0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
138 Ansichten1 Seite
All City-maintained streets are inspected every 3 years to collect pavement condition data. The information is used to establish The Pavement Condition Index (PCI) for City streets. The PCI is an objective numeric measurement of the pavement's condition.
All City-maintained streets are inspected every 3 years to collect pavement condition data. The information is used to establish The Pavement Condition Index (PCI) for City streets. The PCI is an objective numeric measurement of the pavement's condition.
All City-maintained streets are inspected every 3 years to collect pavement condition data. The information is used to establish The Pavement Condition Index (PCI) for City streets. The PCI is an objective numeric measurement of the pavement's condition.
All City-maintained streets are inspected every 3 years to collect pavement condition data. The City uses this information to establish the Pavement Condition Index (PCI) for City streets. The PCI was developed by the United States Army Corps of Engineers, and it is commonly used in transportation civil engineering. The Pavement Condition Index (PCI) is an objective numeric measurement of the pavement's condition The PCI can range from 1-100 Good condition equals PCI above 70 Poor condition equals PCI below 50
Newly Paved
Good PCI
Fair PCI
Poor PCI
This street was just
This street is in Good The street pictured here is The street pictured here is recently paved and is in no condition. If it does not considered to be in Fair considered to be in Poor need of maintenance at condition and is in need receive preventative condition and is in need of this time. Within 7 years, maintenance soon, it will of an asphalt repair mill a major mill and overlay or this street will need a and overlay. deteriorate to Fair reconstruction. surface treatment. condition, which requires a more expensive resurfacing project.