Mine Plan and Mine Schedule Flow Chart

MINE PLAN ADARO - ENGINEERING WORKSHOP 2002

MINESCAPE
(OPTIONAL)
-Model : grid & table file
-Topo : grid file
-Schema, Sheet, grid spec

GEOLOGICAL MODEL
Roof & Floor Structure Contour
Topographical Data
Slope Stability Data (HW, LW, etc)
Borehole
Relative Density (averages, default)
Coal Quality (optional)

MINE PLAN
Longterm & Shortterm Planned
Boundary, Coal, Waste Target, SR
Geo-technical Data (Slope stability)
Spoil Dump (Volume, Top Soil Balance)
Infrastructures : Ramp, S.Pond, Pump, etc.
Material : RD, Swelling Factor

RESERVES
Waste (per Bench)
-High wall Area
-Low wall Area
-Pit Area (IB, OB, UB)

Monitoring/
Updating

Monitoring/
Updating

Coal Insitu (per Bench, per Seam)


Coal Recovery (per Bench, per Seam)
Stripping Ratio
Top Soil Removal

Monitoring/
Updating

EQUIPMENT
PRODUCTIVITY

MINE SCHEDULE
Yearly, Monthly, Weekly
-Stripping Volume & Area
-Mining Volume & Area
-Waste Dump Volume Area
-Top Soil Volume & Area
-ROM Pit Stockpile
-Infrastructure
-Hauling Distance to ROM/
Spoil Dump

Sequence
Pit /Location
Shell Name
Bench, Strip, Level
Stripping Volume
Mining Volume
Stripping Ratio
Equip Required

Material (Coal, Waste, Tsoil


-Density, Swell factor, etc.

MINE STAR
EXPAC
Spreadsheet

Monitoring/
Updating

Route
Roaster
-Rainfall & Slippery
-Effective W. Hours

Equipment Specification
Equipment
Allocation
Waste, Coal,
Tsoil Removal
Pit Service, etc.

-Capacity
-Availability
-Dimension
-Reimpull, etc.

Monitoring/
Updating

PT PAMAPERSADA NUSANTARA

PAMA

Halaman 1 dari 9

MINE PLAN ADARO - ENGINEERING WORKSHOP 2002

Conceptual of Mine Sequence (X-Section)

Tingkatan warna menggambarkan Plan Sequence Bulanan


Tahapan penambangan (sequence) dimulai dari no. 1, 2, 3, dst dengan metoda
bench level per 12 m
Setiap no sequence mempunyai nama shell, dengan pola penamaan sebagai berikut
PN1HW036B120S09
Dimensi Shell 100 x 200 x 12 m, tergantung kemampuan unit (digging, grade, loading area
PT PAMAPERSADA NUSANTARA

PAMA

Halaman 2 dari 9

MINE PLAN ADARO - ENGINEERING WORKSHOP 2002

Overall
grade 8%

Conceptual of Mine Sequence (Long Section)

Sump Area
Progress

Arah sequence dimulai dari sidewall menuju ke endwall, kemudian secara bertahap sisi
endwall akan didalamkan lebih dulu agar seluruh darinase dapat diarahkan ke posisi sump.
Konsep pemotongan dan pola sequence dilakukan dengan mempertimbangkan ramp design
overall grade 8%, pada setiap jarak 200 m baru dilakukan penekanan level sedalam 12 m.

PT PAMAPERSADA NUSANTARA

PAMA

Halaman 3 dari 9

Monthly Schedule (exmp)

MINE PLAN ADARO - ENGINEERING WORKSHOP 2002

MONTH
PIT

PN1

PN2

PN3

January
SEQ

SHELL NAME

2008
LWB084S09
2009
LWB084S10
2010
LWB084S11
2011
LWB084S12
2015
LWB072S09
2016
LWB072S10
2021
HW036B060S11
2026
HW036B048S09
2027
HW036B048S10
2028
HW036B048S11
PN1 Total
2012
HW036B084S17
2017
HW036B072S15
2018
HW036B072S16
2022
HW036B060S14
2023
HW036B060S15
2029
HW036B048S13
2030
HW036B036S13
PN2 Total
2013
HW036B084S05
2014
HW036B084S06
2019
HW036B072S07
2020
HW036B072S08
2024
HW036B060S08
2025
HW036B060S09
PN3 Total

OB STRIP
104,660
101,670
161,550
25,310
113,490
143,320
59,530
116,040
101,100
20,560
947,230
46,440
151,310
69,360
237,210
232,610
205,020
121,290
1,063,240
135,070
90,780
100,950
110,060
29,890
91,360
558,110

COAL

SRATIO

LOCATION

OB STRIP

PN1 Total
PN2 Total
PN3 Total
TOTAL

210,590
202,760
34,910
448,260
45,780

0.55
0.50
0.59
2.11
1.01

1,560
115,990
24,380
237,020
239,940
664,670
11,960
21,690
124,220
146,370
171,560
208,110
683,910

44.46
2.05
9.54
0.86
0.51
1.60
11.29
4.19
0.81
0.75
0.17
0.44
0.82

COAL

947,230
1,063,240
558,110
2,568,580

SRATIO

448,260
664,670
683,910
1,796,840

2.11
1.60
0.82
1.43

February 2002
Month :
Available Days
27.0 Days
Effective Days
18.0 Days
Effective Working Hrs
378 Hours

PT. PAMAPERSADA NUSANTARA


TUTUPAN MINE (PT ADARO INDONESIA)

Location

Sequence

Shell - Bench - Strip

From
2031
2046
2055

From
To
2036 HW084B156S08
2046 LWB072S11
2056 HW036B036S09

2001
2037
2044
2048
2051

2007
2041
2045
2049
2054

To
HW084B132S08
LWB072S11
HW036B036S10

PN1

Sub Total Volume Schedule

PN2

HW036B120S20
HW036B108S20
HW036B072S17
HW036B060S16
HW036B048S14

HW036B096S18
HW036B084S19
HW036B072S18
HW036B060S17
HW036B036S15

Sub Total Volume Schedule


2042 2043 LWB084S04
2047 2047 HW036B072S06
2050 2050 HW036B060S07

HW036B084S04
HW036B072S06
HW036B060S07

PN3

Sub Total Volume Schedule

OB Strip
(Bcm)
267,860
134,390
66,800
469,050
355,400
323,840
302,610
375,510
573,420
1,930,780
35,340
84,390
5,680
125,410

Volume
Coal Exp.
(Tonnes)
20,440
415,120
435,560
171,480
194,350
115,000
118,190
959,080
1,558,100
4,820
168,170
126,360
299,350

2,525,240

2,293,010

Strip Ratio
13.10
0.16
1.08
2.07
1.67
2.63
3.18
0.60
1.24
7.33
0.50
0.04
0.42

General

Input Data

Location

PN1

PN2

Equipment Setting for OB Strip


Eff. WH
(Hrs)
PC 4000 85%
0.20 1350
28,934
77
OK 05
80%
0.28 850
17,146
102
EX 805
85%
0.80 900
19,290
310
Sub Total Volume Setting Unit
Loader
Type

Coal
Expose
(Tonnes)

435,560

1,558,100

Coal Mined (Tonnes)


Coal Inventory Est. (Tonnes)
Closing Inventory
By
By Unit
Opening
Schedule Setting Inventory Schedule Unit Set

271,500

700,000

320,709

826,875

99,054

345,217

263,114

1,203,317

213,905

1,076,442

1.10

PA

Req' Prod'ty Avg.Bcm /Days

PC 3000 85%
1.00 900
PC 4000 85%
0.80 1350
EX 805
85%
0.20 900
OK 05
80%
0.72 850
OK 08
80%
1.00 850
OK 13
80%
1.00 950
R 905
80%
0.40 500
OK 09
80%
0.49 850
Sub Total Volume Setting Unit
OK 09

19,290
28,934
19,290
17,146
17,146
19,164
10,086
17,146

386
308
77
261
363
363
145
177

0.41 850
17,146
Sub Total Volume Setting Unit

148

85%

4.23

300

6,300

125,410
1599

TOTAL VOLUME SETTING UNIT

3,005,036

2
1
Target Coal Mined (Tonnes)
Prod'ty Avg. Ton / Eff. Eff. WH
Req'
(Updat
Days
(Hours)
70%
1.00
720
10,584
318
85%
0.88
250
3,927
339
80%
0.04
480
337
15
Sub Total Volume Setting Unit

Setting
of
Type
EX 803
PC 750
R 906

EX 804
PC 1100
R 903
R 904

PA

85%
85%
80%
80%

1.00
1.00
0.98
0.60

950
480
480
480

16,958
8,568
7,903
4,853
-

PT PAMAPERSADA NUSANTARA

PAMA

469,050

1,930,780

80%

PC 1000
TOTAL VOLUME SCHEDULE

OB Stripping
Coal Exposed
Coal Mined
Coal Hauling

Halaman 4 dari 9

386
386
356
218

320,709

Monthly Map Document

MINE PLAN ADARO - ENGINEERING WORKSHOP 2002

ST-20

ST-19
ST-17

ST-16

ST-21

ST-22

ST-23

ST-24

ST-25
ST-26

RL 132

ST-18

ST-27
ST-28
ST-30
ST-29

RL 144

RL 24

RL 36

RL 24

RL 12

RL 144

ST 21

ST-12

ST 20

ST-13
ST-14

ST 15

ST 14
ST 13

ST 19
ST 18
ST 17
ST 16

ST 22

ST 24

ST 23

ST 25
ST 26
ST 27
ST 28
ST 29
ST 30

ST-15

ST 12

ST 11

ST 10

ST 09

ST-00
ST 08

ST-01
ST-02

ST 07

ST-07

ST-11

ST-10

ST-09

ST-08

ST 06

ST-06

ST 05

ST-03
ST 04

ST 03
ST 02
ST 01

ST-04

ST-05