Factory Acceptance Test Centrifugal Pump Check Sheet


TOPAZ Drilling Platform

Equipment

Location

Item

Check List

Check the nameplate details are both correct and complete

Check location, elevation, orientation and also that the pump is level

3
4

Check that the pump, the motor and the baseplate holding down arrangement and
corrects and secured
Check for any installation damage(s)

Check that the pump,coupling , baseplate and the auxiliary piping are installed in
accordance with the specifications and the approved drawings

Check the pump, driver , coupling and baseplate for cleanliness

Check that the preservation has been carried out in accordance with the approved
documents

Where applicable check that installation of platform and ladder are in accordance
with the approved drawings

Check both the painting and insulation for damage

10

Check that the earthing and bonding is in accordance to the project specification

11

Check that the suction and discharge pipe spools are in accordance with the
design drawings

12

Chect that there is correct alignment between flanges when the suction and
discharge pipework is unbolted

13

Check that the Y-strainer with the DN 40 mesh is installed

14

Check Mechanical Seal System

15

Check Pump Alignment

16

Check the free rotation of the shaft fine

17

Check that there is adequate space around the unit to withdraw the internals
with suitable lifting equipment

18

Check that the coupling and the coupling guards has been installed

19

Produced a set of mark up drawings in accordance with the installation

20

Pump has successfully run tested and confirmed to requirment

Contractor Innitiate

Project Name

21

Produced a defect list for inclusion in the punch list issue

Remarks
Date
Carried Out By
Contractor

Name

Signature

Client Innitiate

Signature