Beruflich Dokumente
Kultur Dokumente
#1
Created Power Point for speech, wrote notes and practiced presenting the speech with my
assigned
mentor.
Delivered
speech
with supervisor
awesome
evaluation
#5 I will increase my knowledge
of complaints
and
investigation
processes
by reviewingpresent.
policies Obtained
and procedures
and being
trained by area
and
peer
feedback
from
club
members.
Also
won
best
speech
of
the
meeting.
(Votes
are
specialist. This will be evaluated by assisting with 1 investigation and the completion of 10 complaint reviews with specialists
supervision.
#2
2/5/201
5
#4
2/10/20
15
#6
2/11/20
15
#4
2/11/20
15
#2
2/12/20
15
#5
2/12/20
15
#2
2/16/20
15
#6
2/17/20
15
#4
2/18/20
15
#6
2/18/20
15
#4
2/19/20
15
2/24/20
15
#5
#6
2/25/20
15
#5
2/26/20
15
#6
2/26/20
15
#2
3/3/201
5
#3
3/5/201
5
#6
3/5/201
5
#2
3/6/201
5
#1
3/6/201
5
#6
3/9/201
5
#3
3/12/20
15
#2
3/12/20
15
#1
2
2
2
0.5
1.5
2
2
1
2.5
1
1
1
1.5
1
1
0.5
0.5
2
1
3/13/20
15
#5
3/13/20
15
#6
3/16/20
15
#6
3/17/20
15
#6
3/17/20
15
3/23/20
15
#5
#6
3/23/20
15
#5
3/24/20
15
#5
3/25/20
15
#3
3/26/20
15
#3
3/26/20
15
#1
3/26/20
15
3/27/20
15
3/31/20
15
4/1/201
5
4/3/201
5
4/7/201
5
4/7/201
5
4/9/201
5
4/9/201
5
#2
#5
#3
#3
#5
#1
#2
#1
#2
4/10/20
15
#3
4/10/20
15
#5
4/10/20
15
#6
4/13/20
15
#6
4/14/20
15
4/17/20
15
#3
#6
book. My topic was about the Black Death and genetic mutations being a possible
evolutionary trait of the survivors. I Also found out that there is speculation that the plague
and or small pox maybe the cause of a protein mutation causing 10% of Europes population
to be immune to HIV and the reoccurring instances of plague had caused the gene
frequency to increase. My mentor for toastmasters is in my class and evaluated me for this
5 minute speech. I included 3 resources when only 1 was required.
Completed 10 complaint risk assessments with assistance on 6 from area manager and
complaint analyst
Received information back on Supplier Risk Assessments from Quality Control Supervisor
and QC Specialist as well as from R&D. Compiled and completed forms for meeting on
Monday.
Held Risk Assessments Meeting. Completed 2 RA's including adding them to our document
management system/ hardcopy folder, updating document management system fields.
Started next round researching information.
Created 5 more Risk Assessment files for the next meeting giving departments time needed
to collect and return information back to me. Scheduled next RA meeting. It is time
consuming determining audit status and material type/ manufacture location among other
items. Also received information on 3 RA's from yesterday and followed up with area
management for plan of action.
Completed 9 complaint risk assessments and still learning new things as not all complaints
are consistent with the past. Developed a new script for a specific product complaint.
Completed 3 more Supplier Risk Assessments and working with area management to get
more RA's scheduled for succeeding meetings.
Scheduled meeting with complaint analyst to work on a complaint investigation to complete
goal. Continuing to assist with complaints weekly. Need to meet with manufacturing
management to perform Root Cause Analysis.
Performed complaint investigation met with manufacturing area discussed root cause and
preventative action.
Performed Mock Recall. Still need to work on final report with analysis and outcomes to be
given to area director. Inventory system went down for 3 hours. Tried another way around
this for those 3 hours until IT got it back up and running.
Reviewing Recall Tallies. Recovered over 100%. Discussed concerns and gaps in processes/
programs as well as discussed possible improvements and planning for future mock recalls
with area supervisor, director and my manager.
2nd Speech scheduled for today canceled. Speech evaluator was ill and they needed a
volunteer to drop. I am working on a Power Point to help guide me through thought as I have
learned notes are a downfall to my speaking skills. I get lost when using them.
Toastmaster meeting attendance and participation. Supplied feedback to speakers, votes,
and evaluated for a speech evaluator.
Completed 10 more Complaint risk assessments. Goals achieved now will continue to assist
weekly to meet hour requirement.
Creating Mock Recall Report. Colleague and I are collecting all the data and reports to create
the final report. Finished raw and tablet data.
Continued to collect data on the 36 finished products we recalled. Had to document current
locations if any and or the customer recall amount and date ranges of that data we pulled.
(Time consuming and a lot of data analysis!)
Complaint Risk Assessments. Completed 22 complaint Risk Assessments. Only had to get
advice on one. All were minor issues.
Worked on and ironed out my power point for my speech on Thursday. Practiced speech a
little
Looked for something to fulfill my role (Thought of the day" for Toastmaster meeting on
Thursday. Found something that works well with my speech. Wrote down thoughts on what I
want to say about it.
Practiced speech
Attended and fulfilled the role "Thought of the day" and presented 2nd speech. Also
evaluated a speech evaluator role.
Worked on Mock Recall Report with Colleague and the supervisor in Charge over complaints.
I ran into some issues on reporting certain things and had to discuss inventory tracking with
Will Call and Shipping departments. This is helping improve the way we do future mock
recalls by knowing who to contact and what information we will need from those
departments.
Completed 24 Complaint Risk Assessment and taught a colleague how to perform this task.
Combined information from R&D,and QC into supply risk assessment forms. Held meeting
and will process 5 assessments thru the document management system on Monday next
week.
Completed goal for supplier risk assessments. I held 3 of 2 meetings the goal asked for and
completed 15 total supplier risk assessments of the 10 stated in the goal. Today I completed
the last 5 from last weeks meeting.
Assisted more time on the mock recall final report with colleagues. Goal considered
complete but still offering assistance.
Prepared request and Risk Assessments for next supplier risk assessment meeting
2
1
2
1.25
0.5
1
1
9.25
1.5
1
1.5
1
2
2
1.5
1
1
0.5
1.5
2.5
1.5
1.5
0.75
1
2
102.58
TOTAL HOURS
Goal Totals:
Goal #1 - 16.58 hours
Goal #2 13.25 Hours
Goal #3 20.25 Hours
Goal #4 15.25 Hours
Goal #5 15.25 Hours
Goal #6 22.5 Hours