PROPOSED REVISION
2
PROVIDING AND LAYING CEMENT CONCRETE 1:4:8 FOR BELOW
FOUNDATION (M3)
MATERIAL
STONE AGG: 20 MM NOMINAL SIZE
COARSE SAND
CEMENT
LABOUR
MASON
HELPER
MIXER
VIBRATOR
SUNDRIES
TOTAL
ADD WATER CHARGES 1 %
SHUTTERING
TOTAL
ADD 15 % CPOH
TOTAL
ADD 7 % TAX
TOTAL
WORK ORDER
PROPOSED REVISION
PROPOSED REVISION
M15 RMC FOR PLINTH CRADE SLAB
MATERIAL
M15 CONCRETE
PUMPING CHARGES OF PUMP
PIPING WORK & ACCESSORIES
LABOUR
MASON
HELPER
TOTAL
ADD WATER CHARGES 1%
TOTAL
ADD CPOH 15%
TOTAL
ADD TAX 7 %
TOTAL
SAY
WORK ORDER RATE
PROPOSED REVISION
FE 500 TMT BAR (100KG)
TMT BAR
COVER BLOCK
LABOUR
B.B
HELPER
SUNDRIES
TOTAL
ADD WATER CHARGES 1%
TOTAL
ADD CPOH 15%
TOTAL
ADD TAX 7 %
TOTAL FOR 100 KG
TOTAL FOR 1 TON
WORK ORDER RATE
PROPOSED REVISION
RANDOM RUBBLE MASNORY 1:6 (1 CUM)
MATERIAL
STONE
THROUH AND BOND STONE
CEMENT MORTAR 1 : 6
LABOUR
MASON
HELPER
CEMENT CONCRETE 1 : 6
SUNDRIES
TOTAL
ADD WATER CHARGES 1%
TOTAL
ADD CPOH 15%
TOTAL
ADD TAX 7 %
TOTAL
SAY
WORK ORDER RATE
PROPOSED RATE
PLASTERING ( 10 SQM)
CONCRETE MORTAT 1 : 6
LABOUR
MASON
HELPER
SCAFFOLDING & SUNDRIES
TOTAL
ADD WATER CHARGES 1 %
TOTAL
ADD CHOP 15%
TOTAL
ADD TAX 7 %
TOTAL FOR 10 SQM
1 SQM
SAY
WORK ORDER RATE
PROPOSED REVISION
400mm Thick Block Work
Work Order Rate
PROPOSED REVISION
PAINTING
Work order rate
Proposed Revision
QTY
DAY
DAY
RATE
0.041
0.041
6750
5000
0.4
2
600
450
2
UNIT
CUM
CUM
BAG
DAY
DAY
DAY
DAY
LS
SQM
QTY
RATE
0.85
0.47
3.435
1148
1872
375
0.1
2.33
0.07
0.07
14.3
600
450
800
350
1
2.5
241
UNIT
3
QTY
CUM
CUM
CUM
TON
DAY
DAY
DAY
DAY
LS
UNIT
RATE
0.67
0.22
0.445
0.32
1148
1148
1872
7500
0.1
2.33
0.07
0.07
14.3
600
450
800
350
1.78
4
QTY
RATE
CUM
5250
CUM
200
0.17
2.9
600
450
DAY
DAY
UNIT
5
QTY
RATE
QUINTAL
LS
1.05
0.105
5300
100
DAY
DAY
LS
1
1
26.91
600
450
2.42
UNIT
6
QTY
RATE
CUM
NOS
CUM
DAY
DAY
LS
LS
1
7
0.33
822
13
4725
1.07
1.78
45.76
4.42
850
750
2.42
2.42
7
UNIT
CUM
DAY
DAY
LS
QTY
RATE
0.144
4725
0.67
1.67
12.61
850
750
2.42
PROJECT
LYSIS
AMOUNT
276.75
205.00
240.00
900.00
1,621.75
16.22
1,637.97
246.00
1,884.00
188.40
185.00
13.00
198.00
130.00
250.00
AMOUNT
975.80
879.84
1,288.13
60.00
1,048.50
56.00
24.50
14.30
4,347.07
43.47
602.50
4,993.04
748.80
5,741.84
402.00
6,143.00
5,000.00
6,800.00
AMOUNT
769.16
252.56
833.04
2,400.00
60.00
1,048.50
56.00
24.50
25.45
5,639.71
56.40
5,696.00
854.42
6,550.42
458.53
7,008.95
5,900.00
8,850.00
AMOUNT
5,250.00
200.00
102.00
1,305.00
6,857.00
68.57
6,925.57
1,038.84
7,964.41
557.51
8,521.91
8,525.00
6,000.00
9,800.00
AMOUNT
5,565.00
10.50
600.00
450.00
65.12
6,690.62
66.91
6,757.53
1,013.63
7,771.16
543.98
8,315.14
83,155.00
72,000.00
92,000.00
AMOUNT
822.00
91.00
1,559.00
909.50
1,335.00
111.00
10.70
4,838.20
48.38
4,886.58
732.96
5,619.54
393.35
6,012.89
6,000.00
3,500.00
5,000.00
AMOUNT
680.40
569.50
1,252.50
30.52
2,532.92
25.33
2,558.25
383.75
2,942.00
206.00
3,148.00
314.80
315.00
300.00
470.00
1733/SQM
3000/SQM
1300/SQM
1700/SQM
140/sqm
190/sqm
WO RATE
excavation
pcc 1:4:8
RR masonry
Plinth beam 1:2:4
400mm block
200mm block
Coping
plastering
Angle
Barbed wire
painting
TOTAL
25
25
25
25
25
25
25
50
2.3
2.3
1.53
0.6
1
1
0.23
1
2.2
0.08
2.1
0.1
0.6
1.2
0.3
2.1
126.5
4.6
80.325
1.5
15
30
1.725
105
10
150
105
130
5000
3500
6000
1733
1300
5900
300
1050
84
140
WO AMOUNT
16445
23000
281137.5
9000
25995
39000
10177.5
31500
10500
12600
14700
474055
4500 361462.5
3000
1700
70
1143
8855
5257.8
2525
3787.5
1108
1911.3
80325
19005
12000
470
45000
51000
0
49350
180
18900
4200
133380
17850
19811.6