Project Name
Project Budget
Project Deadline
Project Sponsor
Project Manager
Date Prepared
Client/ Customer
February 3, 2015
Amazon
Project Statement: To increase satisfactory customer reach in Dallas Metroplex area and reduce
shipping time to consumers by 50%.
Milestones
First day of Construction
Last day of construction
Completion of inside
installations
Final completion with Robots
Deliverable
All materials, equipment, and
people needed onsite.
All outside framework and
interior.
Pipelines/plumbing/electricity
finished.
Shelving, organizing, and routes
planned/built.
Robots are programmed,
Cafeterias are ready, and
computer system
installed/updated.
Date
5/1
10/1
12/1
4/1
Assumptions
List and describe the assumptions made in the decision to charter this project. Please note that all
assumptions must be validated to ensure that the project stays on schedule and on budget.
-Land is purchased by Amazon previously.
-All additional expenses on top of the basic construction is paid for by Amazon.
-Sponsors supply needed materials at a discounted rate/for free.
-There are no problems faced for Amazon to build a warehouse at the location.
-There were no shortage of materials as the team is very experienced and knowledgeable.
-The process of construction is followed by the plan without surprises.
Key Stakeholders
Identify the key stakeholders and describe their roles and responsibilities.
Resource
Boss
Teams/ Coworkers
Suppliers
Family
Potential Risks
Identify the potential risks and obstacles at the high level that may cause the project to fail.
Risk
Fire/explosion
Product Damage
Worker Injury
About 100 employees are killed and 95,000 injured every year
while operating forklifts in all industries. Forklift turnovers account
for a significant percentage of these fatalities. Injuries happen
here when forklifts run off the dock, products fall on employees or
equipment strikes a person. Back injuries may occur from
improper lifting or overexertion. Chemical burns are possible if
spills of hazardous materials occur. Drive forklifts safely, never
exceeding 5 mph and slow down in congested areas, those with
slippery surfaces, or on docks/dock plates. Train, evaluate and
certify all operators to ensure that they can operate forklifts
safely. Provide general ergonomics training and task-specific
training.
Acceptance Criteria
What are the acceptance criteria?
-This project is delivered within XX% of the budget and XX month of scheduled date
-The land built on was checked for stability.
-Land was chosen where least amount of habitat is destroyed.
-Building is constructed to withstand extreme changes in weather in DFW.
-The materials used for construction are the same quality as the ones listed in the contract.
- The construction of the building is consistent with the blue prints.
-The building is efficiently constructed with spacing for storing packages without compromising
safety of packages.
-The building exceeds health and safety regulations
-Building minimizes carbon emission
-Maintenance methods have been ensured
-The internal finishing is neat and clean.
-Staff workers have amenities such as multiple clean restrooms and cafeteria
-Product shipping/drop off is quick and efficient.
-Shipping trucks averages loading time is cut down.
Signatures/Approvals
The signatures below formally approve the project charter and empower the project manager to
proceed with the project as outlined in this chart.
Date:
Date:
Date: