Sie sind auf Seite 1von 55

DISEO MUROS DE CONCRETO ARMADO

H = 7.10 M
1. DATOS DE ENTRADA
DIMENSIONAMIENTO PLANTEADO DEBIDO A RESTRICCIONES
DEL TERRENO EN AMBOS LADOS

Datos de Suelo
=
=

=
suelo =
Ka =
Kp =

tn/m3

1.80
32

1.80
32
0.80
0.30
3.00
0.45

tn/m3

kg/cm2

Datos de muro
hz (altura de zapata)

B1 (Externa)
B2 (central)
B3 (interna)
L : Ancho de Zapata

=
=
=
=

1.00
1.8
0.70
0.65
3.15

R1 (Altura de relleno 1) =
R2 (Altura de relleno 2) =

Espesor de Muro
t1 (sup) =
t2 (inf) =

H pantalla =

1.70 m
7.10 m

concreto =

210 kg/cm2
4200 kg/cm3

f'c =
fy =

S/C

m
m
m
m
m

0.30 m
0.70 m

7.10 m

2.40 tn/m3

0.30 tn/m2

2. ANALISIS POR CADA METRO DE LONGITUD


W s/c

0.30

300

E s/c

90

8.10

M s/c =

729

4.05

90 kg/m
729 kg
2952.45 kg.m

Wa

Ka
0.30

1800

Ea

4374

4.05

17714.7 kg

Ma

= 17714.7

2.7

47829.69 kg.m

Wp

Kp
3.00

1800.00

2.70 =

Ep

14580

1.35

19683 kg

Mp

19683

0.9

17714.7 kg.m

8.1

4374 kg/m

14580 kg/m

3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD
Zonas
1

0.65

7.1

1800

Cargas (kg)
8,307.00

Brazo de Giro (m)


2.83

Momentos (kg.m)
23,467.28

0.7

7.1

2400

11,928.00

2.15

25,645.20

1.8

1.7

1800

5,508.00

0.90

4,957.20

3.15

2400

7,560.00

1.58

11,907.00

300

540.00

2.83

1,525.50

7.10

2400

2,044.80

1.65

3,373.92

ancho
6
columnas extremas

1.8
0.3

0.4

35,887.80
VERIFICACION POR DESPLAZAMIENTO
Factu =

Es/c + E a

Fres =

Ep+u x Cargas

Fsd

18443.7 Kg

1.94

35,832.51 Kg
>

1.50

CORRECTO

70,876.10

VERIFICACION POR VOLTEO


Mact

M s/c + Ma

50,782.14 kg.m

Mres

Mp + Momentos

88,590.80 kg.m

Fsv

1.74

>

1.50

CORRECTO

PRESION DEL TERRENO

B MresM act
e=
2
P

P =

35,887.80 kg

MO =

Mres-Mact

Mo/P

= B/2 - d

35887.8 =
1.05

37,808.66 kg.m

17032.266670687

1.7032266671

1.054 m
0.521 m

B/6 =

0.525 m

>

0.521

CORRECTO

4. DISEO POR CONCRETO ARMADO

4.1 DISEO DE PANTALLA


kp

wu =

1.8

0.30

Vu =

6901.20

3.55

24,499.26 Kg

24499.26 2.36666667

57,981.58

Mu =

7.1 =

6,901.20 kg/m

Vc =

b x d

1800

0.85

0.53 14.49137675

100

100

65

42,434.37 >

Vu
24,499.26

65

Calculo del acero en pantalla


Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:

70.00
5
65
100
210
0.9
4200

fy (Kg/cm2):

b (cm)
M (tn.m)
As (cm2)

100
57.981582
24.70

1" @ 0.30 m + BASTONES DE 5/8" @ 30

= As
bd

Refuerzo Mnimo

min = 0.0018

0.0040 >

parte superior = 0.0018 x 100 x 0.3 =


parte inferior = 0.0018 x 100 x 0.7 =

Ka s
x1.7 x(5h c )3
6

( )

K a =tan 2 45

Ka =tg2( 45 - 32/2 ) =

h
=
2
v

0.307

Lc = hc + d

usar

Lc : tambien 1/3 H pantalla

Utilizado

OK!

5.4 cm2 / m
12.6 cm2 / m

Como la pantalla es de seccin variable y asumiendo a = d / 5, ademas As1 = As2 se obtiene

M max /2=

Acero colocado:

hc =
Lc =
Lc =

1.4
2.05 m
2.1 m

2.40 m

26.25 cm2

CORRECTO

As = t bt d

Refuerzo Horizontal

Arriba:
2/3 As

= 0.0018 x 100 x 30 =

2
A st =
3

1/3As

1
A st =
3
Intermedio:

1/2" @ 0.30 m

1.8

3/8" @ 0.30 m

= 0.0018 x 100 x 50 =

2
A st =
3

1
A st =
3
Abajo:

9 cm2 / m
6

1/2" @ 0.25 m

3/8" @ 0.25 m

= 0.0018 x 100 x 70 =

2
A st =
3

1
A st =
3
36 36 x 1.91 =
3/4" @ 0.30 m

Acero de montaje:

5.4 cm2 / m

3.6

12.6 cm2 / m

8.4

5/8" @ 0.25 cm

4.2

1/2" @ 0.30 m

68.76 < S

Smax = 30 cm

4.1 DISEO DE ZAPATA


DISEO DE LA PUNTA

wu =

1.67

=
17032.27 =

Mu =

28443.885340047

1.62 =

Vu

Wu ( B3-d) =

Vc =
b x d =

28443.88534 kg
46079.09 kg.m
25599.50 kg

0.85

0.53 14.49137675

100 x

100

90

58,755.29 >

25,599.50 CORRECTO

90

58,755.29 >

-6,651.00 CORRECTO

90

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:

100.00
10
90
100
210
0.9
4200

fy (Kg/cm2):

b (cm)
M (tn.m)
As (cm2)

100
46.08
13.79

Se coloca acero en doble malla :


5/8" @ 0.25 m

Acero colocado :

en doble malla

DISEO DEL TALON

Wu =

1.5 x hz x + 1.8 x x R1 = 26604 Kg/m

Vu

Wu ( B3-d) =

Vc =

-6651 kg
0.85

b x d =

100 x

Mu =

Wu x B3xB3/ 2

0.53 14.49137675

90
=

5620.095

Datos
h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

Asmin zapata :

100

Momentos en tn.m
100.00
10
90
100
210
0.9
4200

0.0018

En cada cara :

b (cm)
M (tn.m)
As (cm2)

100

9 cm2

100.00
=

100
5.62
1.66

18

cm2

5/8" @ 0.25 m

Refuerzo transversal
As temp = 0.0018 x 100 x 100 =
En cada cara

18
9

5/8" @ 0.30 m

DISEO MUROS DE CONCRETO ARMADO


H = 6.50 M
1. DATOS DE ENTRADA

DIMENSIONAMIENTO PLANTEADO DEBIDO A


RESTRICCIONES DEL TERRENO EN AMBOS LADOS
Datos de Suelo

=
=

tn/m

1.80
32

=
suelo =
Ka =
Kp =

1.80
32
0.80
0.30
3.00
0.45

tn/m

kg/cm2

Datos de muro
hz (altura de zapata)

B1 (Externa)
B2 (central)
B3 (interna)
L : Ancho de Zapata

=
=
=
=

1.00
1.8
0.55
0.5
2.85

R1 (Altura de relleno 1) =
R2 (Altura de relleno 2) =

f'c =
fy =

S/C

m
m
m
m
m

Espesor de Muro
t1 (sup) =
t2 (inf) =

0.30 m
0.55 m

H pantalla =

1.7 m
6.5 m

6.50 m

concreto =

210 kg/cm2
4200 kg/cm3

2.40 tn/m3

0.30 tn/m2

2. ANALISIS POR CADA METRO DE LONGITUD


W s/c

0.30

300

E s/c

90

7.50

M s/c =

675

3.75

0.30

1800

90 kg/m
675 kg
2531.25 kg.m

Ka
Wa

Ea

7.5

4050 kg/m

4050

3.75

15187.5 kg

Ma

15187.5

2.5

37968.75 kg.m

Wp

3.00

1800.00

2.70 =

Ep

14580

1.35

19683 kg

Mp

19683

0.9

17714.7 kg.m

Kp
14580 kg/m

3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD

Zonas
1

0.5

H
6.5

1800

Cargas (kg)
5850

0.55

6.5

2400

1.8

1.7

2.85

1.8

2.6

Momentos (kg.m)
15210

8580

2.075

17803.5

1800

5508

0.9

4957.2

2400

6840

1.425

9747

300

540

2.60

1404

27318
VERIFICACION POR DESPLAZAMIENTO
Factu =

Es/c + E a

Fres =

Ep+u x Cargas

15862.5 Kg
31,976.10 Kg

Brazo de Giro (m)

49121.7

Fsd

2.02

>

1.50

CORRECTO

VERIFICACION POR VOLTEO


Mact

M s/c + Ma

40,500.00 kg.m

Mres

Mp + Momentos

Fsv

1.65

66,836.40 kg.m
>

1.50

CORRECTO

PRESION DEL TERRENO

B MresM act
e=
2
P

P =

27,318.00 kg

MO =

Mres-Mact

Mo/P

= B/2 - d

27318 =
0.96

26,336.40 kg.m

14168.0929056363

1.4168092906

0.964 m
0.461 m

B/6 =

0.475 m

>

0.461

CORRECTO

4. DISEO POR CONCRETO ARMADO

4.1 DISEO DE PANTALLA


kp

wu =

1.8

0.30

Vu =

6318.00

3.25

20,533.50 Kg

Mu =

20533.5 2.16666667

44,489.25

6.5 =

6,318.00 kg/m

Vc =

b x d

1800

0.85

0.53 14.49137675

100

100

50

32,641.83 >

Vu
20,533.50 CORRECTO

50

Calculo del acero en pantalla


Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

55.00
5
50
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

100
44.48925
25.01

1" @ 0.30 m + BASTONES DE 5/8" @ 30

= As
bd

Refuerzo Mnimo

min = 0.0018

0.0053 >

parte superior = 0.0018 x 100 x 0.3 =


parte inferior = 0.0018 x 100 x 0.55 =

Ka s
x1.7 x(5h c )3
6

( )

K a =tan 2 45

Ka =tg2( 45 - 32/2 ) =

h
=
2
v

0.307

Lc = hc + d

usar

Lc : tambien 1/3 H pantalla

Utilizado

OK!

5.4 cm2 / m
9.9 cm2 / m

Como la pantalla es de seccin variable y asumiendo a = d / 5, ademas As1 = As2 se obtiene

M max /2=

Acero colocado:

hc =
Lc =
Lc =

1.282
1.78 m
1.8 m

2.20 m

26.25 cm2

As = t bt d

Refuerzo Horizontal

Arriba:
2/3 As

= 0.0018 x 100 x 30 =

2
A st =
3

1/3As

1
A st =
3
Intermedio:

1
A st =
3

1.8

3/8" @ 0.30 m

7.65 cm2 / m
5.1

1/2" @ 0.25 m

2.55

3/8" @ 0.25 m

= 0.0018 x 100 x 55 =

2
A st =
3

1
A st =
3
36 36 x 1.91=
3/4" @ 0.30 m

Acero de montaje:

1/2" @ 0.30 m

= 0.0018 x 100 x 42.5 =

2
A st =
3

Abajo:

5.4 cm2 / m
3.6

9.9 cm2 / m
6.6

5/8" @ 0.25 cm

3.3

1/2" @ 0.30 m

68.76 < S

Smax = 30 cm

4.1 DISEO DE ZAPATA


DISEO DE LA PUNTA

wu =

1.67

=
14168.09 =

Mu =

23660.715152413

1.62 =

Vu

Wu ( B3-d) =

Vc =
b x d =

23660.715152 kg
38330.36 kg.m
21294.64 kg

0.85

0.53 14.49137675

100 x

100

90

58,755.29 >

21,294.64 CORRECTO

90

58,755.29 >

-9,864.00 CORRECTO

90

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

100.00
10
90
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

100
38.33
11.44

Se coloca acero en doble malla :


5/8" @ 0.25 m

Acero colocado :

en doble malla

DISEO DEL TALON

Wu =

1.5 x hz x + 1.8 x x R1 = 24660 Kg/m

Vu

Wu ( B3-d) =

Vc =

-9864 kg
0.85

b x d =

100 x

Mu =

Wu x B3xB3/ 2

0.53 14.49137675

100

90
=

3082.5

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

Asmin zapata :

100.00
10
90
100
210
0.9
4200

0.0018

En cada cara :

b (cm)
M (tn.m)
As (cm2)

100

9 cm2

100.00
=

100
3.0825
0.91

18
5/8" @ 0.25 m

Refuerzo transversal
As temp = 0.0018 x 100 x 100 =
En cada cara

18
9

5/8" @ 0.30 m

cm2

DISEO MUROS DE CONCRETO ARMADO


H = 5.10 M
1. DATOS DE ENTRADA

DIMENSIONAMIENTO PLANTEADO DEBIDO A


RESTRICCIONES DEL TERRENO EN AMBOS LADOS
Datos de Suelo

=
=

tn/m

1.80
32

=
suelo =
Ka =
Kp =

1.80
32
0.80
0.30
3.00
0.45

tn/m

kg/cm2

Datos de muro
hz (altura de zapata)

B1 (Externa)
B2 (central)
B3 (interna)
L : Ancho de Zapata

=
=
=
=

0.80
1.8
0.45
0.5
2.75

R1 (Altura de relleno 1) =
R2 (Altura de relleno 2) =

f'c =
fy =

S/C

m
m
m
m
m

Espesor de Muro
t1 (sup) =
t2 (inf) =

0.30 m
0.45 m

H pantalla =

1.7 m
5.1 m

5.10 m

concreto =

210 kg/cm2
4200 kg/cm3

2.40 tn/m3

0.30 tn/m2

2. ANALISIS POR CADA METRO DE LONGITUD


W s/c

0.30

300

E s/c

90

5.90

M s/c =

531

2.95

0.30

1800

3186

2.95

90 kg/m
531 kg
1566.45 kg.m

Ka
Wa

Ea

5.9

3186 kg/m
9398.7 kg

Ma

9398.7 1.96666667

18484.11 kg.m

Wp

3.00

1800.00

2.50 =

Ep

13500

1.25

16875 kg

Mp

16875 0.83333333

14062.5 kg.m

Kp
13500 kg/m

3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD

Zonas
1

0.5

H
5.1

1800

Cargas (kg)
4590

0.45

5.1

2400

1.8

1.7

2.75

0.8

1.8

2.5

Momentos (kg.m)
11475

5508

2.025

11153.7

1800

5508

0.9

4957.2

2400

5280

1.375

7260

300

540

2.50

1350

21426
VERIFICACION POR DESPLAZAMIENTO
Factu =

Es/c + E a

Fres =

Ep+u x Cargas

9929.7 Kg
26,516.70 Kg

Brazo de Giro (m)

36195.9

Fsd

2.67

>

1.50

CORRECTO

VERIFICACION POR VOLTEO


Mact

M s/c + Ma

20,050.56 kg.m

Mres

Mp + Momentos

Fsv

2.51

50,258.40 kg.m
>

1.50

CORRECTO

PRESION DEL TERRENO

B MresM act
e=
2
P

P =

21,426.00 kg

MO =

Mres-Mact

Mo/P

= B/2 - d

21426 =
1.41

30,207.84 kg.m

7598.5816264917

0.7598581626

1.410 m
-0.035 m

B/6 =

0.458333333 m

>

-0.035

CORRECTO

4. DISEO POR CONCRETO ARMADO

4.1 DISEO DE PANTALLA


kp

wu =

1.8

0.30

Vu =

4957.20

2.55

12,640.86 Kg

Mu =

12640.86

1.7

21,489.46

5.1 =

4,957.20 kg/m

Vc =

b x d

1800

0.85

0.53 14.49137675

100

100

40

26,113.46 >

Vu
12,640.86 CORRECTO

40

Calculo del acero en pantalla


Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

45.00
5
40
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

100
21.49
14.86

3/4" @ 0.30 m + BASTONES DE 5/8" @ 30

= As
bd

Refuerzo Mnimo

min = 0.0018

0.0044 >

parte superior = 0.0018 x 100 x 0.3 =


parte inferior = 0.0018 x 100 x 0.45 =

Ka s
x1.7 x(5h c )3
6

( )

K a =tan 2 45

Ka =tg2( 45 - 32/2 ) =

h
=
2
v

0.307

Lc = hc + d

usar

Lc : tambien 1/3 H pantalla

Utilizado

OK!

5.4 cm2 / m
8.1 cm2 / m

Como la pantalla es de seccin variable y asumiendo a = d / 5, ademas As1 = As2 se obtiene

M max /2=

Acero colocado:

hc =
Lc =
Lc =

1.006
1.41 m
1.5 m

1.70 m

17.45 cm2

As = t bt d

Refuerzo Horizontal

Arriba:
2/3 As

= 0.0018 x 100 x 30 =

2
A st =
3

1/3As

1
A st =
3
Intermedio:

1
A st =
3

1.8

3/8" @ 0.30 m

6.75 cm2 / m
4.5

1/2" @ 0.25 m

2.25

3/8" @ 0.25 m

= 0.0018 x 100 x 45 =

2
A st =
3

1
A st =
3
36 36 x 1.59 =
5/8" @ 0.25m

Acero de montaje:

1/2" @ 0.30 m

= 0.0018 x 100 x 37.5 =

2
A st =
3

Abajo:

5.4 cm2 / m
3.6

8.1 cm2 / m
5.4

5/8" @ 0.25 cm

2.7

1/2" @ 0.30 m

57.24 < S

4.1 DISEO DE ZAPATA


DISEO DE LA PUNTA

wu =

1.67

=
7598.58 =

Mu =

12689.631316241

1.62 =

Vu

Wu ( B3-d) =

Vc =
b x d =

12689.631316 kg
20557.20 kg.m
13958.59 kg

0.85

0.53 14.49137675

100 x

100

70

45,698.56 >

13,958.59 CORRECTO

70

45,698.56 >

-3,880.80 CORRECTO

70

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

80.00
10
70
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

100
20.56
7.87

Se coloca acero en doble malla :


5/8" @ 0.30 m

Acero colocado :

en doble malla

DISEO DEL TALON

Wu =

1.5 x hz x + 1.8 x x R1 = 19404 Kg/m

Vu

Wu ( B3-d) =

Vc =

-3880.8 kg
0.85

b x d =

100 x

Mu =

Wu x B3xB3/ 2

0.53 14.49137675

100

70
=

2425.5

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:

80.00
10
70
100
210
0.9
4200

fy (Kg/cm2):

Asmin zapata :

0.0018

En cada cara :

b (cm)
M (tn.m)
As (cm2)

100

7.2 cm2

80.00
=

100
2.4255
0.92

14.4
5/8" @ 0.30m

Refuerzo transversal
As temp = 0.0018 x 100 x 80 =
En cada cara

14.4
7.2

5/8" @ 0.30 m

cm2

DISEO MUROS DE CONCRETO ARMAD


H = 5.10 M
1. DATOS DE ENTRADA

Datos de Suelo
=
=

1.80
32

=
suelo =
Ka =
Kp =

tn/m3

1.80
32
0.80
0.30
3.00
0.45

Datos de muro
hz (altura de zapata)

B1 (Externa)
B2 (central)
B3 (interna)
L : Ancho de Zapata

=
=
=
=

R1 (Altura de relleno 1) =
R2 (Altura de relleno 2) =

f'c =
fy =

S/C

210 kg/cm2
4200 kg/cm3

0.80
1.8
0.45
0.5
2.75

m
m
m
m
m

1.1 m
5.1 m

Espesor de Muro
t1 (sup) =
t2 (inf) =

0.30
0.45

H pantalla =

5.10

concreto =

2.40

0.30 tn/m2

2. ANALISIS POR CADA METRO DE LONGITUD


W s/c

0.30

E s/c

90

M s/c =

531

Ka
Wa

0.30

Ea

3186

Ma

9398.7

Wp

3.00

Ep

10260

Mp

9747

Kp

3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD

Zonas
1

H
0.5

5.1

1800

0.45

5.1

2400

1.8

1.1

1800

2.75

0.8

2400

1.8

300

VERIFICACION POR DESPLAZAMIENTO


Factu =

Es/c + E a

Fres =

Ep+u x Cargas

Fsd

9929.7 Kg

1.86

18,513.90 Kg
>

1.50

VERIFICACION POR VOLTEO


Mact

M s/c + Ma

20,050.56 kg.m

Mres

Mp + Momentos

40,619.40 kg.m

Fsv

2.03

>

1.50

PRESION DEL TERRENO

B MresM act
e=
2
P
P =

19,482.00 kg

MO =

Mres-Mact

Mo/P

= B/2 - d

20,568.84 kg.m
1.056 m
0.319 m

B/6 =

0.458333333 m

>

4. DISEO POR CONCRETO ARMADO

4.1 DISEO DE PANTALLA


kp

wu =

1.8

0.30

Vu =

4957.20

2.55

Mu =

12640.86

1.7

5.1 =

Vc =

b x d

1800

0.85

100

0.53 14.49137675

100

40

40

Calculo del acero en pantalla


Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

45.00
5
40
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

100
21.49
14.86

3/4" @ 0.30 m + BASTONES DE 5/8" @ 30

= As
bd

0.0044 >

min = 0.0018

Refuerzo Mnimo

parte superior = 0.0018 x 100 x 0.3 =


parte inferior = 0.0018 x 100 x 0.45 =

Como la pantalla es de seccin variable y asumiendo a = d / 5, ademas As 1 = As2 se obtiene

Ka s
M max /2=
x1.7 x(5h c )3
6

( )

K a =tan 2 45

Ka =tg2( 45 - 32/2 ) =

h
=
2
v

0.307

Lc = hc + d

usar

Lc : tambien 1/3 H pantalla

Utilizado

hc =
Lc =
Lc =

1.006
1.41 m
1.5 m

1.70 m

As = t bt d

Refuerzo Horizontal

Arriba:
2/3 As
1/3As

= 0.0018 x 100 x 30 =

2
A st =
3

3.6

1
A st =
3

1.8

Intermedio:

= 0.0018 x 100 x 37.5 =

2
A st =
3

4.5

1
A st =
3

2.25

Abajo:

= 0.0018 x 100 x 45 =

2
A st =
3

5.4

2
A st =
3

1
A st =
3
36 36 x 1.59 =
5/8" @ 0.25m

Acero de montaje:

2.7

57.24 < S

4.1 DISEO DE ZAPATA


DISEO DE LA PUNTA

wu =

1.67

=
9226.29 =

Mu =

15407.91073002

1.62 =

Vu

Wu ( B3-d) =

Vc =
b x d =

15407.91073 kg
24960.82 kg.m
16948.70 kg

0.85

0.53 14.49137675

100 x

100

70

70

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:

80.00
10
70
100
210
0.9
4200

fy (Kg/cm2):

b (cm)
M (tn.m)
As (cm2)

100
24.96
9.59

Se coloca acero en doble malla :


5/8" @ 0.30 m

Acero colocado :

en doble malla

DISEO DEL TALON

Wu =

1.5 x hz x + 1.8 x x R1 = 19404 Kg/m

Vu

Wu ( B3-d) =

Vc =

-3880.8 kg
0.85

b x d =

100 x

Mu =

Wu x B3xB3/ 2

0.53 14.49137675

70
=

2425.5

100

70

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
2
fy (Kg/cm ):

Asmin zapata :

80.00
10
70
100
210
0.9
4200

0.0018

En cada cara :

b (cm)
M (tn.m)
As (cm2)

100

7.2 cm2

80.00
=

100
2.4255
0.92

14.4
5/8" @ 0.30m

Refuerzo transversal
As temp = 0.0018 x 100 x 80 =
En cada cara

14.4
7.2

5/8" @ 0.30 m

CRETO ARMADO

DIMENSIONAMIENTO PLANTEADO DEBIDO A


RESTRICCIONES DEL TERRENO EN AMBOS LADOS
tn/m3

kg/cm2

m
m

tn/m3

300

5.90

2.95

1800

5.9

90 kg/m
531 kg
1566.45 kg.m

3186 kg/m

2.95

9398.7 kg

1.96666667

18484.11 kg.m

1800.00

1.90 =

0.95

9747 kg

0.63333333

6173.1 kg.m

Cargas (kg)
4590

10260 kg/m

2.5

Momentos (kg.m)
11475

5508

2.025

11153.7

3564

0.9

3207.6

5280

1.375

7260

540

2.50

1350

19482

CORRECTO

CORRECTO

Brazo de Giro (m)

34446.3

19482 =
1.06

9226.2938503095

0.922629385

0.319

CORRECTO

4,957.20 kg/m
12,640.86 Kg
21,489.46

ES DE 5/8" @ 30

26,113.46 >

Acero colocado:

OK!

Vu
12,640.86 CORRECTO

17.45 cm2

5.4 cm2 / m
8.1 cm2 / m

5.4 cm2 / m
1/2" @ 0.30 m

2.8346456693
35.2777777778

3/8" @ 0.30 m

2.5352112676
39.4444444444

6.75 cm2 / m
1/2" @ 0.25 m

3.5433070866
28.2222222222

3/8" @ 0.25 m

3.1690140845
31.5555555556

8.1 cm2 / m
5/8" @ 0.25 cm

2.7135678392
36.8518518519

1/2" @ 0.30 m

2.125984252
47.037037037

45,698.56 >

16,948.70 CORRECTO

45,698.56 >

-3,880.80 CORRECTO

cm2

8" @ 0.30m

8" @ 0.30 m

pulg
3/8
1/2
5/8
3/4
1

cm

area
0.95
1.27
1.59
1.91
2.54

0.71
1.27
1.99
2.87
5.07

DISEO MUROS DE CONCRETO ARMADO


H = 3.50 M
1. DATOS DE ENTRADA

DIMENSIONAMIENTO PLANTEADO DEBIDO A


RESTRICCIONES DEL TERRENO EN AMBOS LADOS
Datos de Suelo

=
=

tn/m

1.80
32

=
suelo =
Ka =
Kp =

1.80
32
0.80
0.30
3.00
0.45

tn/m

kg/cm2

Datos de muro
hz (altura de zapata)

B1 (Externa)
B2 (central)
B3 (interna)
L : Ancho de Zapata

=
=
=
=

0.60
0.7
0.30
0.5
1.50

R1 (Altura de relleno 1) =
R2 (Altura de relleno 2) =

f'c =
fy =

S/C

m
m
m
m
m

Espesor de Muro
t1 (sup) =
t2 (inf) =

0.30 m
0.30 m

H pantalla =

1m
3.5 m

3.50 m

concreto =

210 kg/cm2
4200 kg/cm3

2.40 tn/m3

0.30 tn/m2

2. ANALISIS POR CADA METRO DE LONGITUD


W s/c

0.30

300

E s/c

90

4.10

369 kg

90 kg/m

M s/c =

369

2.05

756.45 kg.m

0.30

1800

2214

2.05

Ka
Wa

Ea

4.1

2214 kg/m
4538.7 kg

Ma

4538.7 1.36666667

6202.89 kg.m

Wp

3.00

1800.00

1.60 =

Ep

8640

0.8

6912 kg

Mp

6912 0.53333333

3686.4 kg.m

Kp
8640 kg/m

3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD

Zonas
1

0.5

H
3.5

1800

Cargas (kg)
3150

Brazo de Giro (m)


1.25

Momentos (kg.m)
3937.5

0.3

3.5

2400

2520

0.85

2142

0.7

1800

1260

0.35

441

1.50

0.6

2400

2160

0.75

1620

1.8

300

540

1.25

675

9630
VERIFICACION POR DESPLAZAMIENTO
Factu =

Es/c + E a

Fres =

Ep+u x Cargas

4907.7 Kg
11,245.50 Kg

8815.5

Fsd

2.29

>

1.50

CORRECTO

VERIFICACION POR VOLTEO


Mact

M s/c + Ma

6,959.34 kg.m

Mres

Mp + Momentos

Fsv

1.80

12,501.90 kg.m
>

1.50

CORRECTO

PRESION DEL TERRENO

B MresM act
e=
2
P

P =

9,630.00 kg

MO =

Mres-Mact

Mo/P

= B/2 - d

9630 =
0.58

5,542.56 kg.m

8365.8904910366

0.8365890491

0.576 m
0.174 m

B/6 =

0.25 m

>

0.174

CORRECTO

4. DISEO POR CONCRETO ARMADO

4.1 DISEO DE PANTALLA


kp

wu =

1.8

0.30

Vu =

3402.00

1.75

5,953.50 Kg

5953.5 1.16666667

6,945.75

Mu =

3.5 =

3,402.00 kg/m

Vc =

b x d

1800

0.85

0.53 14.49137675

100

100

25

16,320.91 >

Vu
5,953.50

25

Calculo del acero en pantalla


Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

30.00
5
25
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

100
6.95
7.62

5/8" @ 0.25 m

= As
bd

Refuerzo Mnimo

Acero colocado:

min = 0.0018

0.0040 >

parte superior = 0.0018 x 100 x 0.3 =


parte inferior = 0.0018 x 100 x 0.3 =

5.4 cm2 / m
5.4 cm2 / m

Como la pantalla es de seccin variable y asumiendo a = d / 5, ademas As1 = As2 se obtiene

Ka s
x1.7 x(5h c )3
6

( )

M max /2=

K a =tan 2 45

Ka =tg2( 45 - 32/2 ) =

h
=
2
v

0.307

Lc = hc + d

usar

Lc : tambien 1/3 H pantalla

Utilizado

OK!

hc =
Lc =
Lc =

0.69
0.94 m
1.00 m

1.00 m

9.95 cm2

CORRECTO

As = t bt d

Refuerzo Horizontal

Arriba:
2/3 As

= 0.0018 x 100 x 30 =

2
A st =
3

1/3As

1
A st =
3
Intermedio:

3/8" @ 0.25 m

1.8

3/8" @ 0.25 m

= 0.0018 x 100 x 30 =

2
A st =
3

1
A st =
3
Abajo:

5.4 cm2 / m
3.6

3/8" @ 0.25 m

1.8

3/8" @ 0.25 m

= 0.0018 x 100 x 30 =

2
A st =
3

1
A st =
3
36 36 x 1.27 =
1/2" @ 0.25m

Acero de montaje:

5.4 cm2 / m
3.6

5.4 cm2 / m
3.6

1/2" @ 0.30 cm

1.8

1/2" @ 0.30 m

45.72 < S

4.1 DISEO DE ZAPATA


DISEO DE LA PUNTA

wu =

1.67

=
8365.89 =

Mu =

13971.037120031

0.245 =

Vu

Wu ( B3-d) =

Vc =
b x d =

13971.03712 kg
3422.90 kg.m
2794.21 kg

0.85

0.53 14.49137675

100 x

100

50

32,641.83 >

2,794.21 CORRECTO

50

32,641.83 >

0.00 CORRECTO

50

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

60.00
10
50
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

100
3.42
1.82

Se coloca acero en doble malla :


1/2" @ 0.25 m

Acero colocado :

en doble malla

DISEO DEL TALON

Wu =

1.5 x hz x + 1.8 x x R1 = 13500 Kg/m

Vu

Wu ( B3-d) =

Vc =

0 kg
0.85

b x d =

100 x

Mu =

Wu x B3xB3/ 2

0.53 14.49137675

100

50
=

1687.5

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:

60.00
10
50
100
210
0.9
4200

fy (Kg/cm2):

Asmin zapata :

0.0018

En cada cara :

b (cm)
M (tn.m)
As (cm2)

100

5.4 cm2

60.00
=

100
1.6875
0.89

10.8
1/2" @ 0.25m

Refuerzo transversal
As temp = 0.0018 x 100 x 60 =
En cada cara

10.8
5.4

1/2" @ 0.25m

cm2

DISEO MUROS DE CONCRETO ARMADO


H = 2.20 M
1. DATOS DE ENTRADA

Datos de Suelo
=
=

=
suelo =
Ka =
Kp =

tn/m3

1.80
32

1.80
32
0.80
0.30
3.00
0.45

tn/m3

kg/cm2

Datos de muro
hz (altura de zapata)

B1 (Externa)
B2 (central)
B3 (interna)
L : Ancho de Zapata

=
=
=
=

0.50
0.45
0.25
0.5
1.20

R1 (Altura de relleno 1) =
R2 (Altura de relleno 2) =

f'c =
fy =

S/C

m
m
m
m
m

Espesor de Muro
t1 (sup) =
t2 (inf) =

0.25 m
0.25 m

H pantalla =

0.4 m
2.2 m

2.20 m

concreto =

210 kg/cm2
4200 kg/cm3

2.40 tn/m3

0.30 tn/m2

2. ANALISIS POR CADA METRO DE LONGITUD


W s/c

0.30

300

E s/c

90

2.70

243 kg

90 kg/m

M s/c =

243

1.35

328.05 kg.m

0.30

1800

Ka
Wa

Ea

2.7

1458 kg/m

1458

1.35

1968.3 kg

Ma

1968.3

0.9

1771.47 kg.m

Wp

3.00

1800.00

0.90 =

Ep

4860

0.45

2187 kg

Mp

2187

0.3

656.1 kg.m

Kp
4860 kg/m

3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD

Zonas
1

0.5

H
2.2

1800

Cargas (kg)
1980

Brazo de Giro (m)


0.95

Momentos (kg.m)
1881

0.25

2.2

2400

1320

0.575

759

0.45

0.4

1800

324

0.225

72.9

1.20

0.5

2400

1440

0.6

864

1.8

300

540

0.95

513

5604
VERIFICACION POR DESPLAZAMIENTO
Factu =

Es/c + E a

Fres =

Ep+u x Cargas

2211.3 Kg
4,708.80 Kg

4089.9

Fsd

2.13

>

1.50

CORRECTO

VERIFICACION POR VOLTEO


Mact

M s/c + Ma

2,099.52 kg.m

Mres

Mp + Momentos

Fsv

2.26

4,746.00 kg.m
>

1.50

CORRECTO

PRESION DEL TERRENO

B MresM act
e=
2
P

P =

5,604.00 kg

MO =

Mres-Mact

Mo/P

= B/2 - d

5604 =
0.47

2,646.48 kg.m

5933.3182189172

0.5933318219

0.472 m
0.128 m

B/6 =

0.2 m

>

0.128

CORRECTO

4. DISEO POR CONCRETO ARMADO

4.1 DISEO DE PANTALLA


kp

wu =

1.8

0.30

Vu =

2138.40

1.1

2,352.24 Kg

Mu =

2352.24 0.73333333

1,724.98

2.2 =

2,138.40 kg/m

Vc =

b x d

1800

0.85

0.53 14.49137675

100

100

20

13,056.73 >

20

Calculo del acero en pantalla


Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

25.00
5
20
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

3/8" @ 0.25 m

= As
bd

Refuerzo Mnimo

100
1.72
2.31

Acero colocado:

3.55 cm2

min = 0.0018

0.0018000 >

parte superior = 0.0018 x 100 x 0.25 =


parte inferior = 0.0018 x 100 x 0.25 =

4.5 cm2 / m
4.5 cm2 / m

Como la pantalla es de seccin variable y asumiendo a = d / 5, ademas As1 = As2 se obtiene

Ka s
x1.7 x(5h c )3
6

( )

M max /2=

K a =tan 2 45

Ka =tg2( 45 - 32/2 ) =

h
=
2
v

0.307

Lc = hc + d

usar

Lc : tambien 1/3 H pantalla

Utilizado

OK!

hc =
Lc =
Lc =

0.434
0.63 m
0.65 m

0.65 m

Vu
2,352.24

CORRECTO

As = t bt d

Refuerzo Horizontal

Arriba:
2/3 As

= 0.0018 x 100 x 25 =

2
A st =
3

1/3As

1
A st =
3
Intermedio:

1
A st =
3

1.5

3/8" @ 0.30 m

4.5 cm2 / m
3

3/8" @ 0.30 m

1.5

3/8" @ 0.30 m

= 0.0018 x 100 x 25 =

2
A st =
3

1
A st =
3
36 36 x0.71 =
3/8" @ 0.30m

Acero de montaje:

3/8" @ 0.30 m

= 0.0018 x 100 x 25 =

2
A st =
3

Abajo:

4.5 cm2 / m
3

4.5 cm2 / m
3

3/8" @ 0.30 m

1.5

3/8" @ 0.30 m

34.2 < S

4.1 DISEO DE ZAPATA


DISEO DE LA PUNTA

wu =

1.67

=
5933.32 =

Mu =

9908.6414255917

0.10125 =

Vu

Wu ( B3-d) =

Vc =
b x d =

9908.6414256 kg
1003.25 kg.m
495.43 kg

0.85

0.53 14.49137675

100 x

100

40

26,113.46 >

495.43 CORRECTO

40

26,113.46 >

892.80 CORRECTO

40

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

50.00
10
40
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

100
1.00
0.66

Se coloca acero en doble malla :


1/2" @ 0.25 m

Acero colocado :

en doble malla

DISEO DEL TALON

Wu =

1.5 x hz x + 1.8 x x R1 =

8928 Kg/m

Vu

Wu ( B3-d) =

892.8 kg

Vc =

0.85

b x d =

100 x

Mu =

Wu x B3xB3/ 2

0.53 14.49137675

100

40
=

1116

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:

50.00
10
40
100
210
0.9
4200

fy (Kg/cm2):

Asmin zapata :

0.0018

En cada cara :

b (cm)
M (tn.m)
As (cm2)

100

4.5 cm2

50.00
=

100
1.116
0.74

9
1/2" @ 0.25m

Refuerzo transversal
As temp = 0.0018 x 100 x 50 =
En cada cara

9
4.5

1/2" @ 0.30m

cm2

DISEO MUROS DE CONCRETO ARMADO


H = 1.70 M
1. DATOS DE ENTRADA

Datos de Suelo
=
=

=
suelo =
Ka =
Kp =

tn/m3

1.80
32

1.80
32
0.80
0.30
3.00
0.45

tn/m3

kg/cm2

Datos de muro
hz (altura de zapata)

B1 (Externa)
B2 (central)
B3 (interna)
L : Ancho de Zapata

=
=
=
=

0.30
0.3
0.20
0.3
0.80

R1 (Altura de relleno 1) =
R2 (Altura de relleno 2) =

f'c =
fy =

S/C

m
m
m
m
m

Espesor de Muro
t1 (sup) =
t2 (inf) =

0.20 m
0.20 m

H pantalla =

0.3 m
1.7 m

1.70 m

concreto =

210 kg/cm2
4200 kg/cm3

2.40 tn/m3

0.30 tn/m2

2. ANALISIS POR CADA METRO DE LONGITUD


W s/c

0.30

300

E s/c

90

2.00

180 kg

90 kg/m

M s/c =

180

180 kg.m

Ka
Wa

0.30

1800

Ea

1080 kg/m

1080

Ma

1080 0.66666667

1080 kg

Wp

3.00

1800.00

0.60 =

Ep

3240

0.3

972 kg

Mp

972

0.2

194.4 kg.m

720 kg.m

Kp
3240 kg/m

3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD

Zonas
1

0.3

H
1.7

1800

Cargas (kg)
918

Brazo de Giro (m)


0.65

Momentos (kg.m)
596.7

0.2

1.7

2400

816

0.4

326.4

0.3

0.3

1800

162

0.15

24.3

0.80

0.3

2400

576

0.4

230.4

1.8

300

540

0.65

351

3012
VERIFICACION POR DESPLAZAMIENTO
Factu =

Es/c + E a

Fres =

Ep+u x Cargas

1260 Kg
2,327.40 Kg

1528.8

Fsd

1.85

>

1.50

CORRECTO

VERIFICACION POR VOLTEO


Mact

M s/c + Ma

900.00 kg.m

Mres

Mp + Momentos

Fsv

1.91

1,723.20 kg.m
>

1.50

CORRECTO

PRESION DEL TERRENO

B MresM act
e=
2
P

P =

3,012.00 kg

MO =

Mres-Mact

Mo/P

= B/2 - d

3012 =
0.27

823.20 kg.m

5510.2915451895

0.5510291545

0.273 m
0.127 m

B/6 =

0.133333333 m

>

0.127

CORRECTO

4. DISEO POR CONCRETO ARMADO

4.1 DISEO DE PANTALLA


kp

wu =

1.8

0.30

Vu =

1652.40

0.85

Mu =

1404.54 0.56666667

1.7 =

1,652.40 kg/m
1,404.54 Kg
795.91

Vc =

b x d

1800

0.85

0.53 14.49137675

100

100

15

9,792.55 >

15

Calculo del acero en pantalla


Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

20.00
5
15
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

3/8" @ 0.30 m

= As
bd

Refuerzo Mnimo

100
0.80
1.42

Acero colocado:

2.84 cm2

min = 0.0018

0.0019000 >

parte superior = 0.0018 x 100 x 0.2 =


parte inferior = 0.0018 x 100 x 0.2 =

3.6 cm2 / m
3.6 cm2 / m

Como la pantalla es de seccin variable y asumiendo a = d / 5, ademas As1 = As2 se obtiene

Ka s
x1.7 x(5h c )3
6

( )

M max /2=

K a =tan 2 45

Ka =tg2( 45 - 32/2 ) =

h
=
2
v

0.307

Lc = hc + d

usar

Lc : tambien 1/3 H pantalla

Utilizado

OK!

hc =
Lc =
Lc =

0.335
0.49 m
0.50 m

0.50 m

Vu
1,404.54

CORRECTO

As = t bt d

Refuerzo Horizontal

Arriba:
2/3 As

= 0.0018 x 100 x 20 =

2
A st =
3

1/3As

1
A st =
3
Intermedio:

1
A st =
3

1.2

3/8" @ 0.30 m

3.6 cm2 / m
2.4

3/8" @ 0.30 m

1.2

3/8" @ 0.30 m

= 0.0018 x 100 x 20 =

2
A st =
3

1
A st =
3
36 36 x0.71 =
3/8" @ 0.30m

Acero de montaje:

3/8" @ 0.30 m

= 0.0018 x 100 x 20 =

2
A st =
3

Abajo:

3.6 cm2 / m
2.4

3.6 cm2 / m
2.4

3/8" @ 0.30 m

1.2

3/8" @ 0.30 m

34.2 < S

4.1 DISEO DE ZAPATA


DISEO DE LA PUNTA

wu =

1.67

=
5510.29 =

Mu =

9202.1868804665

0.045 =

Vu

Wu ( B3-d) =

Vc =
b x d =

9202.1868805 kg
414.10 kg.m
920.22 kg

0.85

0.53 14.49137675

100 x

100

20

13,056.73 >

920.22 CORRECTO

100

20

13,056.73 >

658.80 CORRECTO

20

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

30.00
10
20
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

100
0.41
0.55

Se coloca acero en una malla :


1/2" @ 0.25 m

Acero colocado :

Una malla

DISEO DEL TALON

Wu =

1.5 x hz x + 1.8 x x R1 =

6588 Kg/m

Vu

Wu ( B3-d) =

658.8 kg

Vc =

0.85

b x d =

100 x

Mu =

Wu x B3xB3/ 2

0.53 14.49137675

20
=

296.46

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:

30.00
10
20
100
210
0.9
4200

fy (Kg/cm2):

Asmin zapata :

0.0018

en una malla

b (cm)
M (tn.m)
As (cm2)

100

6.35 cm2

30.00
=

100
0.29646
0.39

5.4
1/2" @ 0.25m

Refuerzo transversal
As temp = 0.0018 x 100 x 30 =

5.4

1/2" @ 0.30m

cm2

DISEO MUROS DE CONCRETO ARMAD


H = 1.30 M
1. DATOS DE ENTRADA

Datos de Suelo
=
=

1.80
32

=
suelo =
Ka =
Kp =

tn/m3

1.80
32
0.80
0.30
3.00
0.45

Datos de muro
hz (altura de zapata)

B1 (Externa)
B2 (central)
B3 (interna)
L : Ancho de Zapata

=
=
=
=

R1 (Altura de relleno 1) =
R2 (Altura de relleno 2) =

f'c =
fy =

S/C

210 kg/cm2
4200 kg/cm3

0.30
0.25
0.15
0.3
0.70

m
m
m
m
m

0.3 m
1.3 m

Espesor de Muro
t1 (sup) =
t2 (inf) =

0.15
0.15

H pantalla =

1.30

concreto =

2.40

0.30 tn/m2

2. ANALISIS POR CADA METRO DE LONGITUD


W s/c

0.30

E s/c

90

M s/c =

144

Ka
Wa

0.30

Ea

864

Ma

691.2

Wp

3.00

Ep

3240

Mp

972

Kp

3. VERIFICACIONES
VERIFICACION DE ESTABILIDAD

Zonas
1

H
0.3

1.3

1800

0.15

1.3

2400

0.25

0.3

1800

0.70

0.3

2400

1.8

300

VERIFICACION POR DESPLAZAMIENTO


Factu =

Es/c + E a

Fres =

Ep+u x Cargas

Fsd

835.2 Kg

2.43

2,029.05 Kg
>

1.50

VERIFICACION POR VOLTEO


Mact

M s/c + Ma

483.84 kg.m

Mres

Mp + Momentos

Fsv

2.53

1,222.88 kg.m
>

1.50

PRESION DEL TERRENO

B MresM act
e=
2
P
P =

2,349.00 kg

MO =

Mres-Mact

Mo/P

= B/2 - d

739.04 kg.m
0.315 m
0.035 m

B/6 =

0.116666667 m

>

4. DISEO POR CONCRETO ARMADO

4.1 DISEO DE PANTALLA


kp

wu =

1.8

0.30

Vu =

1263.60

0.65

821.34 0.43333333

Mu =

1.3 =

Vc =

b x d

1800

0.85

100

0.53 14.49137675

100

10

Acero colocado:

2.84

10

Calculo del acero en pantalla


Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
fy (Kg/cm2):

15.00
5
10
100
210
0.9
4200

b (cm)
M (tn.m)
As (cm2)

3/8" @ 0.30 m

= As
bd

0.0028000 >

100
0.36
0.95

min = 0.0018

Refuerzo Mnimo

parte superior = 0.0018 x 100 x 0.15 =


parte inferior = 0.0018 x 100 x 0.15 =

Como la pantalla es de seccin variable y asumiendo a = d / 5, ademas As 1 = As2 se obtiene

Ka s
M max /2=
x1.7 x(5h c )3
6

( )

K a =tan 2 45

Ka =tg2( 45 - 32/2 ) =

h
=
2
v

0.307

Lc = hc + d

usar

Lc : tambien 1/3 H pantalla

Utilizado

hc =
Lc =
Lc =

0.256
0.36 m
0.40 m

0.40 m

As = t bt d

Refuerzo Horizontal

Arriba:
2/3 As
1/3As

= 0.0018 x 100 x 15 =

2
A st =
3

1.8

1
A st =
3

0.9

Intermedio:

= 0.0018 x 100 x 15 =

2
A st =
3

1.8

1
A st =
3

0.9

Abajo:

= 0.0018 x 100 x 15 =

2
A st =
3

1.8

2
A st =
3

1
A st =
3

0.9

36 36 x0.71 =
3/8" @ 0.30m

Acero de montaje:

34.2 < S

4.1 DISEO DE ZAPATA


DISEO DE LA PUNTA

wu =

1.67

=
3733.11 =

Mu =

6234.297205139

0.03125 =

Vu

Wu ( B3-d) =

Vc =
b x d =

6234.2972051 kg
194.82 kg.m
311.71 kg

0.85

0.53 14.49137675

100 x

100

20

100

20

20

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:

30.00
10
20
100
210
0.9
4200

fy (Kg/cm2):

b (cm)
M (tn.m)
As (cm2)

100
0.19
0.26

Se coloca acero en una malla :


1/2" @ 0.25 m

Acero colocado :

Una malla

DISEO DEL TALON

Wu =

1.5 x hz x + 1.8 x x R1 =

5292 Kg/m

Vu

Wu ( B3-d) =

529.2 kg

Vc =

0.85

b x d =

100 x

Mu =

Wu x B3xB3/ 2

0.53 14.49137675

20
=

238.14

Datos

Momentos en tn.m

h (cm):
r (cm):
d (cm):
b (cm):
f'c (Kg/cm2):
:
2
fy (Kg/cm ):

Asmin zapata :

30.00
10
20
100
210
0.9
4200

0.0018

en una malla

b (cm)
M (tn.m)
As (cm2)

100

6.35 cm2

30.00
=

100
0.23814
0.32

5.4
1/2" @ 0.25m

Refuerzo transversal
As temp = 0.0018 x 100 x 30 =

5.4

1/2" @ 0.30m

CRETO ARMADO

tn/m3

kg/cm2

m
m

tn/m3

300

1.60

144 kg

0.8

115.2 kg.m

1800

1.6

90 kg/m

864 kg/m

0.8

691.2 kg

0.53333333

368.64 kg.m

1800.00

0.60 =

3240 kg/m

0.3

972 kg

0.2

194.4 kg.m

Cargas (kg)
702

Brazo de Giro (m)


0.55

Momentos (kg.m)
386.1

468

0.325

152.1

135

0.125

16.875

504

0.35

176.4

540

0.55

297

2349

CORRECTO

CORRECTO

1028.475

2349 =
0.31

3733.1120988857

0.3733112099

0.035

CORRECTO

1,263.60 kg/m
821.34 Kg
355.91

6,528.37 >

cm2

OK!

Vu
821.34

CORRECTO

2.7 cm2 / m
2.7 cm2 / m

2.7 cm2 / m
3/8" @ 0.30 m

1.4173228346
70.5555555556

3/8" @ 0.30 m

1.2676056338
78.8888888889

2.7 cm2 / m
3/8" @ 0.30 m

1.4173228346
70.5555555556

3/8" @ 0.30 m

1.2676056338
78.8888888889

2.7 cm2 / m
3/8" @ 0.30 m

0.9045226131
110.5555555556

3/8" @ 0.30 m

0.7086614173
141.1111111111

13,056.73 >

311.71 CORRECTO

13,056.73 >

529.20 CORRECTO

2" @ 0.25m

2" @ 0.30m

cm2

pulg
3/8
1/2
5/8
3/4
1

cm

area
0.95
1.27
1.59
1.91
2.54

0.71
1.27
1.99
2.87
5.07

Das könnte Ihnen auch gefallen