Item (s)
Description
1.0
R.C Foundation
Excavation of Foundation pit to required depth and width and removal
of spoils.
2.0
Cut and fixed form work to foundation side inclusive of all supports.
3.0
4.0
5.0
6.0
Sand filling and compacting of foundation base with 3 inch white sand.
Placing of cement/sand blinding for R.C Foundation base.
Fixing of Re-bars for foundation.
Pouring of Concrete for foundation base.
R.C Column
Cut and fixed form work for column box inclusive of all supports.
Fixing of Re-bars for R.C Columns.
Pouring of Concrete for R.C Columns.
Hollow block wall
Laying of 4" thk. Hollow block wall in cement sand water.
Rendering of Hollow block wall (both faces) with " thk. Plaster.
Backfilling
Backfilling of clay (or any suitable material) to R.C foundation base to
the required elevation.
7.0
8.0
9.0
1.1
1.2
1.3
Unit
Qty.
Rate
Amount ($)
cu.ft.
b.m
cu. ft.
sq. ft.
lb.
cu. yd.
b.m
lb.
cu. Yd.
sq. yd.
sq. yd.
sum
Total labour cost ($)
Material List
Item (s)
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
Description
O.P Cement
Stone
White Sand
" steel rod
" steel rod
Blinding wire
Formboard
4" thk. Hollow block
Unit
sk.
tons.
tr. Load
lg.
lg.
lb.
b.m
ea.
Qty.
26
2.5
2
24
10
2
90
90
Rate
Amount ($)
3/23/2015