FORM # G-110 (5/18/15)

SHT 1 of 1

SAUDI ARAMCO PRE-COMMISSIONING FORM


GEARS

EQUIPMENT TYPE:
EQUIPMENT TAG NO.:
BI/JO NO.:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.:
COMMISSIONING DATE:
1
2
3
4
5
6
7
8
9
10
11
12
13
14

USER REFERENCE:
DESCRIPTION:
PLANT NO. / LOCATION:
SERIAL NO.:

RECEIPT INSPECTION FOR DAMAGES AND SHORTAGES


YES____ NO____
SOFT FEET CHECKED.
YES____ NO____
INTERNAL ALIGNMENT CHECKED. ( TOOTH CONTACT CHECK WITH BLUING).
YES____ NO____
COLD ALIGNMENT CHECKED.
YES____ NO____
LUBE OIL SUPPLY PIPING FLUSHED AND CASING CLEANED.
YES____ NO____
ALL BLIND FLANGES REMOVED.
YES____ NO____
DIRECTION OF ROTATION CHECKED.
YES____ NO____
DOWEL PINS INSTALLED.
YES____ NO____
COUPLING HUBS ARE INSTALLED PER DWG.
YES____ NO____
NAME PLATE DATA PER DWG.
YES____ NO____
COUPLING GUARD IN PLACE AND SECURED.
YES____ NO____
SHIMS MOUNTED PER SPEC.(MATERIAL, CONFIGURATION).
YES____ NO____
TEMPERATURE SENSORS INSTALLED.
YES____ NO____
VIBRATION SENSORS INSTALLED.
YES____ NO____

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist.
Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project
Acceptance Committee.

APPROVALS
Signature & Date

SAPMT

INSPECTION

CopyrightSaudi Aramco 2009. All rights reserved.

OTHER DEPT.

OPERATIONS