (EXISTENTES)

01.01.17

RETIRO DE CERCO DE MALLA ELCTRICA

01.01.18

RETIRO DE ANTENA DE DATOS

01.01.19

ELIMINACIN DE DEMOLICIONES Y RETIRO DE MALLAS METLICAS

01.02

TRABAJOS PROVISIONALES

01.02.01

TRAZO, NIVELES Y REPLANTEO

01.02.02

CERCO PERIMETRICO PROVICIONAL

01.02.03

LIMPIEZA PERMANENTE DE OBRA

01.02.04

CARTEL DE OBRA 3.60 X 7.20 m

01.02.05

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

01.02.06

INSTALACION DE ENERCIA ELECTRICA

01.02.07

CASETA DE GUARDIANA

01.02.08

AGUA PARA LA CONSTRUCCIN (CURADO + HUMEDECIMIENTO DEL TERRENO)

01.02.09

SERVICIO BAO PORTTIL

01.02.10

TRASLADO VERTICAL DE MATERIALES.

01.03

8
3
36

MOVIMIENTO DE TIERRAS

01.03.01

EXCAVACION MASIVA CON MAQUINA

45

01.03.02

EXCAVACIONES SIMPLES

30

01.03.03

RELLENO COMPACTADO CON MATERIAL PROPIO

01.03.04

RELLENO DE AFIRMADO e= 0.20 m

28

01.03.05

NIVELACION INTERIOR Y APISONADO

32

01.03.06

ELIMINACIN DE MATERIAL EXCEDENTE CARG. 125HP VOLQUETE 10 m3

41

01.03.07

ACARREO DE MATERIAL INTERNO

30

01.04

OBRAS DE CONCRETO SIMPLE

01.04.01

CONCRETO CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA

01.04.02

CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M.

01.04.03

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO H= 20 CM

01.04.04

SOLADO E=10CM

10

FALSO PISO E=4"

17

01.04.05
01.05
01.05.01

OBRAS DE CONCRETO ARMADO


CAJA DE ASCENSOR

01.05.01.01

CONCRETO f'c=210 kg/cm2 ASCENSOR

10

01.05.01.02

ACERO DE REFUERZO fy=4200 kg/cm2 ASCENSOR

10

01.05.01.03

ENCOFRADO Y DESENCOFRADO ASCENSOR

10

01.05.02

CMARA DE BOMBEO Y CAJA DE REUNION PARA DESCARGA

01.05.02.01

CONCRETO f'c=210 kg/cm2 CAM.BOMBEO

01.05.02.02

ACERO DE REFUERZO fy=4200 kg/cm2 CAM.BOMBEO

01.05.02.03

ENCOFRADO Y DESENCOFRADO CAM.BOMBEO

01.05.03

COLUMNETAS

01.05.03.01

CONCRETO f'c=175kg/cm2 COLUMNETAS

01.05.03.02

ACERO DE REFUERZO fy=4200 kg/cm2 COLUMNETAS

01.05.03.03

ENCOFRADO Y DESENCOFRADO COLUMNETAS

01.05.04

ZAPATAS

6
4
10

DEL 1 6

C R O N O G R A M A

VALO R I ZAD O D E

AVAN C E

DE OBRA

OBRA :"IMPLEMENTACIN DEL NUEVO CDIGO PROCESAL PENAL, CON SEDE EN EL DISTRITO DE NUEVO CHIMBOTE - DISTRITO JUDICIAL DEL SANTA, ANCASH"
COSTO DIRECTO : 10'429,067.09 NUEVOS SOLES
PLAZO : 300 DIAS CALENDARIOS
ITEM
01.05.04.01
01.05.04.02
01.05.05

ACTIVIDAD
CONCRETO f'c=210 kg/cm2 ZAPATAS

37

ACERO DE REFUERZO fy=4200kg/cm2 ZAPATA

39

VIGUETAS

01.05.05.01

CONCRETO f'c=175 kg/cm2 VIGUETAS

01.05.05.02

ACERO DE REFUERZO fy=4200 kg/cm2 VIGUETAS

01.05.05.03

ENCOFRADO Y DESENCOFRADO VIGUETAS

01.05.06

No
DIAS

6
4
10

VIGA DE CIMENTACION

01.05.06.01

CONCRETO f'c=210kg/cm2 VIGA DE CIMENTACION

11

01.05.06.02

ACERO DE REFUERZO fy=4200kg/cm2 VIGA DE CIMENTACION

15

01.05.06.03

ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION

10

01.05.07

COLUMNAS

01.05.07.01

CONCRETO f'c=210kg/cm2 COLUMNAS

17

01.05.07.02

ACERO DE REFUERZO fy=4200kg/cm2 COLUMNAS

30

01.05.07.03

ENCOFRADO Y DESENCOFRADO COLUMNAS

30

01.05.08

VIGAS

01.05.08.01

CONCRETO f'c=210kg/cm2 VIGAS

15

01.05.08.02

ACERO DE REFUERZO fy=4200kg/cm2 VIGAS

25

01.05.08.03

ENCOFRADO Y DESENCOFRADO VIGAS

35

01.05.09

LOSA ALIGERADA

01.05.09.01

CONCRETO f'c=210kg/cm2 LOSA ALIGERADA

45

01.05.09.02

ACERO DE REFUERZO fy=4200kg/cm2 LOSA ALIGERADA

22

01.05.09.03

CASETN 0.15x0.40x0.4 EN LOSAS ALIGERADAS

13

01.05.09.04

ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA

45

01.05.10

ESCALERA

01.05.10.01

CONCRETO f'c=210kg/cm2 ESCALERA

01.05.10.02

ACERO DE REFUERZO fy=4200kg/cm2 ESCALERA

10

ENCOFRADO Y DESENCOFRADO ESCALERA

15

01.05.10.03
01.05.11

CISTERNA

01.05.11.01

CONCRETO f'c=210kg/cm2 CISTERNA

01.05.11.02

ACERO DE REFUERZO fy=4200kg/cm2 CISTERNA

01.05.11.03

ENCOFRADO Y DESENCOFRADO CISTERNA

01.05.12

TANQUE ELEVADO

01.05.12.01

CONCRETO f'c=210kg/cm2 TANQUE ELEVADO

01.05.12.02

ACERO DE REFUERZO fy=4200kg/cm2 TANQUE ELEVADO

01.05.12.03

ENCOFRADO Y DESENCOFRADO TANQUE ELEVADO

01.05.13

MURO DE SOTANO

01.05.13.01

CONCRETO f'c=210kg/cm2 MURO SOTANO

30

01.05.13.02

ACERO DE REFUERZO fy=4200kg/cm2 MURO DE STANO

30

01.05.13.03

ENCOFRADO Y DESENCOFRADO DE MURO DE SOTANO

18

01.05.14

GRADAS

01.05.14.01

CONCRETO f'c=175kg/cm2 GRADAS

01.05.14.02

ACERO DE REFUERZO fy=4200 kg/cm2 GRADAS

01.05.14.03

ENCOFRADO Y DESENCOFRADO GRADAS

01.05.15

RAMPA

01.05.15.01

CONCRETO f'c=210kg/cm2 RAMPA

01.05.15.02

ACERO DE REFUERZO fy=4200 kg/cm2 RAMPA

01.06

CONTROL DE CALIDAD

01.07

RECONSTRUCCIN DE CERCO PERIMTRICO

01.08

RECONSTRUCCIN DE VEREDAS PERIMETRALES

01.02

3
182
21
9

ARQUITECTURA

01
01.01

MUROS Y TABIQUES DE ALBAILERIA


REVOQUES ENLUCIDOS Y MOLDURAS

40
60

01.03

CIELORASOS

60

01.04

PISOS Y CONTRAPISOS

30

01.05

CONTRAZOCALOS DE PORCELANATO

15

01.06

ZOCALOS DE CERMICO

10

01.07

CUBIERTAS

15

01.08

REVESTIMIENTOS DE PORCELANATO Y CERMICA

20

01.09

CARPINTERIA DE MADERA

40

01.10

CARPINTERIA METALICA

30

01.11

BISAGRAS Y CERRADURAS

01.12

VIDRIOS Y CRISTALES

21

01.13

PINTURA

45

MES 01
DEL 1 AL 16

DEL 1 6

C R O N O G R A M A

VALO R I ZAD O D E

AVAN C E

DE OBRA

OBRA :"IMPLEMENTACIN DEL NUEVO CDIGO PROCESAL PENAL, CON SEDE EN EL DISTRITO DE NUEVO CHIMBOTE - DISTRITO JUDICIAL DEL SANTA, ANCASH"
COSTO DIRECTO : 10'429,067.09 NUEVOS SOLES
PLAZO : 300 DIAS CALENDARIOS
ITEM

ACTIVIDAD

No
DIAS

01.14

JUNTA DE DILATACIN CON TEKNOPORT

01.15

PREPARACIN TIERRA + SEMBRO DE GRASS

01.16

INSTALACIN DE ASCENSOR

01.17

MOBILIARIO

01.18

EQUIPOS COMPLEMENTARIOS

3
240

01.01

DESAGUE Y VENTILACIN

12

01.02

REDES COLECTORAS

30

01.03

ACCESORIOS DE REDES

01.04

ADITAMENTOS DE REDES

12

CMARAS DE INSPECCIN

02

SISTEMA DE AGUA FRIA

2.01

SALIDA DE AGUA FRIA 1/2"

20

2.02

SALIDA DE AGUA FRIA 3/4"

2.03

SALIDA DE AGUA FRIA 1 1/2"

2.04

REDES DE DISTRIBUCION

2.05

ACCESORIO DE REDES

2.06

LLAVES Y VLVULAS

2.07

PIEZAS VARIAS

2.08

SISTEMA DE AGUA CONTRAINCENDIO

30

2.09

EQUIPAMIENTO

10

2.10

PRUEBAS HIDRAULICAS

15

2.11

APARATOS Y ACCESORIOS SANITARIOS

45

2.12
2.13
01

DRENAJE PLUVIAL - ALCANTARILLAS

VARIOS

INSTALACIN DE ESTRUCTURA DE CABLEADO ESTRUCTURADO

01.01

SALIDAS DE DATA Y TELFONO

01.02

SALIDA PARA FIBRA PTICA PARA C/PISO Y C/DP

01.03

INSTALACIN DE BANDEJAS METLICAS

01.04

INSTALACIN DE CABLES DE RED UTP CAT6 Y FIBRA PTICA MULTIMODO 50/12

01.05

ARMARIO PRINCIPAL A-1 PISO

01.06

ARMARIO B-1 PISO

01.07

ARMARIO C-1 PISO

01.08

ARMARIO D-2 PISO

01.09

ARMARIO E-2 PISO

01.10

ARMARIO F-STANO

01.11

CAPACITACIN

01.12

EQUIPAMIENTO INFORMTICO

75

INSTALACION DE CIRCUITO DE TV

75

01.13

DEL 1 6

INSTALACIONES SANITARIAS

01

01.05

MES 01
DEL 1 AL 16

10
4
4
15

01.14

INSTALACION DE AUDIO

75

01.15

INSTALACION DE VIDEO SEGURIDAD

75

INSTALACIONES ELECTRICAS

01
02

ZOTANO

45

03

PRIMER PISO

45

04

SEGUNDO PISO

45

05

AZOTEA

45

06

VARIOS

06.01

REDES PRIMARIAS CON TRAFOMIX MT 13200/220 V

60

06.02

SUBESTACION EN CASETA MT 13200/220 V, 250KW

60

06.03

SISTEMA DE AIRE ACONDICIONADO

06.04

MONTACARGA

06.05

PRUEBAS ELECTRICAS

30

06.06

PUESTA A TIERRA

20

06.07

LUZ DE EMENGENCIA

20

COSTO DIRECTO TOTAL


GASTOS GENERALES
(10%)
UTILIDAD
(10 %)
SUB - TOTAL
IGV
(18 %)
COSTO TOTAL
MONTO TOTAL DE INVERSIONES
DESEMBOLSO PARCIAL
AVANCE PARCIAL DE LA OBRA

75
120

(S/.)
(S/.)
(%)

244969.67
244969.67
24496.97
24496.97
293963.61
52913.45
346877.06
346877.06
346877.06
2.35%

C R O N O G R A M A

VALO R I ZAD O D E

AVAN C E

DE OBRA

OBRA :"IMPLEMENTACIN DEL NUEVO CDIGO PROCESAL PENAL, CON SEDE EN EL DISTRITO DE NUEVO CHIMBOTE - DISTRITO JUDICIAL DEL SANTA, ANCASH"
COSTO DIRECTO : 10'429,067.09 NUEVOS SOLES
PLAZO : 300 DIAS CALENDARIOS
ITEM
AVANCE ACUMULADO DE LA OBRA

ACTIVIDAD

No
DIAS
(%)

MES 01
DEL 1 AL 16

DEL 1 6

2.35%

RA

MES 01

MES 02
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 AL 30

1700.01
4.00
223.12
1.00
2999.98
1.00
2613.22
5.00
342.88
1.00
275.45
1.00
230.82
1.00
766.86
1.00
3000.00
1.00
4000.00
1.00
2648.31
4.00
42.45
1.00
156.92
1.00
20.60
1.00
2461.87
4.00
2500.00
1.00
2000.00
1.00
2500.00
1.00
5378.55
5.00

3115.67
8.00
2001.37
3.00
3136.86
18.00
1270.69
1.00
21000.00
1.00
6000.00
1.00
5000.00
1.00
12000.00
1.00
1070.79
1.00
25000.00
1.00

17627.49
7.00

6151.97
1.00

RA

MES 01

MES 02
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 AL 30

81.28
2.00

RA

MES 01

MES 02
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 AL 30

1386.52
2.00

10437.50
15.00

244969.67
244969.67
24496.97
24496.97
293963.61
52913.45
346877.06
346877.06
346877.06
2.35%

149141.18
149141.18
14914.12
14914.12
178969.42
32214.50
211183.92
211183.92
211183.92
1.43%

RA

MES 01

MES 02
DEL 1 6 AL 30

2.35%

DEL 1 AL 16

DEL 1 6 AL 30

3.78%

MES 03

MES 04

DEL 1 AL 16

DEL 1 6 AL 30

DEL 1 AL 16

3136.86
18.00

75546.39

20145.70

30.00

8.00
20368.26

23278.02

14.00

16.00

184559.00
30.00

61519.67
10.00
1800.42

4951.15

8.00

22.00

25826.00
10.00

MES 03
DEL 1 AL 16

MES 04
DEL 1 6 AL 30

DEL 1 AL 16

34350.03
14.00

61339.35
25.00

36331.03
15.00

102927.95
30.00

609.59
15.00

1219.19
30.00

MES 03

MES 04

DEL 1 AL 16

DEL 1 6 AL 30

DEL 1 AL 16

20875.00
30.00

20875.00
30.00

3056.91
3.00

6087.29
6.00
310.11
1.00
1266.90

2202.72
4.00

2.00
91.10

1.00

1576.81
2.00

2.00
2512.08
6.00

2202.72
4.00
29.82
1.00
42.56
1.00
3266.05

1000.73
1.00

10521.00
1.00

17022.24
10.00

11250.00
15.00
44500.00
15.00
60500.00
15.00

378710.17
378710.17
37871.02
37871.02
454452.21
81801.40
536253.61
536253.61
536253.61
3.63%

879084.21
879084.21
87908.42
87908.42
1054901.05
189882.19
1244783.24
1244783.24
1244783.24
8.43%

MES 03
DEL 1 AL 16

MES 04
DEL 1 6 AL 30

7.41%

DEL 1 AL 16

15.84%

DEL 1 AL 16

MES 04

MES 05
DEL 1 6 AL 30

DEL 1 AL 16

13031.27
8.00

19736.08
10.00
34123.35
10.00
14721.60
10.00

594.62
1.00
2158.12
3.00
707.12
2.00

DEL 1 6 AL 30

MES 04

MES 05

DEL 1 AL 16

DEL 1 6 AL 30

DEL 1 AL 16

121063.30
20.00

DEL 1 6 AL 30

102903.80
17.00

26340.48
11.00

16068.25
10.00

71097.22
17.00
111074.86
30.00
70112.26
30.00

183426.94
25.00
61457.97
11.00

7718.00
3.00
6093.73
4.00
5043.78
4.00

48982.91

48982.91

15.00

15.00

19800.30
18.00

1219.19
30.00
8801.98
14.00

4400.99
7.00

MES 04

MES 05

DEL 1 AL 16

DEL 1 6 AL 30

DEL 1 AL 16

1386.52
2.00

DEL 1 6 AL 30

20875.00
30.00

3056.91
3.00

6087.29
6.00

310.11
1.00
1266.90

2.00

2202.72
4.00

29.82
1.00

6087.29
6.00

1.00
91.10

1.00

1576.81
2.00

13125.75
15.00

21506.10
15.00

42.56
1.00
1633.03

173638.83
15.00
16358.79
15.00

25533.36

25533.36

15.00

15.00

11250.00
=

15.00
44500.00
15.00

60500.00
15.00
12500.00
30.00

879084.21
879084.21
87908.42
87908.42
1054901.05
189882.19
1244783.24
1244783.24
1244783.24
8.43%

1104156.28
1104156.28
110415.63
110415.63
1324987.54
238497.76
1563485.30
1563485.30
1563485.30
10.59%

MES 04

DEL 1 AL 16

MES 05
DEL 1 6 AL 30

15.84%

DEL 1 AL 16

DEL 1 6 AL 30

26.43%

MES 06
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 AL 30

1853.37
12.00

8252.70
2.00
1047.91
2.00
940.83
4.00

DEL 1 AL 16

MES 06
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 AL 30

DEL 1 AL 16

129914.79
15.00

134090.11
24.00

59102.32
15.00
271383.07
22.00

135432.48
28.00

1219.19
30.00

29627.66
4.00

118510.65
16.00

MES 06
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 AL 30

DEL 1 AL 16

3056.91
3.00

1386.52
2.00

20875.00
30.00

6087.29
6.00

310.11
1.00
1266.90

310.11
1.00
1266.90

2.00

2.00

2202.72
4.00

29.82
1.00

29.82
1.00

42.56
1.00
1633.03

42.56
1.00
1633.03

1.00
91.10

1.00
91.10

1.00

1.00

34762.14
10.00

1576.81
2.00

1576.81
2.00

1000.73
1.00

1000.73
1.00

10521.00
1.00

10521.00
1.00

15.00
16358.79
15.00

63926.13
1.00
173638.83

173638.83

15.00
16358.79
15.00

13125.75
15.00

13125.75
15.00

21506.10
15.00

21506.10
15.00

8511.12
=

5.00

53396.88
20.00

=
70559.20
20.00

11250.00
=

15.00
44500.00
15.00

60500.00
15.00

11250.00

12500.00
30.00

1425803.65
1425803.65
142580.36
142580.36
1710964.37
307973.59
2018937.96
2018937.96
2018937.96
13.67%

15.00
44500.00
15.00

60500.00
15.00

MES 06
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 AL 30

40.10%

DEL 1 AL 16

MES 07
DEL 1 AL 16

MES 08
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 A

45583.63
28.00
3088.94
20.00

38644.96
14.00

8281.06
3.00

6608.97
6.00
11771.09
4.00
13858.21
10.00

MES 07

MES 08

DEL 1 AL 16

DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 A

11689.21
4.00

118204.63
30.00

334163.42
13.00
82226.86
17.00

35953.34
6.00
14270.78
10.00
25846.78
15.00

2505.76
1.00
3399.59
3.00
2234.74
4.00

2084.61
1.00
2299.35
3.00
258.26
2.00

2105.51
1.00
28534.22
3.00
1219.19
30.00

1219.19
30.00

148138.32
20.00

=
187187.87
30.00

187187.87
30.00
167216.76
15.00

334433.51
30.00

286964.67
30.00
7374.83

33322.02
15.00

2.00

MES 07

MES 08

DEL 1 AL 16

DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 A

20875.00
30.00

20875.00
30.00

3056.91
3.00

6087.29
6.00

310.11
1.00
1266.90

2.00

2202.72
4.00

1.00
91.10

1.00

29.82
1.00
42.56
1.00
1633.03

4534.85
2.00
162.40
1.00

4534.85
2.00

69524.29
20.00

36461.04
10.00

16235.25
15.00

32470.51
30.00

1576.81
2.00

1000.73
1.00

10521.00
1.00

36502.00
15.00
17493.20
2.00
21693.20
2.00
11993.20
2.00
11909.81
2.00
12193.20
2.00
10509.81
2.00
63926.13
1.00
173638.83
=

15.00
16358.79
15.00

13125.75
15.00

21506.10
15.00

66746.10
25.00
88199.01
=

25.00
7166.31
20.00

=
12500.00
30.00

2113848.43
2113848.43
211384.84
211384.84
2536618.11
456591.26
2993209.37
2993209.37
2993209.37
20.27%

60500.00
15.00
12500.00
30.00

1449003.85
1449003.85
144900.38
144900.38
1738804.61
312984.83
2051789.44
2051789.44
2051789.44
13.89%

MES 07
DEL 1 AL 16

MES 08
DEL 1 6 AL 30

60.37%

DEL 1 AL 16

DEL 1 6 A

74.26%

MES 08

MES 09
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 AL 30

MES 08

MES 09
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 AL 30

4740.99
6.00

7331.54
10.00

609.59
15.00

19401.84
9.00

167216.76
15.00
511688.30
30.00
43796.21
10.00
20169.14
4.00
7174.30
10.00

3587.15
5.00

85832.83
14.00
61118.95
4.00

36785.50
6.00

458392.11
30.00

91678.42
6.00

7374.83
=

33322.02
15.00

2.00

7374.83
=

2.00

MES 08

MES 09
DEL 1 6 AL 30

DEL 1 AL 16

DEL 1 6 AL 30

833.37
3.00
20875.00
30.00

1266.90
=

2.00

4534.85
2.00

11156.30
15.00

1586.81
5.00
8716.22
2.00

173638.83
=

15.00
16358.79
15.00

13125.75
15.00

21506.10
15.00

8957.89
25.00

3800.00
15.00

=
10000.00
10.00

4967.76
10.00

1449003.85
1449003.85
144900.38
144900.38
1738804.61
312984.83
2051789.44
2051789.44
2051789.44
13.89%

=
10000.00
10.00
4967.76

1639421.33
1639421.33
163942.13
163942.13
1967305.59
354115.01
2321420.60
2321420.60
2321420.60
15.72%

10.00

MES 08

MES 09
DEL 1 6 AL 30

74.26%

DEL 1 AL 16

DEL 1 6 AL 30

89.98%

MES 10
DEL 1 AL 16

DEL 1 6 AL 30

TOTAL
(S/.)
244969.67

1700.01
223.12
2999.98
2613.22
342.88
275.45
230.82
766.86
3000.00
4000.00
2648.31
42.45
156.92
20.60
2461.87
2500.00
2000.00
2500.00
5378.55

3115.67
2001.37
6273.72
1270.69
21000.00
6000.00
5000.00
12000.00
1070.79
25000.00

113319.59
43646.28
13031.27
45583.63
4942.31
252230.64
6751.57

8252.70
1047.91
940.83
25826.00
46926.02

19736.08
34123.35
14721.60

594.62
2158.12
707.12

6608.97
11771.09
13858.21

MES 10
DEL 1 AL 16

DEL 1 6 AL 30

TOTAL
(S/.)
223967.10
95689.38

4740.99
11689.21
7331.54

26340.48
36331.03
16068.25

71097.22
111074.86
70112.26

129914.79
183426.94
195548.08

177306.95
271383.07
334163.42
217659.34

35953.34
14270.78
25846.78

7718.00
6093.73
5043.78

2505.76
3399.59
2234.74

97965.82
102927.95
19800.30

2084.61
2299.35
258.26

2105.51
28534.22
7396.40
13202.97
19401.84

296276.63
374375.74
668867.02
511688.30
21898.11

65694.32

5.00
30253.71
6.00

50422.85
10761.45
122618.33
611189.48
286964.67
22124.49
250318.55
21.00
33322.02
15.00

250318.55
99966.06

MES 10
DEL 1 AL 16

TOTAL
(S/.)

DEL 1 6 AL 30

4159.56
833.37
10437.50
15.00

167000.00
225810.00

225810.00

1.00
55197.00

1.00
55197.00

451620.00

1.00

1.00

110394.00

12227.65
30436.45
1550.55
7601.41
2512.08

11013.60
149.10
212.80
9798.15
455.50
13604.55
162.40
104286.43
36461.04
11156.30
48705.76
1586.81
8716.22

7884.06
4002.90
42084.00
36502.00
17493.20
21693.20
11993.20
11909.81
12193.20
10509.81
127852.26
868194.14
81793.94
65628.75
107530.50

76600.09
120142.98
158758.21
16124.20

45000.00
178000.00
302500.00
50000.00
3800.00

7600.00

15.00

20000.00
9935.52

1044928.33
1044928.33
104492.83
104492.83
1253913.99
225704.52
1479618.51
1479618.51
1479618.51
10.02%

10429067.09
10429067.09
1042906.70
1042906.70
12514880.49
2252678.51
14767559.00
14767559.00
14767559.00
100.00%

MES 10
DEL 1 AL 16

DEL 1 6 AL 30

100.00%

TOTAL
(S/.)

C R O N O G R A M A

D E

D E S E M B O L S O S

P A R C I A L E S

OBRA : "IMPLEMENTACIN DEL NUEVO CDIGO PROCESAL PENAL, CON SEDE EN EL DISTRITO DE NUEVO CHIMBOTE - DISTRITO JUDICIAL DEL SANTA, ANCASH"
PROPIETARIO

GOBIERNO REGIONAL DE ANCASH SUB REGION PACIFICO

COSTO DIRECTO : 10'429,067.09 NUEVOS SOLES


PLAZO : 300 DIAS CALENDARIOS
MES 01
ITEM

ACTIVIDAD

MES 02

MES 03

MES 04

MES 05

MES 06

MES 07

MES 08

MES 09

MES 10

TOTAL

DIAS

001 ESPEDIENTE TCNICO

(S/.)
244,969.67

001 ESTRUCTURAS

137,317.16

320,370.57

002 ARQUITECTURA

11,824.02

702,701.40

634,497.68

743,236.76

699,202.53

116,251.61

12,682.12

244,969.67

3,366,259.83

20,875.00

20,875.00

51,889.18

140,772.17

810,382.61

644,312.18

1,363,216.33

1,041,128.33

4,105,274.82

003 INSTALACIONES ELCTRICAS

17,022.24

141,783.36

154,283.36

190,658.00

266,055.30

172,165.32

38,893.41

3,800.00

984,661.00

004 INSTALACIONES SANITARIAS

18,865.54

2,202.72

24,181.25

49,482.58

100,479.98

105,424.73

005 INST. DEL CABLEADO ESTRUCTURADO

COSTO DIRECTO

244,969.67

GASTOS GENERALES (10%)

24,496.97

UTILIDAD 10%
SUB - TOTAL
IGV 18%
COSTO TOTAL
DESEMBOLSO PARCIAL

(S/.)

DESEMBOLSO ACUMULADO PROGRAMADO

(S/.)

149,141.18
14,914.12

1,576.81

11,521.73

239,304.82

301,654.13

237,728.00

410,850.02

224,629.47

378,710.17

879,084.21

1,104,156.28

1,425,803.65

2,113,848.43

1,449,003.85

1,639,421.33

37,871.02

87,908.42

110,415.63

142,580.36

211,384.84

144,900.38

163,942.13

1,044,928.33
104,492.83

300,636.80
1,427,264.97

10,429,067.09
1,042,906.70

24,496.97

14,914.12

37,871.02

87,908.42

110,415.63

142,580.36

211,384.84

144,900.38

163,942.13

104,492.83

1,042,906.70

293,963.60

178,969.41

454,452.20

1,054,901.05

1,324,987.54

1,710,964.38

2,536,618.12

1,738,804.62

1,967,305.59

1,253,913.99

12,514,880.49

52,913.45

32,214.49

81,801.40

189,882.19

238,497.76

307,973.59

456,591.26

312,984.83

354,115.01

225,704.52

2,252,678.51

346,877.05

211,183.91

536,253.60

1,244,783.24

1,563,485.30

2,018,937.97

2,993,209.38

2,051,789.45

2,321,420.60

1,479,618.51

14,767,559.00

346,877.05

211,183.91

536,253.60

1,244,783.24

1,563,485.30

2,018,937.97

2,993,209.38

2,051,789.45

2,321,420.60

1,479,618.51

346,877.05

211,183.91

536,253.60

1,244,783.24

1,563,485.30

2,018,937.97

2,993,209.38

2,051,789.45

2,321,420.60

1,479,618.51

AVANCE PARCIAL DE LA OBRA

(%)

2.35%

1.43%

3.63%

8.43%

10.59%

13.67%

20.27%

13.89%

15.72%

10.02%

AVANCE ACUMULADO DE LA OBRA

(%)

2.35%

3.78%

7.41%

15.84%

26.43%

40.10%

60.37%

74.26%

89.98%

100.00%

100.00%