7 No. of generators.
Outside Air temperature is 46 C.
Accepted inside Air temperature is 55 C (attachment #1).
The heat dissipated for each genset is 228 KW (attachment #2).
Total volume of the room is 9600 m3 = 339000 ft3.
Required Air for Combustion is 8714 cfm for each genset (attachment
#3).
Ventilation Calculation
Heat to be removed
Heat to be removed
= 228 KW x 7 No.
= 1596 KW
= 5450000 BTUH.
= 55 C 46 C
= 9 C
= 16 F
CFM
545000
1.08 x 16
= 315000 cfm
315000
7
cfm
= 45000 cfm
1) Air Change per hour as per generators heat dissipation
ACH
CFM x 60
Volume
ACH
315000 x 60
339000
= 56 ACH
cfm
= 0.75 + 0.5 + 1
= 2.25 x 1.1
= 2.5 inches w.g.
B. Exhaust Fan
Required flow rate is 32000 cfm
1. Duct losses
= 0.5 inches w.g.
2) Using 60 ACH
Supply flow rate
CFM x 60
Volume
ACH
CFM
= 339000 cfm
cfm
E.S.P in
Flow Rate
(w.g) @ 60 ACH (cfm)
E.S.P in
Flow Rate Quantity
(w.g) @ 56 ACH (cfm)
No.
Fans
2.5
485000
2.5
45000
Supply Fan
35000
32000
7 Exhaust Fan