Equipment number calculation (EN)

Rules

Det norske veritas

Pt.3 Ch.3 Sec.3 Anchoring and mooring equipment Page 42


The equipment number is given by the formula

1)

H = effective height in m from the summer load waterline to the top of the uppermost deck
measured as follows:
H = a + hi
Therefore
a = distance in m from summer load waterline am
hi = height in m on the centre line of each tier of
tier, hi shall be measured at centre line from the u
local discontinuity in the upper deck

2)

A = area in m2 in profile view of the hull, superstructures and houses above the summer lo
which is within L of the ship. Houses of breadth less than B/4 shall be disregarded.
Note

In the calculation of hi and A sheer and trim sha

1)

H = a + hi
Freeboard=Depth-draft
1st Dk
A Dk
B Dk
C Dk
D Dk
Bridge Dk
Top of wheelhouse Dk

a
h0
h1
h2
h3
h4
h5
h6

H=

3.8 m
3
3m
3.6 m
2.8 m
2.8 m
4.05 m
2.6 m

25.65

E N = 2/3 + 2 B H + 0.1

1833.3526

V
Diving

E N = 2/3 + 2 B H + 0.1 A

o the top of the uppermost deckhouse, to be

from summer load waterline amidships to the upper deck at side


n the centre line of each tier of houses having a breadth greater than B/4. For the lowest
asured at centre line from the upper deck, or from a notional deck line where there is
in the upper deck

nd houses above the summer load waterline,


4 shall be disregarded.

of hi and A sheer and trim shall be ignored.

2)

Area

Deck
1st Dk
A Dk
B Dk
C Dk
D Dk
Bridge Dk
Top of wheelhouse Dk
Freeboard profile area

L in mtr.

lxh

97.079
64.847
65.8
66.9
47
29.8
18.05

291.237
194.541
236.88
187.32
131.6
120.69
46.93
365.895

Area

1575.09

Calculated value lies in letter F

as per DNV

V4910 DSV
Diving Support Vessel

Units
m2
m2
m2
m2
m2
m2
m2
m2

Vessel particulars
Length overal (Loa)
Length of waterline (Lwl)
Length between perpendicular (Lbp)
Breadth moulded (B)
Depth (D)
Draft (T)
Speed (Sp)
Displac. () At 6 m draft
Class

101.2 m
91.8 m
90.3 m
24 m
9.8 m
6m
11.5 knote
9376 tons
DNV

how to create log file in ip messenger (that means viewing history)


1)
2)
3)
4)

open note pad and save as ipmsg.log.. Put this file in mydocument
right clik on ipmsger, select setting
see fig 1
user name suganya , group outfitting podu ma
see fig 1
thereaft select detail log setting
one window appear see figure 2
what all ticked u all tick that
then click log file, specify the location the of
note pad where save k

figure 1

figure 2